Leadwork repairs

Repairing old leadwork: splits, lifts and patches

Old lead can be repaired instead of replaced, but only when the fault and the sheet around it are sound. This guide sets out how splits, lifts and patches are judged.

Horizon Roofing Hereford 9 min read

Lead is a long-lived metal, so the lead on an older house may have been laid well before its present owner arrived. It sits in flashings round chimneys and walls, in valleys, in the lining of a bay roof and in the cheeks of a dormer. When it fails, it fails in a handful of recognisable ways: it splits, it lifts away from the wall, or it has been patched so many times that the patches are now the problem.

The decision in front of an owner is whether to mend what is there or to replace it. Neither answer is right for every roof. A single split in sound sheet lying on dry boards is a different job from a sheet that has cracked along three folds, and a flashing that has lifted because its pointing fell out is different again from one that has lifted because the lead has crept down the wall.

The sections below take the three faults in turn, then look at when a patch is the right call, what third-party sources say about cost and lifespan, and how England and Wales treat repairs that reach the covering or a listed building. Our lead roofing service sets out how we survey and report on old lead.

Reading old lead before anything is touched

A survey of old leadwork starts with looking, and only then with touching. Old lead carries a dull grey surface, a patina that forms as the metal weathers. That surface is a sign of age and not of failure, and scraping it back to shiny metal does nothing for the roof. What matters is the shape and the thickness of the sheet and the state of the joints.

Thickness gives the code. Royston Lead's table pairs each code with a thickness, from Code 3 at 1.32mm up to Code 8 at 3.55mm, so a measurement at a cut edge tells us which code was laid. That helps us decide whether new lead should match the old or step up. Royston's own note on Code 3, "Recommended for lead soakers only", is worth remembering if old Code 3 is found where a flashing should be.

The shape tells us how the sheet has moved. Lead is soft, and a sheet that is fixed too tightly or cut too large will creep. It slumps down a wall, wrinkles at the foot, and cracks along the folds where it has been flexed time after time.

Our checks on a first visit:

  • the grain of the surface: crazed or cracked areas point to fatigue
  • the folds, laps and welts, where movement concentrates
  • the upper edge of every flashing, and the pointing around it
  • earlier repairs: mastic, bitumen tape, solder, or patches of a different grey
  • the timber or masonry beneath, for stains and soft patches

Each finding goes into a photograph so you see the lead as we see it.

Splits: why lead cracks and how a split is closed

A split is a crack through the sheet, for example along a fold or beside a fixing. It opens because the sheet swells and shrinks with the temperature, and each cycle works the metal a little. Over years, a fold that has flexed many thousands of times hardens and cracks. Larger sheets move further, so the splits show up in large flashings and long gutters.

There are two ways to close a split:

  • a lead patch, cut to the size of the damage, dressed over it and sealed at the edges
  • lead welding, in which the metal is melted back together along the crack

The choice turns on where the split lies and how much sound lead surrounds it. A patch over a split in a fold only works when the neighbouring sheet is firm.

The test that matters is what the split tells us about the whole sheet. One split in a sheet that is otherwise supple suggests an isolated stress point. Several splits across the same sheet say that its movement was never allowed for, and patching each one will not stop the next.

Soft solder and mastic are not substitutes for those methods. Our guide on whether mastic is a fix for lifted lead explains why a bead on the surface can hide the fault and let the damp keep working underneath.

Where a split has been wetting timber, we deal with the timber first. A good patch over a damp board is a patch that has to be done twice.

Lifts: when the lead comes away from the wall

A lifted flashing is lead that has come away from its fixing, or that has slumped out of its groove. At a chimney or an abutment, the top edge of the lead is tucked into the wall, wedged and pointed. When that pointing breaks up or drops out, the wedges loosen, the lead drops, and the wall can send water behind it.

The reasons for a lift, in the order we check them:

  1. The pointing has failed and the lead is no longer held in its groove.
  2. The wedges have worked loose, and the lead has slid down.
  3. The sheet is too long for its fixings and has crept under its own weight.
  4. The wall itself has moved, so the groove no longer lines up with the flashing.

If the first two apply, the repair is small: re-wedge the lead, repoint the groove with a mortar that suits the wall and dress the lead back into place. If the third applies, the sheet is likely to lift again, and renewal in shorter lengths is the more lasting route. If the fourth applies, the wall needs attention first.

A tempting surface fix on a lifted flashing is a bead of sealant along the top edge. That masks the symptom for a spell, yet the grip in the groove stays lost. Our guide on why a lead flashing lifts goes through the causes in more detail.

