In brief
Where HR underlay lies beneath the tiles, Marley asks for a 25mm opening for the whole length of the eaves at 15° or under, and 10mm at anything steeper. Under an air-permeable underlay, over a ceiling that is sealed tight, the 3mm already present in normal eaves construction may do, but only when its certification conditions are satisfied completely. We identify your underlay first, then measure what is open.
Why a cold roof needs air at the eaves
A cold roof keeps its insulation on the loft floor, laid between and over the ceiling joists. The loft above stays cold and is meant to be ventilated. Warm, damp air from the rooms below leaks up into the loft through gaps round pipes, light fittings and the hatch. If that moist air has nowhere to go, it reaches the chilled underside of the rafters and underlay, and condenses there as water.
The eaves are where the slope drops to the wall and gutter, and they are where fresh air should come in. It enters through the gap beneath the lowest tiles or through vents. It then crosses the loft and leaves higher up, at the ridge or through vents near the top. A gap only at the top, with nothing at the bottom, does little.
The ventilation guidance traces back to BS 5250, the British Standard on controlling condensation in buildings. In England, Approved Document C cites the 2002 edition, while BSI lists the standard as current and under review. Our guide to underlay and ventilation on a pitched roof shows how the pieces fit.
Marley's figures for each underlay
The opening Marley asks for depends on the type of underlay laid beneath the tiles and, for the first two rows below, on the pitch. The second HR row asks for less than the first, and the table keeps the two cases apart.
| Underlay and roof | Opening at the eaves |
|---|---|
| HR underlay, pitch 15° or less | 25mm along the eaves |
| HR underlay, pitch over 15° | 10mm along the eaves |
| Air-permeable underlay, well-sealed ceiling | 3mm of normal eaves construction |
The third row has a condition attached. Marley says the 3mm, which is the air that seeps in through the usual gaps in eaves construction, is enough provided the certification conditions are satisfied completely. That is not a figure to assume for any roof, and a loft under a ceiling full of gaps would be a poor candidate.
HR means high resistance. Vapour cannot pass through HR underlay, so the loft can only shed moisture by moving air, and that is why its figures are the larger ones. Our page on the difference between HR and breathable underlay goes into the detail.
What closes the gap in an older loft
On paper the opening is a number. In a real loft it is easy to lose. Insulation gets pushed along the joists until it meets the wall plate and shuts the gap. Boarding laid over the joists, stored boxes and an old bird guard can do the same. A damp loft can turn out to be a blocked eaves and not a faulty roof.
On a survey we look from the hatch and, where it is safe, along the eaves from outside. We check and photograph:
- the insulation at the eaves, and whether it overlaps the gap
- the underside of the underlay, for damp patches or dark staining
- any eaves vent or tray, and whether it is clear
- the seal on the loft hatch, since a leaky hatch feeds warm air upwards
Re-covering is also a chance to improve the insulation, and England and Wales name different tables. In England, AD L 2021 Table 4.3 sets a 0.35 threshold and an improved roof value of 0.16. In Wales, gov.wales states that re-covering should also improve the roof's insulation, and Welsh AD L Table 11.1 gives 0.16 as well, no worse than 0.35 where that cannot be reached. Whatever goes in must leave the opening clear.
Putting the eaves right and what comes next
Opening a blocked eaves can be a small job. The insulation is drawn back, and a plastic eaves tray or a vent is fitted to hold it clear of the gap. Sometimes the underlay is the cause. An old felt may need to give way to one that suits the ventilation the house has, and that is a bigger repair, covered in our page on batten and felt renewal.
New editions of the Approved Documents are on the way. AD L 2026 takes effect in England on 24 March 2027, and Wales has its own new AD L from 4 March 2027. The eaves figures above come from Marley and BS 5250, so they do not depend on those dates.
We do not price a ventilation fix over the phone. Our written total comes after the survey as a single price, with scaffold inside it where the job needs one. Photographs of the eaves before and after show the gap we found and the gap we left. The pitched roofing hub lists the other repairs to a tiled roof.
