01432 610152 Get a quote Call 01432 610152

Roofers in Much Marcle

Valley lead, flat extensions and listed walls in Much Marcle, looked at from the skyline downwards.

The report pairs photographs of what we find with one total price in writing.

Get a free quoteCall 01432 610152

Much Marcle valleys, flat roofs and church walls

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Valleys where two slopes meetTwo slopes drain into a valley, so its lead gets checked closely.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Flat-roofed extensionsA flat roof must still fall to an outlet, so its edges matter.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed cottages and the churchHouses and churches follow separate consent routes before any covering is changed.

Getting to Much Marcle

Much Marcle on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Much Marcle roofs, valley to church wall

A Much Marcle house in section: valley, flat roof and listed church wall

Our survey here starts where the slopes meet, in the valley and its lead, moves on to the flat-roofed extension and the fall of its roof, and finishes at the church and listed cottages that decide which consent a repair needs.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Valley; 2 Flat roof; 3 Church wall.

Fig. 1 Valley, flat roof and church wall picked out on the drawn house.

Callout 1 of 3

Valley lead where two Much Marcle slopes meet

Two slopes that run together leave a trough between them, called a valley, and the water from both ends up in it. The Royal Commission's 1932 inventory describes the walls of monuments 9 to 40 in Much Marcle parish as timber-framed and their roofs as covered with tiles or slates. Where tiles or slates meet at an angle, the valley between them is lined, in lead or another sheet, and that lining is what the survey examines at the first callout.

A valley lined in lead is a pitched valley gutter. Royston Lead's brochure lists Codes 4, 5, 6, 7 and 8 for that use, and sets Code 3 aside for soakers alone, so the thinnest sheet is never asked to do a valley's work. The lead has to be wide enough that water running off a steep slope cannot jump the edge and get under the tiles. We look at the width on each side, at the tiles cut to the angle, and at the laps, which are the overlaps where one length of lead runs into the next.

Moss, leaves and silt build up in a valley and hold water against the lead. Photographs are taken before the clearing and after it, so the report shows the change. Cleared by hand, a valley shows whether the sheet is split, lifted or worn through at the centre. MyJobQuote says correctly installed lead flashing "can last for over 80 years", which is a reason to repair a valley with sound lead before replacing it. Where lead has split along a fold, a patch is a short-term answer, and the photographs show whether a new length is needed. Sound lead with cracked tiles beside it keeps the repair small, and the written price follows the size of the repair, whatever the roof looks like from below.

The tiles beside a valley are cut, so their edges are exposed to the water. Cracked cut tiles are replaced and the bedding checked. A valley in the middle of a roof is reached by a roof ladder or from a scaffold, and that access sits inside the one total price. Our lead roofing page lays out valleys, flashings, soakers and back gutters in turn.

Cleared and checked in a Much Marcle valley

  • Silt and moss lifted out by hand
  • Lead splits along folds or at laps
  • Width of lead showing on each side
  • Cut tiles beside the valley, cracked or loose
  • Bedding under the cut edges

A valley gutter takes run-off from both pitches beside it, so its lead earns a close look.

Fig. 2 The valley, drawn close

Callout 2 of 3

Flat-roofed extensions and the fall that clears water

The second callout is the flat-roofed extension, the part of a Much Marcle house added to an older pitched roof. Flat is a word for the look, because a working flat roof slopes. BS 6229:2025 sets the current standard for flat roofs finished with a flexible waterproof membrane. NFRC, the roofing federation, reads it as setting a minimum 1:80 finished fall, and IKO, a membrane maker, advises designing for 1:40 to achieve that. A roof that holds a pool of water after rain has lost fall, and the survey looks for ponding marks, the dried rings left where water sat.

Membranes age differently, and the published ranges are typical and not promises. HomeBuilding puts EPDM, a synthetic rubber sheet, at 25 to 30 years, while Less gives 30 to 50 years. For GRP, glass-reinforced plastic formed as one continuous skin, HomeBuilding says 25 to 30 and Less 25 to 40. For felt, the figures are 10 to 15 from HomeBuilding and 10 to 20 from Less. Where two sources disagree, we quote both, and the actual condition of the membrane on your roof counts for more than either range. Because the three coverings fail in different ways, the report names the one you have and says what its edges show.

Edges are where flat roofs fail. The upstand is the upturn of membrane against a wall, and the drip edge is where the sheet bends down into the gutter. Both, plus the laps and every pipe or vent through the sheet, are photographed for the report. Under AD L 2021, re-covering a flat roof in membrane counts as renovation, so Part L is raised before the sheet is laid, and the insulation is checked against the table rather than assumed. To find the fall we lay a level along the roof and measure the drop over a known run, which tells us whether the deck or the build-up needs correcting before a new sheet goes on.

Our flat roofing page covers the membranes in turn. A flat roof next to a pitched roof also depends on the flashing between the two, which is checked at the same visit.

