In brief
The mortar bed under the verge tiles is crumbling or has cracked. The verge is the roof's finished edge at a gable end. Its tiles rest on a mortar bed, and weather and movement wear that bed away. What falls is a warning that tiles above it may be loose. Keep people clear of the spot, take pictures from the path and message them to us.
What a verge is and why mortar sits there
Where a gable wall meets the roof, the verge is the finished edge of the slope. The gable is the triangular end wall of a house. Along that edge the tiles overhang the wall and are bedded on mortar, with a strip called an undercloak beneath them. The mortar fills the gap between the tiles and the wall top, and it holds the edge tiles down.
Its position makes the verge hard-worked. Wind catches the edge of a roof first, and rain reaches the mortar from above and from the side. The bed shrinks, cracks and lets go in time, and a piece may drop to the path or flower bed below.
A dropped piece can mean more than a crumb of surface mortar. When the bed fails, the tiles above lose their support, and a loose verge tile can slide or lift in a gust. Marley reads the 2015 amendments to BS 5534 as meaning a mortar bed cannot be the lone fixing, which is why newer verges carry a fixing of metal as well as a bed. Our page on what a dry verge is explains the other way to finish this edge.
Reading what has fallen
What lies on the ground tells you something. You can look at it from the path without going near the wall, and it helps us if you photograph it where it fell, with a coin or a pen beside it to show the size.
| What you find | What it can mean |
|---|---|
| Sandy crumbs and dust | The surface of the bed is weathering |
| Lumps of mortar | The bed is cracking and releasing |
| A chip of tile | An edge tile has cracked or slipped |
| A whole tile | The edge is unsafe and needs attention |
At the survey we work along the whole verge from a ladder or scaffold, noting gaps between tile and wall, tiles that rock under a hand, and the state of the undercloak. We also look at the ridge end, where the verge meets the ridge, since the two are linked. Every point is photographed, so the findings reach you as pictures and not only as words, and the state of the edge is on record before any work begins. Our page on dry verge systems compares them with a mortar bed.
What to do now, and what the repair involves
Stop anyone standing or parking under the verge. Do not climb to pick at the mortar or push a loose tile back, since the whole edge may be unsound and a fall is the bigger danger. Photograph the debris and the edge from the ground, and note the date it fell.
A repair has two common forms. The first is to re-bed the verge tiles in fresh mortar and add mechanical fixings, so the bed no longer works alone. The second is a dry verge, where the edge tiles are held by clips or fixings in a system built for it and covered by BS 8612, the specification for dry-fix. Both finish the edge, and the choice follows the house and the roof. If a tile has already come down, leave it where it fell for the survey and do not try to refit it, since a tile put back without its bed will not hold.
If the tiles are sound, they go back. If they have cracked, they are replaced with a match. We photograph the work as it goes, so you see the new bed and the fixings before the last tiles go on. You get one written price, and scaffold is included where the verge needs it.
Price, appearance and the rules for each country
A verge is priced after the survey, because several things set the figure: the length of the verge, the height of the wall, the access, the number of tiles that need replacing and whether the repair is mortar or dry-fix. For a handful of tiles, up to six, Which? gives £75 to £400 (November 2025, excluding VAT), which suggests the scale for a few tiles but not for a whole verge. Either way the price reaches you in writing after we have looked at the edge, and nothing is left behind on your drive or path.
A dry verge can look a little different from a bedded one. The two countries treat appearance differently:
- In England, re-covering sits under Class C of the 2015 GPDO, whose conditions leave out any matching rule.
- In Wales, GPDO 1995 Class C.2(a) expects the covering to resemble the existing one wherever practicable.
Listed status or a conservation area means asking the council first, before the look of the edge changes. The pitched roofing hub covers the rest of the roof.