On an old lime-mortared wall, the repointing mortar is chosen to suit the wall, and the quote says which one is used.

Patches: the right answer, and when not

A patch is a repair, not a failure. It is the correct answer when the sheet around the damage is sound, the fold is not the cause and the boards or masonry beneath are dry. It is the wrong answer when the surrounding lead is fatigued, when earlier patches are already failing or when the fault is a movement problem that a patch will not cure.

How we judge each fault: repair or renewal
FaultRepair fits whenRenewal fits when
Single splitThe sheet around it is supple and the support is dryMore splits sit along the same fold
Lifted edgePointing or wedges failed; lead is soundThe sheet has crept under its own weight
Old patchesThey are sound and sit on firm leadThey overlay each other or are lifting
Rotten supportNever as a patch aloneThe boards or masonry need replacing first

That table is a summary and not a rule. Lead differs from roof to roof, and what we recommend comes from what the survey shows. Where mending is enough, that is the quote you get, with the reason written beside it. Where renewal is the answer, the photographs explain why.

Where lead is replaced rather than patched, new lead goes in at the code that suits the use. Royston lists Codes 4, 5 and 6 for flashings, Codes 3 and 4 for soakers, and a wider span for valleys and gutters. Lead is governed by BS 6915:2001 in England's Approved Document C, not by BS 6229, which concerns membranes.

What third parties say about cost and lifespan

These are third-party ranges, each from its named source and date, offered for scale only. What we send you after the survey is a single written total.

  • MyJobQuote, on a page last updated 22 September 2026, says "A chimney lead flashing patch repair typically costs around £200, while a full replacement averages around £570." It also gives full leadwork "between £350 and £920, depending largely on whether scaffolding is required".
  • Checkatrade, on a repairs page dated June 2026 with costs ex VAT, gives "Lead flashing repairs: £50-£70 per metre". That is a per-metre rate, and it is not a total for any roof.

The MyJobQuote figures concern chimney flashings and carry no VAT basis. The per-metre rate is ex VAT. The two are different units from different sources, so they are not added together or compared.

On lifespan, MyJobQuote writes that lead flashing which is correctly installed "can last for over 80 years". That is a hedge about a well-laid flashing and not a floor. HomeBuilding gives a lead flat roof "60-100 years", and Less gives "50 to 100 years". Those two figures are for lead flat roofs, so they are not read across to flashings.

What moves a repair price is the length of lead involved, the code, the access and the work needed beneath the lead. Scaffold, where a job needs it, sits inside our single written total and does not arrive as a second figure.

When repairs meet the building rules: England and Wales

Mending a flashing is a repair. The rules start to matter when the repair spreads into the covering around it, or when the building is protected.

  • England: for re-roofing, the Planning Portal sets its tests at "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof", below which no application is normally needed. A repair to a flashing is small against those limits, but a re-cover is measured against them.
  • Wales: the Welsh Government says that "If you want to carry out repairs on or re-cover less than 25 per cent of the area of a pitch or flat roof, you will not normally need to submit a building regulations application." The same page expects insulation to be improved if more than that is replaced or repaired.

A listed building brings a separate consent, under s7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 for England and under s88 and s89 of the Historic Environment (Wales) Act 2023 for Wales. Repairing historic lead may touch the building's character, so a call to the council before the work starts costs little. Our guide to lead on listed and period roofs covers that ground.

A conservation area may carry an Article 4 direction, so ask your council whether one applies at your address before assuming that no permission is needed.

If you are unsure where your house falls, raise it at the survey. We put the question to whichever building control body covers your address, the council's team or a registered building control approver, and report the answer.

Old leadwork: your questions

Is the grey colour on old lead a sign that it has worn out?

No. Lead weathers to a dull grey as its surface changes, and that patina is a normal sign of age. What shows wear is cracking at the folds, thin or crazed areas, slumped sheets and lifted edges. We judge the sheet by its shape, its thickness and its joints, not by its colour.

Can I patch a lead split myself with tape or sealant?

A tape or a bead may hold for a short spell, but it covers the split without closing it, and damp can carry on working beneath. A patch also takes a ladder and a roof edge. If water is coming in, a photograph of the split from the ground is a better first step than a climb.

How do I know whether my lead needs repair or full renewal?

Look at the pattern. One split in supple lead on dry support is a repair. Splits along one fold, creep down a wall or patches lifting over each other point to renewal. The survey photographs the lead and the boards beneath, and you see both before a written total is agreed.