01432 610152 Get a quote Call 01432 610152

Roofers in Little Hereford

Roofing in Little Hereford, a village 20.3 road miles north of Hereford.

The name says city; the work is village roofs. You get pictures of each fault and one total price in writing.

Get a free quoteCall 01432 610152

Gutters, windows and a Grade II* church

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Eaves and guttersA gutter that leaks soaks the wall head and the rafter feet beneath.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Roof windows in old slopesCutting a window into a slope brings Building Regulations and planning questions.
  • Newer homes with grey concrete tile roofs along a curving estate road
    St Mary Magdalene's churchA Grade II* church roof follows its own consent route, not the council's.

Mapping Little Hereford

Little Hereford on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Little Hereford roofs from gutter line to church

Gutters, roof windows and the church wall: a Little Hereford roof survey

Our order in Little Hereford starts at the eaves and gutter, moves up to any roof window in the slope, and ends at the timber frame, the Grade II* church and the council's lists.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Eaves line; 2 Roof window; 3 Frame and church.

Fig. 1 Little Hereford's eaves, roof window and framed gable, each numbered on the drawing.

Callout 1 of 3

Eaves and gutters on Little Hereford's older roofs

The eaves form the lowest edge of a roof: the covering projects past the wall there, and the gutter is fixed beneath it. Under the heading "Hereford, Little", the Royal Commission on Historical Monuments listed monuments 5 to 14 in its 1934 volume. Unless an entry said otherwise, it found them built in the 1600s, of two storeys, with timber frames under tile or slate. That is the commissioners' record, not a description of your house. What matters for the survey is what your own eaves show today.

A gutter has one job, and it needs a fall to do it. Brett Martin, who make gutter systems, put the fall at "1mm for every 600mm". We sight along each run for sagging brackets, open joints and standing water, and we count the brackets against the length of the run. A leaking joint wets the wall head and the rafter feet (the lower ends of the rafters), and in a timber-framed house that wet can travel on to the wall plate beneath. A roofer who looks only at the covering misses the cause.

Behind the gutter sit the fascia, which carries it, and the soffit, the board that shuts off the overhang from below. We probe timber boards with a blade for softness, starting at the top edge where a leak has run, and we look for daylight where a board has parted from the wall. Plastic boards are checked for warp and for joints that have opened. If a board is sound, it stays; if it has gone, the report says so and shows the photograph.

Where each downpipe ends we check where the water goes. A gully that is blocked, or a pipe that empties against a wall, undoes good work higher up, and the photographs follow the water from the roof edge to the ground so you can see the whole path. Where the roof drains onto a stone plinth or a footing, that spot is the first to be inspected after a wet spell.

Where the eaves are out of reach of a ladder, the written quote already contains the access. Our guttering, soffits and fascias hub describes the systems we fit and how each run is set out.

One question about the gutter line

Can a leaking gutter be repaired, or must the whole run go?

A loose bracket or a single open joint can be mended. A run that sags along its length, or has split from end to end, is the better buy replaced than patched again, and the report tells you which case you have.

The gutter beneath the last course of tiles keeps the roof edge dry.

Fig. 2 Eaves and gutters, drawn close

Callout 2 of 3

Roof windows in a Little Hereford slope

A roof window sits within the slope itself, and putting one in means opening the roof. The rafters are cut and framed around the opening, the covering is trimmed back to a flashing set, and the loft below gains daylight. Three sets of rules meet at this callout, and each asks a different question: energy, planning and, for a loft room, escape from fire.

On site we mark the opening from inside the loft before anything is cut, count the rafters that fall within it and agree the position with you, so the window sits where the room needs it. Only then does the covering come off. The surround is fitted and lapped in sequence from the bottom edge upward, and the felt or underlay beneath it is lapped over the frame as it goes.

Little Hereford is in England, so the energy figures come from AD L 2021. Table 4.2 gives roof windows a figure of 1.4 W/(m²·K), or, on the Window Energy Rating scale, Band B at minimum; 2.2 is the figure for rooflights, not for roof windows. If the roof is renovated and its insulation retained, Table 4.3 applies instead, with a threshold of 0.35 and an improved figure of 0.16. AD L 2026 takes over on 24 March 2027, when the tables are renumbered 3.2 and 3.3.

For planning, the conditions on roof windows appear in full in our planning guide for roof windows. Look at it first when you are weighing up a new opening, especially if the house is listed or lies in a conservation area.

If the new window lights a loft room, means of escape comes in. Where a dwelling has a storey more than 4.5 m above ground, paragraph 2.5 of AD B gives two options, either a protected stairway or an alternative escape route; the document is the 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments. Escape windows are for storeys within 4.5 m of the ground. A Velux and skylight job is therefore as much a paperwork question as a carpentry one, and we set both out before the first rafter is cut.

