Callout 1 of 3
A timber frame under tile and slate
Our first callout is the frame, because on a timber-framed house the roof rests on the oak under it. The 1932 Royal Commission inventory says a house in Whitbourne parish is "timber-framed and with tile and slate-covered roofs". Oak settles and shifts across the years, and a covering laid over it has to tolerate that. We climb into the loft first and look at the horizontal timber at the top of each wall, the plate carrying the rafters, and at each rafter where it lands on that plate. Damp collects there well before it shows as a mark in a bedroom.
From outside, we study the verges and the line where covering meets frame. Mortar bedded tight against timber that moves will crack, so the repair uses a detail that can shift a little without parting. We photograph any gap from a ladder or tower, beside the very post it is opening against, so that you can see why the repair is needed. Where a rafter foot or a length of plate has decayed, the carpentry is a specialist task, and the report says so, so that a carpenter used to old frames can be brought in.
A re-roof on an old frame raises a question about air movement. Marley's ventilation guidance divides underlays in two. An HR underlay lets no vapour through, so the eaves need an opening of 25mm along their length on pitches of 15° or less, and 10mm on anything steeper. An LR underlay beneath a ceiling that is properly sealed may lean on the 3mm that ordinary eaves construction leaves, provided the certification conditions are satisfied. That is a narrow allowance, and a loft with a leaky ceiling does not qualify for it. The underlay and the eaves detail are chosen together and both appear in the photographs.
Re-covering is a matter for the Building Regulations as well as for the builder. In England the Planning Portal applies two tests together: under 25 per cent of the building envelope and under 50 per cent of the roof, below which the Portal expects no application. Where insulation is renewed with a roof, AD L 2021 Table 4.3 sets 0.16 for a renovated element worse than 0.35, and AD L 2026 Table 3.3 takes over from 24 March 2027. Our roof replacement page describes a complete new covering, stripped to the battens and finished at the ridge.
Where a Whitbourne roof meets its frame
- Wall plate
- Checked from the loft for damp and soft timber
- Rafter feet
- Looked at for staining and movement at the eaves
- Verge
- A detail that moves with the frame, not rigid mortar
- Underlay
- Chosen together with the eaves opening it needs
On a framed house the repair has to give a little with the oak, or it opens again.















