01432 610152 Get a quote Call 01432 610152

Dormer leadwork

Leadwork on dormers: cheeks, aprons and tops

A dormer is a small building on the roof slope, and lead wraps most of it. This guide walks round the top, the cheeks, the apron and the back gutter, and what each one needs.

Horizon Roofing Hereford 9 min read

A dormer pushes a vertical window out through a sloping roof. To do that, the roof is built up in a small box with a face at the front, two sides and a roof of its own, and every edge of that box meets the main roof at an angle. Each of those meetings is a place where water can enter, and lead is the usual material for closing them.

Roofers name the parts of a dormer from the ground up. The face is the front wall with the window in it. The cheeks are the two side walls. The apron is the strip of lead across the bottom of the face, over the main roof covering. The top is the small roof over the box, and the back gutter is the channel that takes water around the upper edge of the dormer, at its junction with the main slope.

The sections below take those parts in turn, starting with the cheeks, then the apron and back gutter, then the top. A section on lead codes follows, and the last section covers the planning and listed building rules that apply when a dormer is altered, with the England and Wales position for each. For every other kind of metalwork on a roof, see lead roofing.

Cheeks: lead standing against the sides of the box

The cheek is the side wall of the dormer. Where it is built of timber framing, the usual finish is sheet lead dressed over boards. Where the cheek is masonry, the lead acts as a flashing at its foot, running along the line where the wall meets the main roof slope.

That line is a diagonal, because the main roof falls away from the dormer while the dormer's wall rises straight up. Lead on a diagonal is cut and folded in steps that follow the courses of tiles or slates. On a tiled roof, a small bent soaker goes under each course and a stepped strip covers the soakers on the cheek. For slate, the lead is lapped to suit the slate's own overlap.

A vertical sheet of lead on a timber cheek is pulled down by its own weight. Left unsupported across a wide cheek, it can slump over the seasons and open a gap at the top. Roofers get round that by keeping the pieces of lead small and by fixing them with lead clips that let the metal move without pulling away from the boards.

On a survey, we check:

  • whether the lead has slumped or split along its upper edge
  • whether the stepped flashing along the diagonal has lifted from the wall
  • the timber behind the lead, which can rot if water has been getting in
  • the junction at the back corner, where cheek and top meet

You see photographs of each, so the decision on whether to patch or renew is made on the dormer itself.

A cheek that has been repaired before tells its own story. Layers of mastic along the diagonal, or lead soldered over a crack, show that the fold has been moving. We then explain whether a second patch would add anything or whether the cheek should be renewed from the step flashing upwards.

The apron and the back gutter

At the foot of the face, the dormer meets the lower slope. The roof covering runs up to the dormer and stops, and the join is closed by an apron: a wide piece of lead hanging down over the covering below, with its top turned up and tucked under the window cill or the dormer's cladding.

An apron has to lie over the covering, never under it, so that water coming down the face of the dormer runs onto the lead and then out over the tiles or slates. The length of the apron follows the width of the dormer, plus a margin at each end where it turns up into the cheeks.

Behind the dormer, the main roof slope runs uphill into the dormer's rear. Water coming down that slope meets the back of the dormer and needs a way round it. Behind the dormer sits the back gutter, a trough of lead let into the slope and laid to fall each way, so the water is carried out past the cheeks and down the roof. Our guide to the back gutter behind a chimney sets out the same idea in detail for a stack, and the principle carries across to a dormer.

Where each dormer lead sits and what we check there
PartWhere it sitsWhat we check
ApronAcross the foot of the faceLifted edges, cracks at the ends
Cheek flashingAlong each side against the slopeGaps at the steps, loose soakers
Back gutterBehind the dormer, across the slopeDebris, a fall that has reversed
TopOver the boxSplits at joints, standing water

The top: a small roof with its own falls

The top of a dormer is a roof in miniature. It may be pitched, covered in the same tiles or slates as the main roof, or it may be nearly flat and covered in sheet lead. A flat top gives headroom inside the dormer without the height of a ridge, and it is the version that depends most on lead.

A flat lead top needs a fall, a slope just steep enough to carry water to one edge. It has no gutter of its own, so the water leaves over an edge and into the roof or into a short drip trim. A lead top is built in bays, each bay a length of sheet laid between rolls (raised timber strips with lead dressed over them) or at drips, in the same way that a lead valley is built from lengths.

