01432 610152 Get a quote Call 01432 610152

Roofers in Humber

Roof repairs and re-roofs for Humber, 12 road miles north of Hereford.

We survey the frame, the barn roofs and the ridge, then send photographs of each fault with one written total.

Get a free quoteCall 01432 610152

Humber's framed houses, court barn and church

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Seventeenth-century framesTimber walls under tile or slate need checking where the covering meets the wood.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A listed court and barnHumber Court and its barn are Grade II, so consent comes before roof work.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade II* churchSt Mary's is listed, and its consent route depends on the denomination.

Humber and the Wye country

Humber on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Humber roofs, from the court barn upward

Humber surveyed: the framed walls, the court barn and the church of St Mary

The survey makes three stops: the timber frame and its tile or slate covering, the roofs of the listed court and barn, and the church, where the consent route follows the denomination.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Framed walls; 2 Court barn; 3 Church and lead.

Fig. 1 The Humber section: frame, barn slope and church lead, numbered in survey order.

Callout 1 of 3

Seventeenth-century frames under tile and slate

Start with the frame. Volume 3 of the Royal Commission's Herefordshire inventory (1934) describes its monuments 2 to 7 in Humber parish as buildings that "are of the 17th century and of two storeys, timber-framed and with tiled or slate-covered roofs". The wording covers one group of buildings and says nothing about every house in the parish, so we take it as a prompt to look and never as a rule about your roof. A framed house in Humber may carry clay tile, concrete tile or slate today, and the survey records which.

We begin where the covering meets the timber. The wall plate is the length of oak or softwood laid on the wall head to take the rafters, and the rafter feet are the lower ends of the sloping timbers. From the loft we look at both for staining. Outside, we look at the verge, the end of the roof at a gable, for any opening between timber and covering. We open up one sound area to see whether the battens, the cross-timbers that the tiles are hung on, and the underlay have kept their condition. A slipped tile beside a post can mean the timber has shifted, so the photographs show where the fault sits as well as what it is.

Timber needs to stay dry, so we aim the repair at the cause. A few courses laid again properly beat a sealed gap with the cause still behind it. Where a whole slope has worn out, approval comes next. The Planning Portal gives two limits for England, and while the work stays under both the normal outcome is no application: less than 25 per cent of the building envelope, and less than 50 per cent of the roof. Humber is in England, so that is the test for a Humber address, and Herefordshire Council Building Control can confirm how it applies to yours.

A heavier covering loads a frame differently. In the Planning Portal's guidance, a new covering that adds 15 per cent or more to the weight on the roof is the point where Building Regulations approval applies, and the rafters are assessed structurally before anything is ordered. Lifespans are ranges and never promises: Marley expects roof tiles to last "around 60 years", while HomeBuilding gives plain concrete tiles "40-50 years". Our pitched roofing page lists the coverings we fit.

Checked where a Humber covering meets the frame

  • Wall plate and rafter feet from the loft
  • Verge mortar and the gap to the frame
  • Batten condition at a sound spot
  • Underlay laps under the lifted units
  • The first courses at the eaves

Where tile meets timber is where we start, and where most of the photographs are taken.

Fig. 2 Timber frames, drawn close

Callout 2 of 3

The court barn and cowhouse roofs under listing

The second callout is the slope, the long face of a roof between ridge and eaves. Humber Court is listed Grade II (list entry 1082004, first listed 21 May 1987), and so is the Barn and Cowhouse about 15 yards north-east of Humber Court (list entry 1349806, first listed 21 May 1987). A listed roof at Humber is priced only once its protected features are known.

A barn roof is a plain, long run of slope, and its faults are easy to describe: a slipped or cracked unit, a sagging course, an open joint at the ridge. On a listed building the repair is the easy part and the consent is the step that comes first. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 calls for consent for works "in any manner which would affect its character as a building of special architectural or historic interest, unless the works are authorised". The list entry is the place to begin, and Herefordshire Council decides what counts as a like-for-like repair. We put the survey photographs and a short method note in front of the council before a tile comes off.

Old barns can shelter nesting birds and bats, and both are protected. Under section 1 of the Wildlife and Countryside Act 1981, a wild bird's nest is protected for as long as birds are in it or building it, and an offence is committed by whoever intentionally damages, destroys or takes it. Every bat species is protected, and so is each site a bat uses to breed or rest, and GOV.UK lists roof repair or replacement as work that can affect them. Natural England issues any licence needed in England. If the survey reveals a nest in use or a sign of bats, work on that stretch waits for advice before the programme continues.

The same survey looks at the junction between the barn and any later lean-to or extension, because two roof planes meeting is where a covering is most likely to be cut short. Our listed and heritage roofing page describes how we handle protected buildings, from the opening photographs to the final course.

Birds and bats in a barn roof

What happens if a nest or a roost turns up during the repair?

