01432 610152 Get a quote Call 01432 610152

Roofers in Raglan

Hipped chapel roofs, brick stacks and close-eaved slate in Raglan, surveyed from the top down.

Raglan is 28.1 road miles south of Hereford, a 39-minute drive. After each visit you get photographs and a single written total.

Get a free quoteCall 01432 610152

Hips, brick stacks and close eaves

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    A hipped chapel roofRaglan Baptist Chapel is recorded with C20 concrete tiles on a hipped roof.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A rebuilt red brick stackCadw records a rebuilt red brick stack at the right end of a shop.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Slate with close eavesSlates that stop close to the wall leave little room for the gutter.

Travelling to Raglan

Raglan on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Raglan roofs, hip to gutter

A hipped chapel roof, a brick stack and close eaves: Raglan in three callouts

The Raglan survey starts at the hips of a tiled chapel roof, moves to a rebuilt brick stack on a slate roof, and finishes at the eaves, where a gutter meets a roof that stops close to the wall.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Hips and ridge; 2 Brick stack; 3 Close eaves.

Fig. 1 A Raglan roof in section, with hip, stack and gutter marked in order.

Callout 1 of 3

Concrete tiles on a hipped chapel roof

Cadw's listing for Raglan Baptist Chapel, Grade II (record 24743, listed on 31 January 2001), describes a "Baptist Chapel, red brick, with C20 concrete tiles to hipped roof". A hipped roof slopes on every side, and a hip is the sloping line where two of those slopes meet at an outside corner. Each hip carries a row of capping tiles, as a ridge does, and every one has to be held against the wind. We climb to each hip, press the capping tiles by hand, mark and photograph any that move, and examine the tile that finishes the end of every run. Before a hip is touched, its line is photographed from the highest safe point, so the roof as found is on record and you can compare it with the finished job.

Concrete tiles come with two published life figures that do not agree. Marley, a maker, says roof tiles "are expected to last for around 60 years" and cautions that this promises no particular longevity, whereas HomeBuilding gives plain concrete tiles "40-50 years". Neither number describes the roof over your head, so the survey looks at the tiles themselves: cracks, chips, slipped tiles and the battens beneath any tile that has gone.

A bigger job moves into Building Regulations. The Welsh Government gives slate replaced by tiles as its example of a change of material, and it says approval "is likely to be needed". Paragraph 4.4 of the Welsh Approved Document A states: "A significant change in roof loading is when the loading upon the roof is increased by more than 15%." That means a structural check before a heavier covering goes on, and it is a Building Regulations point rather than a planning one.

The chapel is listed, and a Baptist chapel escapes listed building consent in Wales only on narrow terms. Regulation 2(1)(d) of the Listed Buildings (Exempt Religious Buildings) (Wales) Regulations 2024 exempts "church buildings owned by or held in trust for a church in membership with the Baptist Union of Great Britain or the Baptist Union of Wales" through two named corporations. Whoever governs the chapel can say whether that applies. Our pitched roofing page shows how hips, ridges and slopes work together.

Heavier coverings and approval

Does a heavier tile covering need approval?

The Welsh Approved Document A calls it significant when "the loading upon the roof is increased by more than 15%", so a structural check comes first. The Welsh Government also says a change of material is likely to need Building Regulations approval. Planning is a separate question.

A hip has two slopes feeding it, so it gets two looks.

Fig. 2 The ridge, drawn close

Callout 2 of 3

A rebuilt red brick stack on a slate roof

Cadw's listing for a shop and house in the village (record 24727, listed on 31 January 2001, Grade II) reads "Shop and house, painted stucco with close-eaved slate roof and rebuilt red brick right end stack". Stucco is a render, here painted, and a close-eaved roof is one whose slates finish near the face of the wall with little overhang. The words "rebuilt" and "stack" matter most for a roofer, because a rebuilt stack is newer work standing on an older wall. Raglan Post Office (record 24726) and Castell Coch (record 24731) are further Grade II entries in the village.

On such a stack we look first at the join between the old masonry and the new brick, where two ages of mortar meet. Then we read the pointing, which is the mortar face of every joint, the pots, and the flaunching, the sloped mortar that keeps the pots in place. A stack at the end of a roof is open to the weather on several faces, so we photograph each face from the nearest safe position and attach the pictures to the report. The report marks which faces show the older work and which show the rebuild, so you can see the joins for yourself.

Lead keeps the junction with the slates dry: a flashing wedged into the brickwork, soakers beneath it, and a back gutter behind. MyJobQuote says correctly installed lead flashing "can last for over 80 years", which is hedged and promises nothing, so the lead on your stack is judged on its own condition. Where it has split we replace it. A smear of sealant over a crack hides the fault without curing it.

Where a stack sits on a wall that belongs to both houses, the Party Wall etc. Act 1996 may apply to work that takes it down, and the building owner, not the roofer, serves the notice. Our chimney repairs page covers pointing, lead and rebuilding in detail, and the photographs show you each face before we quote.

