01432 610152 Get a quote Call 01432 610152

Leadwork in wet weather

Can leadwork be done in the rain?

Lead is shaped and fixed by hand on dry surfaces, so permanent leadwork waits for the rain to stop. A running leak can be made safe meanwhile.

In brief

Not properly. Sheet lead has to be shaped and fixed against dry timber and dry brickwork, and wet lead on a wet pitch is slippery to carry and hard to hold. So the permanent job waits for a dry spell. If water is coming in now, we can cover the spot temporarily, photograph the damage and fit the lead once the roof has dried out.

Why lead and rain do not mix

Lead goes on in stages, and every stage wants dry surfaces. The sheet is measured against the detail and cut. It is then dressed down with a hand tool, and bossed, which means beaten into a corner or around a bend. Where the lead meets a chimney or a wall, its upper edge goes into a narrow slot raked out of the brickwork, called a chase, and small lead wedges hold it there while the joint is pointed.

Timber that is wet when the lead goes over it has nowhere to dry out afterwards, because the sheet seals it in. Mortar that is wet will not take a pointing mix cleanly, and the pointing is what keeps a chased-in edge against the wall. Sheet lead is also slippery to handle in the wet, and a pitched roof beside a stack is a poor place to lose your footing.

Wind makes it worse. A big sheet catches the air like a sail, and Code 5 weighs 25.40 kg per square metre in the Royston Lead table, so a loose piece is a danger to the person carrying it and to anyone standing below. That is why a rain delay is a safety decision as much as a quality one.

What we can do while it is still raining

Rain stops the permanent repair. It does not stop us looking, photographing or protecting the room underneath. When a leak shows at a chimney, a valley or a wall junction during wet weather, a visit can cover:

  • a look at the flashing and the stack from the garden and from a ladder, with photographs
  • a temporary cover over the leaking detail, to stop the room below taking more water
  • a note of what the permanent repair needs, ready for the survey once the roof is dry

A temporary cover is make-safe work and not the repair. It keeps water out until the lead can be refixed or replaced, and it should be checked after the next heavy shower, because wind can lift it.

For a sense of what others publish, MyJobQuote (22/10/26) gives £150 to £300 as the typical range for an emergency roofer call-out, and £1,200 or more for extensive storm damage repairs. Those are its UK figures for emergency work, not our prices, and the written price for the permanent job follows the survey.

Fitting the permanent lead once the roof is dry

When the timber and brickwork have dried, the survey turns into the repair. We photograph the lifted, split or missing lead, test the wedges and the pointing around it, and set out what needs replacing. A dry day is worth waiting for, because the timber and the pointing both need to be dry for the fixing to hold.

The sheet for the permanent job comes from the Royston Lead table of codes. Flashings are cut from Code 4, 5 or 6. Soakers, the small folded pieces that sit under tiles or slates along a joint, come from Code 3 or Code 4, and Royston marks Code 3 as "Recommended for lead soakers only". Our page on which lead code suits flashings goes through the choice. The survey notes list the code for every piece, so the person who orders the lead and the person who fits it are working from the same page, and a missed measurement does not turn into a second wet day on the roof.

If the leak came from old lead that has simply worn out, repairing old leadwork sets out which sections are saved and which are replaced. Everything lead-related is gathered under lead roofing.

A larger re-lead: where the border changes the rules

A wet spell can stretch a bigger job, such as re-leading a flat roof or a long run of flashing. Where lead covers a large share of a roof, the approval rules come into play, and they are not identical in England and in Wales.

  • England: the Planning Portal's test is met when under 25 per cent of the building envelope and under 50 per cent of the roof is affected, and no application is then normally needed.
  • Wales: in the Welsh Government's words, re-roofing "will need Building Regulations approval" in most situations, and its roof page draws the line for repairs or re-covering at 25 per cent, counted on the pitch or flat roof concerned.

One chimney flashing sits well inside both limits, but the rules still weigh up the roof as a whole. Before a larger job starts we put the question to the council's building control team, or to a registered approver, whichever you prefer to use. Their answer decides whether an application is needed, and you are given it in writing, with the photographs that went with the question.

Related questions

There is a leak at my chimney while it is raining. What should I do?

Catch the drips, move belongings and photograph the damp patch. Speak to your insurer before any lasting lead repair goes in, and keep photographs and receipts for any make-safe work. The Financial Ombudsman Service treats rain, hail or snowfall by itself as something that can amount to a storm. Then ring us, so the stack can be surveyed once it is safe.

Is a temporary cover a repair?

No. A temporary cover keeps water out of the room until the roof is dry enough for the lead to be refixed or replaced. It is not meant to stay in place. We photograph the cover and the flashing beneath it, so you can see what the permanent job has to put right.

Get your free roof quote

Tell us about the roof and we will arrange a survey.

10-year workmanship guarantee, in writing