01432 610152 Get a quote Call 01432 610152

Roofers in Westbury-on-Severn

A roofing crew for Westbury-on-Severn houses, from loose capping to a whole new covering.

Your own roof is photographed before anything is priced, and the price then arrives as one written total.

Get a free quoteCall 01432 610152

Brick, lead and a spire at Westbury-on-Severn

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridge and verge linesCapping and verge mortar are tested by hand and logged with a photograph.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Stacks and their leadWe read each face of a stack and the lead dressed round it.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A spire and a listed houseA Grade I tower and spire and a Grade II house stand here.

Westbury-on-Severn in our service area

Westbury-on-Severn on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

The Westbury-on-Severn roof, ridge to spire

Three stops on a Westbury-on-Severn survey, from the ridge to the listed church

The survey climbs from the ridge of a village house to the lead round its chimney, then ends where a Grade I tower and spire, a conservation area and the rules for old buildings come into play.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge line; 2 Stack lead; 3 Church wall.

Fig. 1 Section through a Westbury-on-Severn roof: ridge, lead and church wall, each numbered.

Callout 1 of 3

The ridge above brick, Lias and sandstone walls

A survey begins where the roof meets the sky, so the first thing we check is the ridge, where capping tiles run along the crown of the roof. Under that ridge, Westbury-on-Severn's walls vary. The Victoria County History says of the parish, in its 1972 volume, that "The predominant building material is brick", adding that a coarse blue Lias stone has been fairly widely used for houses, farm buildings and walls in the south, with some Old Red Sandstone cottages in the east. Walls are one matter. The covering is another, and nothing in that account settles it, so at every house we look up and record what is there: clay, concrete or slate, and the way each piece is fixed.

Ridge capping is bedded in mortar, or else held down by a dry-fix system, which means clips and screws doing the work that mortar once did. We lay a palm on each capping tile and want stillness. A tile that shifts has lifted off its bedding, and the gaps between tile and mortar give rain a way in. Wet can then work into the top course and the battens, which are the slim timbers carrying the tiles, before any stain shows indoors. Marley, who make tiles, say mortar cannot be trusted alone to secure a covering any more, and BS 8612 covers the dry-fix alternative. Mortar still has a place. On a rebedded ridge each tile also gets a screw or clip, and we leave the bedded look in place wherever the house wears it well.

The verges come next, which are the sloping edges at each gable. Mortar there can drop out and leave the undercloak, the strip of tile or board beneath the edge, uncovered, so we look for that and for staining down the gable wall. Hips, the outward corners where two slopes meet, are checked in the same way. Anything loose is marked on a photograph with a note beside it.

Paperwork is its own subject. England's Planning Portal gives a two-part test for re-roofing: re-roofing needs no application as a rule when it touches less than 25 per cent of the building envelope and less than 50 per cent of the roof. Laying a heavier covering is outside that test. The Planning Portal puts the line at a weight increase of 15 per cent or more, and the order waits for a structural check. When one ridge is the whole story, roof repairs are the answer, and you can judge that from the pictures we send.

Read along a Westbury-on-Severn ridge

  • Capping tiles that rock under a palm
  • Mortar joints opened or crumbling
  • A fixing on each tile, mortar or dry-fix
  • Verge edges at both gables
  • Hip corners where two slopes meet

Walls tell you how a house was built. Only the roof tells you what it needs now.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Stacks, soakers and the lead that seals them

Chimneys come second. A stack rises clear of the slopes, wet on every face, and its run-off lands on the tiles below. We read the mortar joints course by course, then the flaunching, which is the mortar cap sloped to throw water off round the pots, and the pots themselves. Seen from the road, a stack shows only its lower courses, so each face and the cap reach you in the report as pictures.

Lead stops the leak at the point where a stack pierces the roof. Flashing here means lead tucked into a raked-out joint, then dressed down over the covering, and up each side little folded sheets called soakers run beneath the tiles or slates. A back gutter, a lead trough behind the stack, steers water round it. Royston Lead's cast-lead brochure matches each code to its uses, and Code 3 is recommended for lead soakers only, so the code goes with the job. Each length is dressed loose enough to expand and shrink as it warms and cools, which is why a tight, rigid fixing is the wrong one.

Split lead gets new sheet rather than a coat of sealant. A flashing that has only lifted may simply be dressed back and pointed. MyJobQuote says lead flashing can last for over 80 years, which is why sound lead stays put and is recorded, not renewed. Stacks that lean, or have lost courses at the top, can need rebuilding, and chimney repairs describes the options. If a stack is no longer wanted, taking it down below the roof and covering the gap is a different job with a sequence of its own.

Taking the breast out of a chimney brings its own paperwork. The Planning Portal is firm that Building Regulations approval applies every time a chimney breast is removed, since the breast is structural. On a shared wall the party wall notice comes from the owner, and a Westbury neighbour is entitled to at least two months of notice ahead of any start. Forest of Dean District Council Building Control, on 01594 812315, handles building control in Westbury-on-Severn, and a registered building control approver is the alternative.

