Lead codes

Lead codes on a Herefordshire roof: which lead goes where

Lead sheet is sold by code, and each code suits some jobs and not others. This guide reads Royston's table for codes 3 to 8 against the parts of a Herefordshire roof.

Horizon Roofing Hereford 9 min read

Lead on a roof is a thin sheet of metal, but not all lead sheet is the same thickness. It is sold by code, from 3 up to 8, and the code tells you how thick and how heavy the sheet is. A higher code means a thicker, heavier sheet, and the jobs each code is meant for change as the numbers climb.

The table behind this guide is the cast lead brochure from Royston Lead. Royston gives each code a thickness in millimetres, a weight in kilograms per square metre, a colour, and a set of letters for where the code is used. We have turned the letters into words, and kept Royston's own caution that Code 3 is "Recommended for lead soakers only".

Herefordshire roofs give lead plenty of work. Chimney stacks, valleys between slopes, the junction where an extension meets the house wall and the small flat roofs over bays all rely on it. The guide reads the table first, then follows the jobs in the order a survey meets them, then turns to the standard that applies, and ends on how long lead lasts and what changes on a listed house. Any rule that changes at the border is tagged with its country. Our lead roofing service covers the work itself.

Reading the Royston table

Each code is a different gauge of sheet. Royston lists them like this:

Lead sheet codes 3 to 8, from the Royston Lead cast lead brochure
CodeThickness in mmWeight in kg per m²Colour
31.3214.97Green
41.8020.41Blue
52.2425.40Red
62.6530.05Black
73.1535.72White
83.5540.26Orange

Two features of the table are worth noticing before any job is matched to a code. The steps between codes are small: Code 4 to Code 5 adds 0.44mm of thickness, and Code 7 to Code 8 adds 0.40mm. And the weights climb steadily, so a lining of Code 8 weighs more than two and a half times what the same area of Code 3 does. Lead is heavy, and a roof structure carries every kilogram of it.

Royston gives the colour as a marker for each code, which is useful when two rolls are lying side by side in a van or on a scaffold, and a wrong roll is easy to pick up. A gauge that reads in millimetres will tell you the code against the second column of the table.

When a quote names a code, three checks are worth making:

  1. Is a code named for each use, or only one code for the whole job?
  2. Does the code match the use column in the table above?
  3. Is the lead new sheet, or reused from the old roof?

Soakers: codes 3 and 4

A soaker is a bent lead tab, shaped like an L, laid beneath the covering at the point a slope meets a wall or stack, with one for every row of tiles or slates. It turns water back onto the covering and keeps it out of the join. The soakers lie beneath the covering, so they go in as the roof is laid, or as a section of it is lifted.

In Royston's table, the soaker use is the one that takes the lightest sheet. Code 3 is "Recommended for lead soakers only", and Code 4 is also listed for soakers. SPAB describes the region's Welsh slate and stone roofs as "predominantly double-lapped", meaning each course overlaps the one below, and soakers are worked into that overlap. On a Herefordshire house with tiles or slates against a gable or a stack, soakers are the first detail a survey asks about, because they cannot be seen without lifting the covering beside them.

A few questions are worth putting to whoever replaces them:

  • Which code is going in, and does it match the soaker use in the table?
  • Is there one soaker per course, cut to the size of its course?
  • Will the covering beside the wall be lifted so the old soakers can be checked?
  • What is the plan for the flashing that sits on top of them?

Soakers cannot be judged from the ground, so a survey photographs them from a lifted course and shows you the lead as found.

Flashings and the chimney: codes 4, 5 and 6

A flashing closes the gap between a roof and whatever rises out of it, such as a stack or a wall. On a stack of stone or brick, the flashing is cut into the mortar joints and dressed down onto the roof. Where a Herefordshire black-and-white house has a big outside stack, the county's stone atlas calls it "commonly of local sandstone", so some flashings here are chased into stone and not brick.

Royston's flashing group takes Codes 4, 5 and 6. Within that range, which code goes in is a judgement made on the roof itself and not from a table in an office, about the stack and the length of the run, and we say which we would fit and why. Code 3 is not in the flashing group.

The back gutter behind a chimney is a different use. It is the trough of lead that carries water around the stack, and Royston lists that kind of work under pitched valley gutters. Our guide to the back gutter behind a chimney explains how the pieces fit together.

Should a brown stain show on a ceiling beside a chimney breast, or damp on the breast in the loft, the leadwork is one place to look. We photograph the joints from the roof or from a ladder and show you the lead on your own stack, so you can see whether the fault is the lead, the mortar or the stack itself.

