01432 610152 Get a quote Call 01432 610152

Loft ventilation

Does a loft need ventilating after foam comes out?

Once foam is out, whether the loft needs ventilating depends on how the roof is built. The underlay decides how much air has to move at the eaves.

Short answer

It can, but the roof's design decides. Where a cold roof is lined with high-resistance underlay, Marley's figure is 25mm along the eaves for pitches of 15° or less, and 10mm for steeper ones. A modern air-permeable underlay can manage on a 3mm "fortuitous" gap, Marley says, provided the ceiling below has been sealed carefully and the certification terms are met. The eaves and the underlay are what we check first.

Why airflow matters again once foam goes

A foam-lined roof is built on the idea that the roof itself is sealed and insulated. Take the foam out and the roof returns to being a pitched structure over a loft, and the old rules about moving air return with it. Moist air from the rooms below drifts up into the loft, and wherever it meets a cold surface it turns to water. Airflow at the eaves is how that moisture is carried away.

Standards cover this. BS 5250, the code on moisture in buildings, is listed as current, though under review. For England, Approved Document C (2013 edition), para 6.10, points to Clause 8.4 of BS 5250:2002 and to BS EN ISO 13788:2002 for condensation. The older 2002 edition of BS 5250 is the one named there, so ask building control which edition applies to your work.

For a Welsh address, ask the council's building control team which Approved Document C and which edition of the British Standard it will assess you against, rather than assuming the English text applies.

Our answer on spray foam and condensation explains the damp that sealed roofs can hold.

What the eaves need, by type of underlay

Marley, the tile maker, sets out figures for a cold roof: the kind with insulation at ceiling level, so the loft above stays cold. They depend on the underlay, as the table shows.

Eaves ventilation by underlay type, as Marley sets it out
UnderlayRoof pitchVentilation along the eaves
High-resistance15° or less25mm
High-resistanceMore than 15°10mm
Air-permeable, ceiling well sealedAny3mm "fortuitous" gap

A high-resistance sheet does not pass vapour, hence the larger gaps. Marley adds that the 3mm figure holds only where the underlay's certification terms are met in full, so it cannot be applied to just any sheet. Pitch matters too: the 25mm and 10mm gaps swap at 15°, so a shallow-pitched roof needs a wider gap than a steep one.

These are the manufacturer's figures for a cold roof. They are not a substitute for the design of your own roof, and a warm roof, where the insulation sits at rafter level, is a different arrangement again. Establishing what is actually in your roof therefore comes before anything else, and the answer can be quite different from what the original paperwork suggests.

Finding out what is there

Foam can bury the evidence of how the roof was meant to breathe. Insulation may have been pushed into the eaves, vents may have been covered or sprayed over, and an old felt underlay may sit beneath where a modern sheet was assumed.

The survey looks at the following:

  • the eaves from outside, for soffit vents or open gaps
  • the eaves from inside, for foam or insulation blocking the gap
  • the underlay type, where a cut edge or a lifted tile shows it
  • the ceiling below, for sealing round downlights, hatches and pipes
  • the pitch, since it changes the figure

Once foam is lifted, the eaves are the first place we check for staining, because that is where airflow starts and where trapped damp shows. Our answer on new underlay after foam removal explains the choice we then offer, and a re-covering can change the answer for the eaves as well.

If a vent is needed, it is fitted so that new insulation cannot block it, with a gap kept clear above the insulation where the design requires one.

Rules and the order of decisions

Ventilation sits inside a wider set of decisions, and the order matters. The covering is checked first, then the timber, then the underlay and eaves, and only then is the insulation chosen. Each sets the next. The insulation figure for a renovated roof is 0.16 in England where it is worse than 0.35 (Approved Document L 2021 Table 4.3), and 0.16 in Wales under Table 11.1 with 0.35 as the worst acceptable result where 0.16 is not feasible. Ventilation is part of the same sequence, because a roof that is insulated well but left without airflow can hold damp in the wrong place.

Whether an application is needed for the whole job depends on the country. Under the English test published on the Planning Portal, an application is normally unnecessary while less than 25 per cent of the total building envelope and less than 50 per cent of the roof is affected. Welsh Government guidance sets a different default for Wales: re-roofing there is expected to need approval under the Building Regulations in most situations. Building control, or a registered building control approver, can also tell you how ventilation is judged.

Our answer on the insulation level after foam removal covers the figures in detail, and our spray foam removal page sets out the full sequence of work.

Related questions

Can roof vents replace the eaves gap?

They can help, but they work with the eaves rather than instead of them, and where they go depends on the design. Fitting vents without knowing the underlay type or the pitch is guesswork. We establish both at the survey, then explain what the roof needs before any vent is ordered or cut into the covering.

Who decides if the finished ventilation is acceptable?

Where an application is needed, the council's building control team or a registered building control approver makes that judgement, using the edition of the guidance that applies to your address. We photograph the eaves gap and the underlay before they are covered so that there is a picture of exactly what was fitted.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing