01432 610152 Get a quote Call 01432 610152

Roofers in Llantilio Crossenny

Roof repairs and re-roofs for Llantilio Crossenny's farmhouses, cottages and the houses around the church.

Our survey opens on the ridge, a photograph is taken of every fault, and the price you receive is one written total.

Get a free quoteCall 01432 610152

Roofs around St Teilo's church

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Slate and a wooden spireCadw's record for the church describes slate roofs, with a spire covered in wood.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Composition stone tilesWeir House has a hipped roof of twentieth-century composition stone tiles.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed farmhouse and cottageWhite House Farmhouse and Hostry Cottage are Grade II, so changes may need consent.

A map view of Llantilio Crossenny

Llantilio Crossenny on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Llantilio Crossenny roofs, read from the slope up

From composition tiles to a church spire: three checks on a village roof

Three callouts in survey order: the hipped slopes where a stone-tile look meets slate, the stacks above old farmhouse roofs, and the listed buildings and conservation area that shape every repair in the village.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Hipped slopes; 2 Stacks and lead; 3 Listed gables.

Fig. 1 A cut-through of a village roof, numbering the slope, the stack and the listed gable.

Callout 1 of 3

Slate, composition stone tiles and the hips between them

Slopes make up most of the roof area, and the list entries for Llantilio Crossenny describe more than one covering. For the Church of St Teilo, Cadw records slate roofs, with the spire the exception because it is covered in wood. For Weir House it records a hipped roof of twentieth-century composition stone tiles. Composition tiles are factory-made to resemble cut stone. A hip is the ridge-like line formed by two slopes turning an outward corner. Because each covering hangs on differently, our survey names what is up there before anything is lifted, and the photographs let you see for yourself.

Working down from the ridge, we read the slope course by course for slipped, cracked or missing pieces, then look at what holds them. Natural slates hang from nails or hooks, and a corroded nail can release a slate that is perfectly sound, so the fixing is checked as closely as the slate. Cupa, a slate supplier, reports that BS 5534:2014+A2:2018 indicates a minimum pitch of 20 degrees for natural slate, subject to moderate exposure, a 500mm slate and a 115mm overlap, and that hook fixings "should not be used on any pitch below 25º". Pitch therefore enters the conversation before a new slate is ever chosen.

Hips get a separate inspection. Capping is bedded in mortar, but Marley, a tile maker, states that after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". A rebedded hip here is fixed mechanically too, and we photograph the old bedding so you can see exactly what it had lost.

This village is in Wales, which changes the rulebook. Of re-roofing, the Welsh Government says: "In most situations, this work will need Building Regulations approval." Where a repair or re-cover touches "less than 25 per cent of the area of a pitch or flat roof", that department's roof page puts the work outside the normal need for an application. On the planning side, re-roofing in Wales is normally permitted development when the finished roof keeps the old roof's look, as far as is practicable. Swapping slate for another material should be raised with Monmouthshire County Council first, and the planning guide for roof windows covers the wider planning picture.

Checked across each slope

  • Slipped, cracked or missing slates and tiles
  • Nails and hooks holding each slate
  • Capping and its fixings along each hip
  • Battens and underlay seen from the loft
  • How the covering meets its neighbours

Before we name a covering for any slope, we read what is already on it.

Fig. 2 The slopes, drawn close

Callout 2 of 3

Farmhouse stacks, lead flashings and reaching them safely

White House Farmhouse and Hostry Cottage both appear on Cadw's list at Grade II. A house of that age may well have a stack rising through its roof, and a stack is the place where wind, rain and frost all go to work on a few courses of masonry. We study each face from the ground first. Higher up, from a ladder or a scaffold, we examine the pointing, meaning the mortar that fills the gaps between units, and the flaunching, the mortar fillet that beds the pots. The crown of a stack is invisible from the lane, which is why each face and the flaunching arrive in your report as photographs.

Lead seals the meeting of stack and slope. Flashings are lead strips let into a joint, then dressed down onto the slope. Soakers are folded lead pieces threaded under the slates one course at a time beside the stack. Behind the chimney lies the back gutter, a lead trough directing run-off to the two flanks, since a stack stands like a wall across the slope. Royston Lead's table marks Code 3 as "Recommended for lead soakers only" and lists Codes 4 to 6 for flashings, so thickness follows the job. MyJobQuote says correctly installed lead flashing "can last for over 80 years". Sound lead therefore stays, and split lead is renewed instead of being sealed over.

On a listed farmhouse, the sensible method can be to take the stack down, number each unit and rebuild it as it stood. That plan is agreed with the council before the first unit moves. Cutting away a chimney breast that you share with the neighbours is party wall work: under that Act the building owner serves notice, and neighbours must receive it at least two months prior to any work on the breast. A surveyor is appointed only when a neighbour dissents or fails to answer inside 14 days; written consent from the neighbours can settle it sooner.

Where scaffold must stand on the public highway, section 169 of the Highways Act 1980 calls for a scaffold licence, and Monmouthshire County Council publishes its own application form. We arrange the licence with our scaffolder. The scaffold is priced into the single written total rather than added afterwards. For stack rebuilds and repointing in detail, see chimney repairs.

Lead and masonry at a farmhouse stack

Flashings
Lead let into joints and dressed over the covering
Soakers
Folded lead under each slate beside the stack
Back gutter
A lead channel that turns water round the stack
Pointing
Raked out and refilled where joints have opened
Flaunching
The mortar fillet that beds the pots
Fig. 3 Chimneys, drawn close

Callout 3 of 3

St Teilo's, the listed houses and the conservation area

Cadw lists the Church of St Teilo at Grade I (record 2073, designated 19 November 1953) and Weir House at Grade II (record 24285, designated 27 October 2000). In Wales, section 88 of the Historic Environment (Wales) Act 2023 requires works that affect a listed building's character to be authorised, and section 89 provides for listed building consent. Both have applied since 4 November 2024. A listed house retains householder permitted development rights; consent is required on top of them. Covering, fixings and method are therefore settled with Monmouthshire County Council before any slate is stripped from a listed roof here.

A church sits on a different path from a house. Welsh regulations exempt a short list of denominations, together with church buildings under the Church of England's faculty jurisdiction, but only while a building's main use is worship. A listed church outside the list, or one that has stopped being used for worship, needs listed building consent. Which applies to St Teilo is not something we assume. If it is in use, whoever governs the congregation's buildings should hear about the roof first. A minister's house falls outside the exemption altogether.

Monmouthshire County Council keeps a Llantilio Crossenny conservation area covering the middle of the village. Inside it, a roof light added to a Welsh house needs planning permission, because roof lights are not permitted development on conservation-area land. Check whether an Article 4 direction applies with Monmouthshire County Council, too. For questions on whether a job needs planning permission at all, the council's Duty Planning Officer is on 01633 644831.

Monmouthshire County Council handles building control for a re-roof here through the Building Control team based in Usk, and a registered building control approver is the alternative. Our listed and heritage roofing page describes how a protected roof is planned, starting with the survey photographs and ending with the final course laid, including the paperwork we assemble for the council: photographs, a written scope and a note of the materials proposed.

Vocabulary for a protected roof

Composition tile
A factory-made tile styled to look like cut stone
Hip
The raised line where two slopes meet at an outside corner
Listed building consent
Permission for works that affect a listed building's character
Article 4 direction
A council order withdrawing some permitted development rights
Flaunching
The mortar fillet that beds chimney pots

Questions from Llantilio Crossenny roofs

Can the slate roofs in Llantilio Crossenny be repaired without stripping a whole slope?

Yes, where the slates, battens and underlay beneath are sound. We lift the affected area, swap out cracked or slipped slates, renew failed nails or hooks and relay the rest. Should the survey find battens or underlay failing across a slope, a patch would only postpone the work, and the report says so. The Welsh Government's roof guidance describes work on "less than 25 per cent of the area of a pitch or flat roof" as outside the normal need for an application.

What do the listed farmhouses around Llantilio Crossenny mean for roof work?

White House Farmhouse and Hostry Cottage are Grade II on Cadw's list. Under the Historic Environment (Wales) Act 2023, works that affect a listed building's character need listed building consent, with sections 88 and 89 in force from 4 November 2024. The house keeps its permitted development rights, but consent is needed too. The decision rests with Monmouthshire County Council, so the choice of covering and the way it is fixed are put to the council first.

Is a composition stone tile the same as a stone tile?

No. Cadw's entry for Weir House describes a hipped roof of twentieth-century composition stone tiles, which are made tiles imitating stone, whereas a true stone tile is cut from sandstone. SPAB writes that "many are changed to different stones or even to slates or fake stone slates". A repair here matches the covering already on the roof, and the survey photographs let you see the tile in question.

Does a new roof on a Welsh house need more insulation?

Welsh Approved Document L, in Table 4.1, gives 0.13 W/m²K for a brand-new roof on a standing house. Re-covering an existing roof counts as renovation, where Table 11.1 asks for 0.16, and not worse than 0.35 where 0.16 is not feasible. Upgrading the whole roof is expected once more than 50% of that element is renovated, and the economic test is a payback within 15 years. The Welsh edition due on 4 March 2027 will replace these tables, so the figures are checked again when the quote is written.

Does scaffold on a village road need a licence from Monmouthshire?

Yes, if it obstructs the highway, because section 169 of the Highways Act 1980 requires one. The form Monmouthshire publishes carries an administration fee of £108, then £27 per week to extend, and it wants 5 working days at the least before erection. If a Llantilio Crossenny house stands beside a main road, that is noted at the survey. We arrange the licence with our scaffolder, and the written total counts it in.

What happens if the survey turns up bats or a nest under the slates?

Work on that stretch pauses while we check. Section 1 of the Wildlife and Countryside Act 1981 makes it an offence to "intentionally" take, damage or destroy a wild bird's nest during the period in which the nest is "in use or being built". In Wales a licence for work touching a bat roost comes from Natural Resources Wales. We photograph what we find, tell you, and plan the repair around the licence advice.

Book a survey for your Llantilio Crossenny roof

Describe what shows from the lane or the loft, and our reply will be a survey date, then one written total.

10-year workmanship guarantee, in writing