Valleys, parapets and dormers: codes 4 to 8

The thicker codes appear as the use moves from the edge of a slope to the gutters that gather its water. Royston lists the uses as lettered groups, which this table turns into words:

Where each use takes lead, by code, as Royston lists them
UseCodes listed
Soakers3 and 4
Flashings4, 5 and 6
Pitched valley gutter4, 5, 6, 7 and 8
Parapet, box and tapered valley gutter5, 6, 7 and 8
Dormers4, 5, 6, 7 and 8

A pitched valley gutter is the fold where two sloping roofs meet, lined with lead. A parapet gutter lies at the base of a wall that rises above the roof, while a box gutter is a lead channel formed within the roof itself. A tapered valley gutter narrows along its length. Each of these collects the water from a whole slope or a whole wall, which is why Royston's groups for them begin at Code 5 or Code 4.

Code 7 and Code 8 appear in the valley, parapet, box and dormer groups but not in the flashing group. A dormer is a window set in its own small roof that rises from the main slope, and its cheeks (the sides) and its apron (the front) are leadwork too, which is why Royston gives dormers a line of their own.

Our guide to lead valley gutters takes the valley in detail, with its boards and its laps.

Which standard applies to lead: BS 6915, not BS 6229

Two British Standards crop up around roofing, and people confuse them. BS 6229:2025 deals with flat roofs finished in membranes laid on a continuous support, which is a different material from sheet metal. The 2018 edition was withdrawn on 16 December 2025. NFRC reports that the 2025 edition sets "a minimum 1:80 finished fall for general roof areas and internal gutters". All of that belongs to membranes. Lead is outside BS 6229.

For lead, England's Approved Document C (2013 edition) cites BS 6915:2001. A lead roof is therefore judged against the lead standard even when the roof is flat. If a quote for lead sheet says the work is to BS 6229, it names the wrong standard, and you should ask the roofer which one applies.

Approval for a re-covered roof is a separate question again, and each side of the border treats it differently:

  • In England, a re-roof touching under 25 per cent of the building envelope and under 50 per cent of the roof is, by the Planning Portal's account, not normally a job that needs an application.
  • For a Welsh address, the Welsh Government's wording is: "In most situations, this work will need Building Regulations approval."

Replacing a few feet of flashing is repair, not re-roofing. A whole lead roof or a re-covered roof with new lead falls into the re-roofing rules above, so with a house in Monmouthshire or Powys we put the question to the local council's building control team or a registered approver first.

Lead lifespans, and what changes on a listed house

Published lifespans for lead are wide, and each carries its own hedge:

  • HomeBuilding gives a lead flat roof as "60-100 years".
  • Less gives "50 to 100 years".
  • MyJobQuote's line is that "Lead flashing that is correctly installed can last for over 80 years".

Treat these as typical ranges, not guarantees, since they describe lead that was well detailed in the first place. The last is a claim about flashing that is correctly installed, so it is a hedged statement and not a minimum. Lead depends on its detailing, which makes the right code one part of a sound job and the fitting the other.

On a listed building, the leadwork may be among the features the listing protects. Works that would alter the special character of a listed building need consent. In England that is section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990; in Wales it is section 88 of the Historic Environment (Wales) Act 2023. Asking the council first is the safe course before changing the code, the colour or the detail of any lead, and a few photographs of the existing leadwork make that conversation easier.

Herefordshire has 64 conservation areas, and lead on a house inside one is also worth a call to the council. Our guide to lead on listed and period roofs covers matching and consent.

Our survey photographs the lead as found; a single written total follows, and we sweep up and take the old lead away.

Questions about lead codes

Is thicker lead always the better choice?

No. Royston lists each code for particular uses, and its flashing group stops at Code 6, so a heavier sheet is not automatically better. More weight also puts more load on the roof structure beneath it. The right code is the one the table lists for the job.

How can I tell which code is on my roof?

A roofer can measure the thickness of the sheet and compare it with the millimetre column. Royston's colours identify rolls at the supplier, but a sheet already on a roof may have weathered, so measurement is the better test. Photographs of the lead record what is there.

Which standard should a lead roof be detailed to?

England's Approved Document C cites BS 6915:2001 for lead. BS 6229:2025 deals with flexible waterproof coverings on flat roofs, which are membranes, so a flat lead roof still follows the lead standard and not the membrane one. A good quote names the standard it works to.