MyJobQuote (page dated 03/11/26) says the average price for removing the entire chimney stack with the breast is around £3,000 to £3,500. For the breast alone it gives around £2,500, within £1,200 to £3,500. They come from a UK price-comparison site, so they are neither Hereford prices nor ours. What you are quoted here is a total in writing, set once the stack, the loft and the roof around the stack have been looked over.
What the published figure for a whole stack covers
A chimney stack is the part that stands above the roof, from the ridge or slope up to the pots. Taking one away means dismantling it by hand, a course at a time from the top, then dealing with what is left at roof level: the flue, the opening in the roof and the lead that used to seal the stack to the slope. A tall stack on an old house can hold a surprising weight of brick or stone, and every course has to be lowered to the ground in a controlled way, never dropped down the flue or onto the slope. The breast-only figure leaves all of that out, so the two rows describe different jobs and are best read apart.
| Job | Figure given |
|---|---|
| Breast only | Around £2,500 on average, within £1,200 to £3,500 |
| Whole stack with the breast | Around £3,000 to £3,500 |
What a stack costs to remove without its breast depends on its height, its material and what the roof needs afterwards, which is why a visit to the loft comes before any number. Our page on what removing a chimney breast costs covers the inside half in the same way.
The roof that is left when a stack comes down
When a stack goes, the roof has a hole in it. The rafters either side of the opening are framed round it, and those timbers, the battens and the underlay have to be made good before any covering goes back. The lead flashings that kept the stack watertight no longer have a job, so they are taken out and the slope is closed.
That final covering is where the borders part. In England, Class C has no condition about matching the old roof, so the choice of slate or tile for the patch is yours. In Wales, Class C.2(a) of the 1995 Order requires that the materials "so far as practicable match" the appearance of the existing, so a Welsh house needs the patch to blend with its neighbours.
Whichever side of the line you live on, the covering for the patch is chosen to suit the roof around it. New slates or tiles sit paler than weathered ones for a while, and on a front slope that is worth knowing about beforehand.
Our page on the roof after a stack comes down goes through the closing-up in order.
Planning and consent for a stack on both sides
Class C is the class that covers most alterations to a roof, but chimneys are carved out of it in both Orders:
| Side | What the Order says |
|---|---|
| England | 2015 Order, C.1(d): not permitted if the work would include the "installation, alteration or replacement of a chimney, flue or soil and vent pipe" |
| Wales | 1995 Order, C.1(c)(i): excludes "the installation, alteration or replacement of a chimney"; C.1(c)(vii): excludes "the removal of a chimney from a dwellinghouse on article 1(5) land or within a World Heritage Site" |
Article 1(5) land in Wales means a National Park, an area of outstanding natural beauty (now National Landscape) or a conservation area. In Wales, a stack coming down from a house in any of those places is therefore outside Class C by name.
Neither Order settles whether your own stack needs an application, so the answer comes from the council, or from the National Park Authority inside Bannau Brycheiniog. A listed house also needs listed building consent: under LBCA 1990 section 7 in England, and under sections 88 and 89 of the Historic Environment (Wales) Act 2023 in Wales.
What to settle before the first course comes off
A stack may not be just ours to take down, so a few questions need answers first:
- whether any fire or stove below still uses a flue in that stack, since removing the top changes how the flue behaves
- whether the stack is shared with next door, which brings in the Party Wall etc. Act 1996 in England and in Wales
- whether birds are using a nest in a pot, because section 1 of the Wildlife and Countryside Act 1981 concerns anyone who acts intentionally against a nest that is occupied or part-built, and the work then waits
- whether scaffolding that stands on public ground needs a scaffold licence (Highways Act 1980 section 169), which we arrange with our scaffolder
On the first, a flue left open at the roof is a way in for rain and birds, so any flue that stays below is capped and vented in the same visit.
The quote should say what it includes on VAT and scaffold, and ask for the Building Regulations position in writing too. Our chimney repairs hub explains how those surveys run.