Callout 1 of 3
Knowbury gable edges: verge units, bedding and fixings
The gable is the end wall of a house that runs up to the peak, and the verge is the covering that finishes its sloping top. A verge is the free edge of the slope, with no tile beyond it to hold it down, so it is the second thing our survey reads, straight after the ridge. We look along it from the ground and again from close up, for daylight under the units, for bedding that has crumbled, and for staining on the face of the gable wall below.
A verge can be finished two ways: units set in a mortar bed, or dry-fix caps and clips that hold the edge down. Marley points out that since the 2015 amendments to the tiling standard, mortar alone has not counted as an adequate fixing for a roof covering. The tiling standard, BS 5534:2014+A2:2018, and BS 8612 for dry-fix between them cover how a verge should be held down. Where we rebed a verge in mortar, a mechanical fixing goes in as well, so the fix does not rest on the bedding.
Behind the verge sits the barge board, or the exposed edge of the rafter on a house without one. We press the timber with a probe where it can be reached, because a board that has gone soft at the lower end tells us water has been running down the gable for some time. A verge can also lift because the rafter under it has twisted, which is why the survey follows the line of the edge as well as the units on it.
When one unit has gone, the repair is one unit and a fixing. When a run has loosened, it is bedded again from the nearest sound point. Photographs from before and after reach you with the report, so the finished edge can be compared with the one we found. Any waste from the old bedding is taken away, and the ground under the gable is left clear. Our pitched roofing page explains how verges, hips and ridges are finished on tiled and slated roofs, and what decides between a dry and a bedded edge.
An edge question
Why does a small verge repair deserve a proper look?
Because the edge carries the wind loading of the whole gable. One loose unit can be the first sign that the bedding has failed along the run, so we test the neighbours before calling it a single fix.
A Knowbury verge, part by part
- Verge units
- Rocking, cracked or missing, tested by hand
- Bedding
- Mortar present, sound and tight to the unit
- Fixing
- A mechanical fixing on every unit
- Barge board
- Timber firm, with no soft patches at the foot
- Gable wall
- Staining or damp below the edge
Daylight under a verge unit means the bedding has already failed.