NFRC says BS 6229:2025 sets "a minimum 1:80 finished fall", but that standard covers membranes and not lead, so the fall figure is a membrane figure. AD C cites BS 6915:2001 for lead. The fall for a lead dormer top is therefore a design decision for the person laying it. A quote for a new top should state:

  • the lead code chosen for the sheet
  • the fall being built into the boards
  • how the bays are divided
  • how the edges are finished

When the top is renewed, the edge detail needs the same care as the sides. The lead turns down over a drip or over the fascia board at the front, and turns up at the back against the main roof. A fault at either end gives water a way into the box, and the first sign may be a stain on the dormer's inside ceiling.

Our guide to lead on bays and small flat roofs covers a lead-covered roof of this size in more detail.

Royston lead codes for dormer work

Royston Lead's cast lead brochure gives dormers a group of their own, and the group lists a wide span of codes. The table below shows the dormer line next to the groups for the other pieces of leadwork on the same dormer, so you can see which codes overlap.

Codes listed for dormer work and its neighbours, from the Royston table
UseCodes listed
Soakers along the cheeks3 and 4
Flashings4, 5 and 6
Dormers4, 5, 6, 7 and 8
Back gutter, as a pitched valley gutter4, 5, 6, 7 and 8

A wide list does not mean any code will do. Code 4 is 1.80mm thick and weighs 20.41 kg per m²; Code 8 is 3.55mm and weighs 40.26 kg per m². A cheek, an apron and a top place different demands on the sheet. The apron lies on the covering and has to be bent over tile edges, while the top may lie flat on boards and take footfall when someone climbs the roof to the window.

Weight matters on a dormer in a way it does not on a chimney. The cheeks and top add load to rafters sized for the main roof, so a heavy code raises the question of what the framing can carry.

MyJobQuote says correctly installed lead flashing "can last for over 80 years". HomeBuilding gives a lead flat roof "60-100 years", a figure for flat roofing and not for the cheeks and aprons of a dormer. Neither source promises a result on yours.

Planning and listed building rules for dormer work

Renewing the lead on a dormer that is already standing is a repair. Building a dormer, enlarging one or changing its shape is a different matter, and the planning rules are set separately for England and for Wales.

  • In England, permitted development for a dormer under Class B is removed on article 2(3) land, which means conservation areas, National Landscapes, National Parks and World Heritage Sites.
  • In Wales, the equivalent land is article 1(5) land, and Welsh Class B.1(g) removes permitted development dormers there too. That includes the Bannau Brycheiniog National Park and the Welsh part of the Wye Valley National Landscape.
  • In England, flats have no householder permitted development rights under article 2 of the 2015 Order.

A listed house keeps its Class B and Class C rights on paper, but its owner needs listed building consent on top. For a listed building in England, the consent rule is s7 of the Planning (Listed Buildings and Conservation Areas) Act 1990. For one in Wales, it is s88 and s89 of the Historic Environment (Wales) Act 2023, in force since 4 November 2024. Lead on a listed dormer is judged as part of the building's character, so the covering, the code and the finish are items to agree with the council before work starts.

Article 4 directions can withdraw permitted development rights on a defined area. For any dormer question, check whether an Article 4 direction applies with the council for your address. The full wording of the roof window and dormer conditions sits in our planning guide, roof window planning in England and Wales, so this page does not restate it.

The written total we give for dormer leadwork covers the lead and the scaffold it needs. Where consent could apply, we raise it at the survey.

Dormer leadwork: your questions

Why does a dormer leak at the corner where the cheek meets the top?

That corner is where three pieces of lead and the roof timbers meet, and it is the hardest point to fold neatly. A small gap or a split fold there lets water into the box. We lift the nearest lead, photograph the timber behind it and show you whether the fault is the fold or the framing.

Can the lead on a dormer be renewed without removing the window?

The window can stay in place while the lead is renewed. The apron tucks under the cill and the cheeks run up beside the frame, so the lead is lifted and replaced around it. If the frame itself has rotted, that is a joinery repair, and the survey shows it before any price is written.

Does repairing the lead on an old dormer need planning permission?

Renewing lead on a dormer already standing is a repair. Building or enlarging a dormer is where the planning question arises, on either side of the border. A listed house also needs consent before alterations that touch its character, and a conservation area is a reason to ask the council about your address first.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing