Callout 1 of 3
Rubble gables and the verge that sits on them
The survey starts at the gable ends, because that is where the roof stops and the wall begins. The Victoria County History's 1998 account of the parish says: "The older houses in Stoke village are mostly built of rubble." Rubble is stone laid in rough, uneven courses, so the top of such a wall has no flat line for a roof edge to sit on. Along the edge of the gable runs the verge, where the covering finishes, and it has to be bedded across that unevenness. The mortar that fills the gap takes weather from the front and from above at the same moment.
We look along each verge twice, first from the lane and then from a ladder at the gable. Verge tiles or slates rest on the wall head, the top course of masonry under the roof edge, and an undercloak, a strip of board or slate beneath the overhang, carries them past the face of the wall. Where the bedding mortar has dropped out, daylight shows under the verge and wind can get under the last course. Pointing in the stones below matters as much, because an open joint lets rain into the wall head and the wall plate, the timber beam the rafters bear on. A bargeboard, the board that finishes some gable edges, is probed for softness where it meets the wall.
Marley's technical pages state that BS 5534 is not a legal requirement, and add that the 2015 amendments ended reliance on mortar alone to hold a covering in place. BS 8612 covers dry-fix verge systems, which clip the edge tiles with screws rather than bed them. On a stone gable either method can work, so we pick by how the wall is built and by the look of the gable from the road. A bedded verge suits an old house as long as each edge tile is also fixed mechanically.
When one gable is past mending, the work stays on that gable: we strip the edge, re-bed or re-fix it, point the wall head and leave the rest of the covering alone. Our roof repairs hub covers the smaller jobs, and roof replacement explains what changes when the whole covering is spent. The report shows each gable end in photographs set against the written findings, which lets you judge the open joints yourself before agreeing to anything.
Checked along a Stoke St Milborough verge
- Bedding mortar under each verge tile
- Pointing in the stones below the verge
- Undercloak and wall plate, seen from the loft
- Edge tiles that rock or have lifted
- Fixings holding the last course at the gable
A verge needs a bed that follows the stone, not a straight line of mortar laid over it.















