In brief
Not normally, for a small one. The Welsh Government treats repairs or re-covering below 25 per cent of a sloping or flat roof, measured by area, as work that does not normally need an application. Work above that area, structural alterations, or a covering with a significantly different fire performance bring approval in. Re-roofing is different: the Welsh Government expects it to need approval in most situations, so ask the council's building control service before you start.
The Welsh Government's limit for repairs and re-covering
Building Regulations are devolved, so a Welsh address follows the Welsh Government's rules. Its roof page sets the line by area. Where repairs or re-covering take in below 25 per cent of a sloping or flat roof, an application is not normally expected. A pitch roof is a sloping one, and re-covering means laying a new covering on the same structure.
The same page names three triggers that do bring approval in:
- structural alterations, meaning changes to the roof structure itself
- a new covering whose fire performance will be significantly different from the old one
- work on more than 25 per cent of the roof area, which the Welsh Government says would also mean upgrading the thermal insulation of the roof
The 25 per cent line is therefore a measure of area, and it is the Welsh Government's own measure. A ridge, a handful of tiles or a patch round a chimney sits well below it. A whole slope may not, so ask building control when the work is near the line, and have the answer in writing.
Why re-roofing is treated differently in Wales
On re-roofing, the Welsh Government's page starts from the assumption that approval is needed. Its position is that approval will be required for the work in most situations, so the starting point is approval, not exemption. It adds that roofs on existing buildings reach an age when they need replacing, and that is the moment the question arises.
Two points sit behind that. First, approval is likely where the covering changes, and the example it uses is a switch from slate to tiles. A new tile can differ greatly in weight from the old covering, which raises structural stability, and the new covering also has to meet fire safety and energy efficiency. In Welsh Approved Document A, a significant change is a rise in the loading upon the roof of more than 15%.
Second, for the energy rules a roof is a thermal element, and the Welsh Government says re-covering it should include better insulation. Welsh Approved Document L asks for 0.16 W/m²K from a renovated roof, and accepts nothing worse than 0.35 where 0.16 cannot be reached. If more than 50% of the element is renovated, the whole element is improved. Our page on re-roofing a house in Wales takes the full job through.
Planning permission and listed houses in Wales
Building Regulations are one set of rules and planning is another. The Welsh Government says you do not normally need planning permission to re-roof your house. Under the 1995 Order as it applies in Wales, class C.2(a) adds that new materials must resemble those of the existing house, so far as practicable. A change to something that looks different, such as slate to concrete tile, is a question for the council.
Some Welsh addresses carry extra limits, and a survey notes which apply:
- roof lights lose their permitted development status in a conservation area, a National Park or a National Landscape (AONB), so planning permission is needed there
- inside the Bannau Brycheiniog National Park, check with the National Park Authority before any roof work
- a listed building needs consent before works that change its special character, under sections 88 and 89 of the Historic Environment (Wales) Act 2023
For Monmouthshire addresses, the Duty Planning Officer, on 01633 644831, is the person to ring about whether you need planning permission. For Powys addresses, ask the council's planning team and have the answer in writing.
Who signs it off, and what to do next
Building control is the job of the council's own team or of a registered building control approver, and the choice is yours. The Building Safety Regulator oversees registered approvers on the Welsh Ministers' behalf, while the Welsh Ministers themselves oversee council building control. A reformed building control process for Wales came into force on 1 July 2026, so a form that worked last year may have changed.
The sensible order is simple. Have the roof surveyed, work out how much of it is affected, and send building control the figure before work begins. We photograph what we find and record the area on the survey. If the roof can sensibly be patched, the quote is for the patch. The quote is one total price.
If the leak is coming through a small patch, you may be looking at a repair of the sort covered on our slipped slate repair page, with no application at all. Everything for repairs sits under roof repairs, and addresses across the border in England follow the page on roof repair Building Regulations in England.