Flat roof membranes, as published

EPDM
HomeBuilding 25 to 30 years, Less 30 to 50
GRP
HomeBuilding 25 to 30 years, Less 25 to 40
Felt
HomeBuilding 10 to 15 years, Less 10 to 20
Finished fall
A minimum of 1:80, per NFRC on BS 6229:2025
Fig. 3 Flat roofs, drawn close

Callout 3 of 3

St Bartholomew's, listed cottages and the conservation area

St Bartholomew's has a Grade I listing (list entry 1156241, first listed 6 March 1967). The church comes under the Church of England: with worship continuing, the roof falls under the faculty system and does not go to the council for consent. Phillips House is Grade II* (list entry 1099029, first listed 18 November 1952). Causeway Cottage is Grade II (list entry 1099027, first listed 21 June 1984), and Bower Cottage is Grade II (list entry 1156311).

Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 means a listed cottage cannot have works that affect its character without consent. Permitted development rights stay, and consent applies as well, so a re-covering is agreed with Herefordshire Council before work begins. Which route applies depends on the denomination: the exemption holds for any Methodist, URC or Roman Catholic church in Much Marcle while worship goes on, and for a Baptist Union one a Schedule 1 trust corporation holds, and Quaker and Unitarian meeting houses and closed churches take listed building consent instead. Because a listing covers a whole building, a flat extension behind a listed cottage can fall inside it as well; the list entry says what is protected, and the council confirms the position for the part you plan to touch. Our listed and heritage roofing page describes how a listed roof is handled.

Herefordshire Council's designation dates give the Much Marcle conservation area as designated in 1976. The county has 64 conservation areas, and the council shows the boundary of each. Adding a dormer or a roof window to a Much Marcle house raises planning questions, covered in our planning guide for roof windows. The Article 4 question is for the council: check whether an Article 4 direction applies with Herefordshire Council before a design is settled.

Building control for a Much Marcle address is Herefordshire Council Building Control, on 01432 261938 or at bce@herefordshire.gov.uk, and a registered building control approver is the alternative. Much Marcle lies 15.7 road miles out of Hereford to the south-east, some 26 minutes' drive, and the written quote covers the travel. Because the village is a drive from the city, we plan the day around one trip, and the survey, the photographs and the written total price all arrive from one visit.

What sets the price of a Much Marcle roof job

Roof type
Pitched, valley or flat, each with its own materials
Extent of the fault
A patch, a length of lead or a whole membrane
Access
How the roof is reached, included in the total
Consent
Time and drawings if the building is listed
What lies beneath
Decking or timber that needs attention once it is exposed

One written total price, never itemised.

Much Marcle roofs: valleys, flat roofs and listings

Why do valleys on Much Marcle roofs get a closer look than slopes?

Every drop from both neighbouring slopes ends up in a Much Marcle valley, so a split in its lead lets in more water than a missing tile on a single slope would. We clear the silt by hand, check the lead for splits at the folds and laps, and look at the width of lead on each side. Photographs of the valley go in your report before a repair is priced.

Which consent route applies when St Bartholomew's church needs roof repairs?

St Bartholomew's is listed Grade I under list entry 1156241 and belongs to the Church of England. As services carry on at the church, the faculty jurisdiction governs roof work and the council's listed building consent does not apply. Meeting houses of the Quakers and Unitarians, and churches that have closed, stay outside the exemption, and listed building consent from Herefordshire Council applies there.

Does a flat-roofed extension in Much Marcle need Building Regulations approval?

Under AD L 2021 a flat roof given a new membrane counts as renovation, so building control is asked before the work starts. By the Planning Portal's England test, roof work affecting less than 25 per cent of the building envelope and less than 50 per cent of the roof normally falls outside the application requirement. A new membrane over a whole extension may go past those limits, and building control confirms.

How long should an EPDM or GRP flat roof last in Much Marcle?

Sources disagree, so both are named. HomeBuilding gives EPDM 25 to 30 years and Less gives 30 to 50. For GRP, HomeBuilding says 25 to 30 and Less says 25 to 40. These are typical ranges and not promises. The condition of your own membrane, its fall and the state of its edges tell us more than either range, and the report records all three with photographs.

Is a Much Marcle cottage in the conservation area, and does that matter for re-roofing?

Herefordshire Council's list gives the Much Marcle conservation area as designated in 1976, and the council holds the boundary map. Re-roofing in matching material is maintenance, while roof windows and dormers raise planning questions that our planning guide covers. Ask the council whether an Article 4 direction applies before you decide to change the roof's appearance, since a direction in force changes what you may do without applying.

What happens about the scaffold licence on a Much Marcle job?

Licensing under section 169 of the Highways Act 1980 applies to any scaffold that blocks a footway or carriageway. We arrange the licence with our scaffolder. Herefordshire Council's fee is £167 for a maximum of one month, £123 per month for extensions, and it asks for at least 10 days' notice. National Highways, not the council, covers trunk roads and motorways. The written quote includes the scaffold itself.

Arrange a Much Marcle roof survey

A picture of the valley, the flat roof or whatever concerns you is enough to get a visit arranged.

10-year workmanship guarantee, in writing