Lead and masonry at a Westbury-on-Severn stack

Flashing
Lead let into the joints, dressed over the covering
Soakers
Folded lead under each course at the stack sides
Back gutter
A lead trough that sends water round the stack
Flaunching
The mortar cap, checked for cracks round the pots

Sound lead is left alone, and split lead is replaced with new sheet.

Fig. 3 Leadwork, drawn close

Callout 3 of 3

A Grade I spire and the village conservation area

Our third stop is the wall, where a house roof meets the older buildings round it. The National Heritage List holds several Westbury-on-Severn buildings. St Peter and St Paul's, the parish church, has a Grade I tower and spire (list entry 1299161, first listed 4 July 1985). The church itself is Grade II* (list entry 1101724), and Westbury House is Grade II (list entry 1101745), both first listed on 4 July 1985. A church roof follows a different rulebook from a house. Faculty for an Anglican church that still holds services, or listed building consent from the district council once a church has closed: the choice rests with the church's denomination and with whether a congregation still meets, so start with whoever governs the church.

A listed house has its own test. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works affecting a listed building's character. Permitted development is not lost, but the consent comes on top, so covering, lead and method are settled with the council before anything comes off the roof. We photograph the existing roof first, so the paperwork matches the roof as it stands, and that record also helps whoever looks after the house later.

Forest of Dean District Council also maintains the Westbury on Severn Conservation Area. A roof near the church should be set against its map before its look changes. Before work starts, ask Forest of Dean District Council whether an Article 4 direction applies to your address. Roof windows and dormers fall under separate rules, which our planning guide for roof windows sets out.

Our listed and heritage roofing page shows how a protected house is surveyed. Where scaffold must stand on the road, a section 169 Highways Act scaffold licence is needed. Scaffold hire is rolled into the one total, and we arrange the licence with our scaffolder.

A listing changes who must agree the work, so we ask before a tile moves.

What sets the price near Westbury-on-Severn church

Listing
Whether consent or a church's own approval comes first
Covering
Which material is on the roof and how much of it
Height
How far the scaffold must climb to eaves and stack
Detail
Lead, verges and chimneys on the house

One written total price, never itemised.

Westbury-on-Severn roofs: walls, spire and rules

How is a Westbury-on-Severn roof read when the walls differ from house to house?

Walls and roofs are separate records. The survey writes down the covering, its fixings and the battens beneath it, then the ridge, the verges and the stacks. The parish history names brick, blue Lias stone and Old Red Sandstone, so two neighbours can need quite different work. Each fault is photographed for you with a short note, and the written price covers what was found on your roof and nothing else.

Who must agree roof work on the Grade I tower and spire?

The list entry is 1299161, Grade I, first listed on 4 July 1985. Who agrees the work turns on the owner's denomination and on whether worship still goes on in the building. Should it be Anglican and still hold services, the faculty system applies; once a church closes, listed building consent from the council is needed instead. Ask the church's governing body first, then Forest of Dean District Council.

Does the conservation area at Westbury-on-Severn alter a re-roof?

Like-for-like repairs raise few questions. A new dormer is different, because the conservation area weighs on it, so Forest of Dean District Council comes first, before the loft is drawn. Forest of Dean District Council holds the map and decides applications, so check your address with it, and ask whether an Article 4 direction applies. Our planning guide covers roof windows and dormers.

Which approvals follow a re-roof with new insulation at Westbury-on-Severn?

In England, where Westbury-on-Severn sits, the Planning Portal asks two things of a re-roof: is less than 25 per cent of the building envelope touched, and less than 50 per cent of the roof? When both answers are yes, none is normally needed, and larger jobs pass to building control. Insulation brings in Part L: AD L 2021 Table 4.3 gives 0.35 and an improved 0.16, until Table 3.3 of AD L 2026 takes over on 24 March 2027.

Who licenses scaffold on a Westbury-on-Severn road?

Section 169 of the Highways Act 1980 requires a licence for scaffold that blocks a highway. Gloucestershire County Council's scaffolding licence is £145 for a minimum period of 28 days; after that, each further 7 days costs £36. At least twelve calendar days are needed first; we arrange the licence with our scaffolder, so the paperwork is off your desk. The start date we give you is set with that lead time in mind.

What happens to the stack when a Westbury-on-Severn chimney breast comes out?

Taking out a breast leaves the stack above it without support, so the two jobs are planned as one. Building Regulations approval applies to the breast. If it shares a wall with the neighbours, the building owner must serve a party wall notice before anything is cut. Party wall questions go to a party wall surveyor, not building control. The roof is made good afterwards.

Book a ridge-first survey in Westbury-on-Severn

Send a few photographs or a short note on what worries you, and we begin the survey at the ridge and work downward.

10-year workmanship guarantee, in writing