Terms on a roof window job

Roof window
A window set in the plane of the slope, hinged or pivoting
Rooflight
A light on a kerb above the slope, with its own figure
WER Band B
Energy rating band that can be used instead of the 1.4 figure
Trimmer
Timber framing the opening so the cut rafters are supported
Flashing set
Pre-formed surround that seals the frame to the covering
Fig. 3 Roof windows, drawn close

Callout 3 of 3

The timber frames, the church and the council's lists

Our third stop is a framed gable end. The joint where covering meets timber is the first place we look there: we check for gaps, for crumbled bedding and for wet marks on the wood, and from the loft we trace the wall plate for damp. A repair on an old frame uses the material the house was built with, so that the new work and the old timber sit together.

Herefordshire's building stone atlas, published in 2012, describes the sole-plate, the lowest horizontal beam of a frame, as normally bedded on dressed sandstone or siltstone. Where a roof sheds its water near such a plinth, the foot of the frame is the part to check, because damp climbs timber from the bottom as well as dripping down on it from above.

St Mary Magdalene's Church is listed at Grade II* (list entry 1082535, first listed 11 June 1959). Its denomination is Church of England, so roof works are authorised by faculty, not by listed building consent. Oaklands (list entry 1082537, first listed 23 September 1987) and The Old Rectory (list entry 1082538, first listed 11 June 1959) are Grade II. For a listed house, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 asks for consent to alterations that touch its special interest, in addition to whatever permitted development rights it holds. Our listed and heritage roofing page shows how we plan work on such houses.

Ashford Carbonell, across the county boundary, has a conservation area of Shropshire Council's. Whether a Little Hereford address stands inside any area is for Herefordshire Council to confirm from its own list, as is the question of an Article 4 direction. Herefordshire has 64 conservation areas, so the list is worth a look before any change to a roof.

For a Little Hereford address, Herefordshire Council Building Control (Plough Lane, Hereford) answers on 01432 261938 or at bce@herefordshire.gov.uk. You may choose a registered building control approver instead. Before and after pictures of the roof go into the file either way.

A faculty, a listing and a conservation area are three different doors to knock on.

A framed gable, joint by joint

SoundCovering and timber meet cleanly, with bedding intact on both sides
Needs workA gap showing light, bedding crumbled, wet marks on the timber

Little Hereford roofs: gutters, windows and the church

What does the 1934 survey say about roofs in Little Hereford?

Filed under "Hereford, Little", monuments 5 to 14 in the Royal Commission's 1934 inventory of Herefordshire were found, unless an entry said otherwise, to be built in the 1600s, of two storeys, timber-framed and roofed in tile or slate. It records what the commissioners saw, not what your house wears now. Coverings change over the centuries, so a survey reads each roof as it stands and photographs the faults for you.

Does roof work on St Mary Magdalene's church need listed building consent?

The church is Grade II* (list entry 1082535) and has a Church of England congregation, so works are authorised through the faculty system, not listed building consent. That exemption lasts only while services continue there, and it covers the faculty route rather than any council approval. Unitarian and Quaker meeting houses, closed chapels and Churches Conservation Trust buildings are different, and need consent from Herefordshire Council.

What changes if my Little Hereford house is listed like Oaklands?

Oaklands and The Old Rectory both carry Grade II list entries, 1082537 and 1082538. Section 7 of the 1990 Act requires consent for alterations to a listed building's special interest, and a house's permitted development rights stay in force beside that requirement. Photographs from the survey can go with your application. Matching a covering and changing one are separate questions. Agree materials with Herefordshire Council before any tile or slate comes off.

If we insulate a retained roof in Little Hereford, which U-value applies?

In England, AD L 2021 Table 4.3 sets a threshold of 0.35 and an improved figure of 0.16 for retained roofs. Paragraph 4.13 lets the designer settle for the lowest figure that is feasible when 0.16 cannot be reached or cannot pay back within 15 years, generally no worse than 0.7. AD L 2026 applies from 24 March 2027, and we confirm which edition governs your job at the survey.

Does a conservation area cover my Little Hereford roof?

That is a question for Herefordshire Council's list, not for a guess. The nearby Ashford Carbonell conservation area is Shropshire Council's, over the boundary, so for a Little Hereford house it is Herefordshire Council that confirms whether you sit inside an area, and whether an Article 4 direction covers it. Either answer changes what you may do to the look of a roof, so ask before ordering any new window or covering.

How much notice does Herefordshire Council want for scaffold on a Little Hereford lane?

At least 10 days. Section 169 of the Highways Act 1980 requires a licence whenever scaffold blocks any part of the public road, and Herefordshire Council charges £167 for a maximum of one month, £123 for each month after that. We arrange the licence with our scaffolder; the scaffold is part of the price you are quoted, so no separate bill follows. Highways Licensing is on 01432 261800, and National Highways, not the council, runs trunk roads and motorways.

Arrange a gutter-first survey in Little Hereford

Describe the fault or send a photograph taken from the lane, and a date to look at the roof from the eaves up is offered.

10-year workmanship guarantee, in writing