In brief
HomeBuilding's lifespan table gives a lead flat roof 60 to 100 years, and the cost guide Less gives 50 to 100 years. These are rough guides and not promises, and the two overlap across most of their length. Where one roof sits inside the range depends on its deck, its falls and its detailing, which is why the lead is photographed and looked at before anything is said about what it needs.
The two published ranges for lead
The published lifespans for lead vary by source, so both are given here. HomeBuilding's table of roof coverings, last updated 30 September 2025, gives a lead flat roof 60 to 100 years. Less, a cost guide updated on 27 October 2026, gives 50 to 100 years.
Both are ranges. A range runs from what an ordinary roof achieves to what a well-laid, well-kept one can reach, and neither source presents its figure as a date on which a roof will fail. The lower end is not a warning and the upper end is not a target. HomeBuilding labels its column as an approximate lifespan, and that word is worth keeping in mind.
Lead flat roofs sit outside BS 6229, which covers membranes only, so lifespan figures for membrane coverings do not carry across. The same caution runs the other way. These lead figures are for a covering laid across a deck, and they are not the figure for a flashing, where a different source and a different wording apply. Our page on how long lead flashing lasts deals with those, and reading one figure into the other would be a mistake.
Lead against EPDM, GRP and felt
The same two sources give figures for the other flat roof coverings, which puts the lead range in context. Where the sources disagree, both are shown.
| Covering | HomeBuilding | Less |
|---|---|---|
| Lead | 60 to 100 years | 50 to 100 years |
| EPDM | 25 to 30 years | 30 to 50 years |
| GRP | 25 to 30 years | 25 to 40 years |
| Felt | 10 to 15 years | 10 to 20 years |
EPDM is a synthetic rubber sheet, GRP is glass-reinforced plastic (fibreglass) and torch-on felt is bitumen felt melted onto the roof with a gas torch. Lead sits well above each of them in both tables. A longer life is not a reason to choose lead by itself, because the right covering depends on the shape of the roof, what it is used for and what it costs. A small bay roof, a porch and a large extension roof can each come out differently, and the choice is made for the roof in question, and the reasons go alongside the quote. Our page on lead on bays and small flat roofs covers where lead suits best.
What moves a roof within the range
What follows is general advice drawn from the roof itself. The sheet cannot do better than the deck beneath it and the detail round its edges, and each of these is looked at on a survey:
- the deck: boards that stay dry, flat and sound under the lead
- the falls: whether water leaves the roof or lies on it
- the edges and upstands, where the lead turns up a wall and is pointed in
- the outlets and rainwater goods
- foot traffic, if the roof is used as a way to reach a window or a chimney
The survey photographs what it finds. Where the lead is sound and a single joint or upstand has failed, a repair is the better buy. Where the deck itself has failed, the lead comes up and the boarding is renewed before new sheet goes down. Older lead is judged as the individual sheet it is, not by its age alone, because a hundred-year range tells you what the metal can do and nothing about the boards beneath it. If the survey finds the boards sound and the falls good, the remaining life is judged from the lead itself: its thickness at the edges, any splits at folds, and how well each upstand is pointed in.
Re-laying a flat roof in lead: the border rules
Laying a new covering is re-roofing, and the approval test differs between England and Wales.
- England: the Planning Portal asks about two shares, the building envelope (under 25 per cent) and the roof itself (under 50 per cent), and normally wants no application when both are met.
- Wales: the Welsh Government says re-roofing needs Building Regulations approval in most situations, while its roof page sets the line for repairs and re-covering at 25 per cent of a flat roof's area.
A flat roof over a bay or an extension can be a modest share of a house, but the rules count the whole roof, so the council, or a registered approver, is asked before the work begins, and the reply is kept with the survey photographs for your records. The same question is asked of a flat roof over a porch or a bay. Lead is also heavy, at 25.40 kg per square metre for Code 5 in Royston's table, so the deck is checked for the load. The lead roofing hub lists every lead page, including how heavy roofing lead is.