Checked on a rebuilt stack

  • The join between old masonry and new brick
  • Pointing on every face
  • Pots and the flaunching round them
  • Lead flashing and back gutter
  • The top of the stack, photographed
Fig. 3 Chimneys, drawn close

Callout 3 of 3

Gutters on a close-eaved roof

The last callout is the gutter. On a close-eaved roof the slates stop near the wall, so the gutter sits tight under their edge and an overflow has little room to fall clear. Two boards finish the roof edge here: the fascia, which carries the gutter, and the soffit, which is the panel beneath the overhang. Staining or soft wood on either board is photographed, and the bottom course of slates is read for slips, since a slipped course drops rain behind the gutter and onto the wall head.

Brett Martin advises "1mm for every 600mm" as the fall to the outlet. A sagging or level run shows as standing water after rain, and a downpipe blocked with leaves turns the gutter into a tank. We clear the outlet and pour water along the run to see where it travels. Whatever the material, a gutter is judged on its own condition, so we look for cracked joints, loose brackets, splits at the outlet and any bracket pulled away from the fascia. Where a run has to come down, the new gutter is set to its fall before the brackets are tightened, and the old fixing holes are made good.

Raglan has a conservation area, designated by Monmouthshire County Council close to the village centre; the council's Raglan conservation area appraisal shows its extent. A conservation area counts as article 1(5) land in Wales, which keeps new roof windows and dormers outside permitted development, and the council is the body to ask. Ask it whether an Article 4 direction applies to your street too. Our planning guide for roof windows sets out the rules, and Building Regulations remain a separate question handled by the council or a registered building control approver. A listed shop or house adds listed building consent to any gutter or fascia change that alters how it looks, under sections 88 and 89 of the Historic Environment (Wales) Act 2023, in force since 4 November 2024.

Gutter work along a street frontage can need scaffold, and we arrange the licence with our scaffolder. Our guttering, soffits and fascias page covers replacement runs, capping and repairs.

The eaves line on a close-eaved roof

SoundGutter falling to the outlet, slate edge clear of it
Needs workStanding water, a sagging run, overflow marks on the wall

Raglan roofs: hips, stacks and eaves

How long should concrete tiles last on a hipped Raglan roof?

Published figures differ, and both are hedged. Marley says its roof tiles "are expected to last for around 60 years", yet HomeBuilding puts plain concrete tiles at "40-50 years". A hipped roof adds hip tiles and their bedding to the list of things to read, so the survey reads the hips, the end tiles and the battens before anyone suggests a re-cover. The photographs show you which it is, and the report says whether a repair is the better buy.

Does Raglan's conservation area change work on a brick stack?

It may. The Welsh Government says "Permitted development rights may also have been removed by an 'Article 4' direction", so ask Monmouthshire County Council whether one covers your street before a stack is altered or rebuilt. The council also confirms whether your address falls inside the Raglan conservation area, and we raise that question with the council before the quote is written, so the price rests on the right rules.

What do published guides give as the cost of gutter work?

MyJobQuote puts average gutter replacement at £1,000 to £1,600, with standard uPVC at around £40 to £50 per metre, and capping fascias and soffits at around £800. Which?, before VAT in November 2025, gives £75 to £350 for clearing all the gutters. These are national ranges and not Raglan prices, and each figure belongs to the guide that published it, with that guide's own date and basis. What we give you is a written total in one figure, worked out after the eaves, fascias and downpipes have been surveyed.

My Raglan house shares a chimney stack with next door: who serves the notice?

The building owner does. Section 2(2)(g) of the Party Wall etc. Act 1996 gives the right "to cut away from a party wall, party fence wall, external wall or boundary wall any footing or any projecting chimney breast, jamb or flue", and section 3(2)(a) requires a party structure notice to "be served at least two months before the date on which the proposed work will begin". For party wall questions a party wall surveyor, not building control, is the right adviser.

How much does a roof survey cost, according to published guides?

MyJobQuote gives a roof survey as around £300, with a basic visual inspection at £100 to £200, a full survey at £250 to £400 and a drone survey at £200 to £350. Those are third-party ranges. Our survey photographs the hips, stack and eaves from the places a ground-level look cannot reach, and it ends in one written total for any work that follows, with the photographs attached so you can show them to anyone else you ask.

If a Raglan roofing job goes wrong, what are my rights?

Section 49 of the Consumer Rights Act 2015 is headed "Service to be performed with reasonable care and skill". Citizens Advice can help on 0808 223 1133, or in Welsh on 0808 223 1144. Under section 308, the Digital Markets, Competition and Consumers Act 2024 also requires a trader to say which alternative dispute arrangement is available if you are dissatisfied with the outcome of a complaint. Keep the written total, the photographs and any messages, because they show what was agreed.

Book a hip-to-gutter survey in Raglan

Tell us what the roof looks like from the road, with a photo if possible. A survey comes first, then one total.

10-year workmanship guarantee, in writing