We pause that section. A nest under construction or in use is protected by the Wildlife and Countryside Act 1981, and bats and their roosts have protection as well, with Natural England issuing licences in England. Our photographs record what is there, and the job is re-planned around the advice.

A listed barn roof is a repair first and a consent second, and both are settled before a tile moves.

Fig. 3 The slopes, drawn close

Callout 3 of 3

St Mary's church, lead flashings and who consents

The third callout is the lead, the metal that keeps a roof's junctions dry, and it is also where we talk about the church. St Mary's carries a Grade II* listing (list entry 1157768, first listed 11 June 1959). The consent route for its roof work turns on two points: the denomination, and whether worship continues within its walls. An Anglican parish church still in use comes under faculty jurisdiction. Roman Catholic, Methodist and URC congregations are exempt while they use their buildings, and a Baptist Union church shares the exemption once a Schedule 1 trust corporation is its trustee. Quaker and Unitarian buildings are outside the exemption, as is a church that has closed or sits with the Churches Conservation Trust, and for those the application for listed building consent goes to Herefordshire Council. Whoever applies receives our survey photographs together with a method statement.

Wherever lead is used, the code matters. Royston Lead's table lists Code 3 as "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings. A flashing is the lead strip pushed into a mortar joint and lapped over the covering, and a soaker is a little bent square of lead that goes beneath every course alongside a stack. MyJobQuote says correctly installed lead flashing "can last for over 80 years". Split or raised lead is cut out and renewed, not covered with sealant. Our lead roofing page covers the detail.

Building control for a Humber address is Herefordshire Council Building Control on 01432 261938, or a registered building control approver. A scaffold that must stand in the lane needs a licence, which we arrange with our scaffolder, with the council expecting the application at least 10 days before erection. National Highways, not the council, handles any trunk road or motorway. Herefordshire has 64 conservation areas in all, so check your address against Herefordshire Council's own conservation area list, and ask the council whether an Article 4 direction applies to it. For a roof window or a dormer, our planning guide for roof windows sets out the conditions in full.

Lead at a stack or abutment

SoundLead dressed tight, laps clean, edges flat to the covering
Needs workLifted edges, splits at the folds, sealant smeared over the gap

Humber roofs: frames, listed barns and the church

What do the old framed buildings in Humber parish carry on their roofs?

In 1934 the Royal Commission's inventory called its monuments 2 to 7 in Humber parish seventeenth-century, two-storey and timber-framed, roofed in tile or slate. That sentence concerns one group of buildings, not every house in the parish. Your own roof could have been re-covered in the years after, so the survey notes what sits on the roof now, and any older covering still in place is repaired in kind when the material can be sourced.

Can the barn beside Humber Court be re-roofed without consent?

No. The Barn and Cowhouse about 15 yards north-east of Humber Court is listed Grade II, and section 7 of the 1990 Act means works that alter the building's character need consent. Herefordshire Council decides whether a given repair is like for like. We bring the photographs and a method note to that conversation, so the officer looks at the real roof before any covering is disturbed.

Does a Humber re-roof need Building Regulations approval?

Humber is in England, so the Planning Portal test governs the job, and normally no application is needed when less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected. Beyond those limits, Herefordshire Council Building Control or a registered building control approver is involved. Insulating the roof brings in Part L, and AD L 2021 Table 4.3 applies until AD L 2026 takes over on 24 March 2027.

Who signs off roof repairs on Humber's church of St Mary?

It comes down to the church's denomination, and whether worship still happens in it. An Anglican church in use works under faculty jurisdiction, Catholic, Methodist and United Reformed buildings in use are exempt, while Baptist Union property counts only if its holder appears in Schedule 1 as a trust corporation. A closed chapel or a Quaker meeting house sits outside the exemption and needs listed building consent from Herefordshire Council. The church or its architect will know which route applies, and we supply the survey.

What does a scaffold on a Humber lane involve?

Section 169 of the Highways Act 1980 requires a scaffold licence wherever scaffolding obstructs the highway. We arrange the licence with our scaffolder. Herefordshire Council's fee is £167, which licenses the scaffold for a maximum of one month; an extension is £123 per month. The council wants the application at least 10 days ahead. The single written quote already covers scaffold and says so in plain words, so nothing is added later.

What do published prices show for replacing a few tiles around Humber?

Which? reported from its November 2025 survey, excluding VAT, a range of £75 to £400 for swapping one to six tiles and £80 to £300 for fitting a new ridge tile. These are typical UK ranges and not our prices. Any Humber repair is priced once, when the survey is done, as one written total; the quote also says whether VAT and scaffold are in it.

Book a Humber survey from the ridge down

Send a photograph of the roof that concerns you with a few lines of description, and we will reply with a visit date.

10-year workmanship guarantee, in writing