Callout 1 of 3
Lean-tos, outbuildings and the lead at the wall
Hallow has a listed public house with an attached outbuilding, the Crown, which Historic England lists at Grade II (list entry 1082956, first listed 15 October 1984). A roof that leans against a taller wall, whether it covers an outbuilding, a porch or an extension, finishes at an abutment, the line where the low roof stops and the wall rises above it. That line is the first thing we examine on such a roof, because every drop of rain that runs down the wall arrives there.
The abutment is sealed with lead cut in steps, each step seated in a higher course of the wall as the roof slope climbs, with a cover flashing lapped over it so that water sheds down and out. Small lead wedges hold the metal in its joint and pointing is run over them. In Royston Lead's table, Codes 4, 5 and 6 are marked for flashings. MyJobQuote says lead flashing "can last for over 80 years", so a well-fitted flashing can outlast several coverings, though only while the mortar around it holds and the lead can move.
We check for lead that has pulled out of its joint, for splits where the sheet has tired at a fold, and for the dark streak on the wall that shows where water has been tracking. A bead of mastic along the top edge is a patch that hides the fault, so the mastic comes off, the cause is traced and the lead is renewed. Where an abutment has failed and water has run behind the plaster inside, we trace the stain back with a moisture check on the inside face and a torch in the loft, because the entry point can sit well above the stain. If the wall itself is the problem, with loose pointing above the flashing, that gets repointed first, since the lead cannot hold in crumbling joints.
Where a roof covers premises that are trading, access and hours are agreed with the owner before we start, and the report keeps to what we saw and what we would do. Flashings, valleys and soakers get fuller treatment on our lead roofing hub.
Rainwater from the lean-to has to go somewhere, so the gutter along its low edge and the downpipe come next. We run water through the outlet to confirm that it drains away from the wall, since a blocked lean-to gutter overflows against the very wall we have just inspected.
Lead at a lean-to abutment
- Stepped flashing
- Follows the roof slope up the wall
- Cover flashing
- Laps over the step and sheds water outwards
- Lead wedges
- Hold the lead in the mortar joint
- Pointing
- Seals the joint over the wedged lead
- Fall
- Keeps water moving away from the wall
Rain that runs down a wall always ends up at the abutment, so that is where we look first.