01432 610152 Get a quote Call 01432 610152

Roofers in Lindridge

Roof repairs and re-roofs in Lindridge, from brick stacks to the Grade II parish church.

The survey starts at the ridge and chimneys, the photographs come to you, and the price arrives in writing as one total.

Get a free quoteCall 01432 610152

Height, brick and a listed church

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    A three-storey vicarageThe 1913 county history records a late Georgian vicarage three storeys high.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Late Georgian brickworkBrick stacks of that period need joints, bedding and lead checked together.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A Grade II parish churchSt Lawrence's roof is a faculty matter for the Church of England.

Lindridge and its district

Lindridge on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Lindridge roofs from three storeys up

A tall brick house, its gutters and the church: three callouts over Lindridge

Our Lindridge survey begins on the stacks of a tall brick house, drops to the gutters and the scaffold they call for, and finishes at St Lawrence's church and the rules that govern a listed roof.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Brick stacks; 2 Gutters and scaffold; 3 Church and lists.

Fig. 1 A Lindridge roof sectioned: stack, gutter run and church wall.

Callout 1 of 3

Chimney stacks on a three-storey brick house

The Victoria County History (1913) calls the Lindridge vicarage "a late Georgian red brick building three stories high with a tiled roof". Three storeys of brick lift the ridge and chimneys far above the garden, and that height decides how we survey. Seen from the lane, a chimney is a silhouette. Seen from a ladder it has four faces of brick, a bed of mortar around the pots and a skirt of lead at the slope, none of which can be judged from the ground.

We climb to the stack before anything else, because it is exposed to rain and wind on all four sides. First come the pots and the mortar bed that holds them. A bed that has cracked lets rain soak down the flue and into the breast below. Next, the joints between bricks. Raked-out joints are a repointing job, while a brick that has flaked at its face is a different fault, and the report photographs them separately so you can see which one you have. Each picture is labelled with the face of the stack it shows, so the order of the report matches the order of the climb.

Lead is the waterproofing at the foot of the stack. One strip is chased into the brickwork and dressed down across the tile surface, and folded pieces called soakers are tucked beneath the tile courses at either side. Royston Lead lists Code 3 as "Recommended for lead soakers only", and shows Codes 4, 5 and 6 for flashings. MyJobQuote says correctly installed lead flashing "can last for over 80 years". Lead that is sound stays, and lead that has split is renewed rather than coated with sealant.

Along the ridge, the same hand-over-hand check runs from gable to gable. A capping tile that shifts under a gloved palm is photographed where it sits, because a loose piece at that height is a fall hazard as well as a leak.

Reaching the top of a three-storey stack takes scaffold, and the cost of that scaffold is carried in the single price we write down. Taking a stack away altogether is a bigger decision: the Planning Portal says "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." A breast that backs onto a neighbour's house also brings in the Party Wall etc. Act 1996, under which it is the building owner who serves notice, giving the neighbour at least two clear months before a breast is cut. Our chimney repairs page covers rebuilding and repointing.

Checked on a Lindridge stack

  • Mortar bed cracked around the pots
  • Pointing open on any of the four faces
  • Brick faces that have lost their surface
  • Lead lifted where it meets the slope
  • Pots seated upright in their bed

A stack three storeys up needs photographs, because nobody can judge it from the lane.

Fig. 2 Chimneys, drawn close

Callout 2 of 3

Long gutter runs and a scaffold licence in Lindridge

A downpipe on a three-storey wall is a long run with many joints, and every one of them is a place for rain to leave the system. We check the brackets for sag, the joints for weeping, the outlet for moss and the back edge of the gutter, which can sink below the roof edge and let rain spill behind the board and over the brickwork. Brett Martin gives the fall as "1mm for every 600mm", and a run that has lost it keeps a standing pool along its length.

Timber comes next: the fascia the gutter hangs from and the soffit beneath the eaves. A screwdriver tip pushed into the fascia shows soft wood at once. Soffits are a different question. HSE tells owners that a house built or refurbished before 2000 should be treated as if asbestos is in it, and its list of locations names white soffit boards beneath the eaves. A board that looks like insulating board is photographed and tested before anyone touches it, since taking out that board is usually licensed work and goes to a licensed firm.

Scaffold standing on a pavement or over a carriageway needs a licence under section 169 of the Highways Act 1980. For Lindridge the highways authority is Worcestershire County Council, which expects the contracted company to apply. Its fee for each week is set out in the questions below. Where the plot is deep enough, the scaffold can stand wholly inside the boundary, and the survey notes where it can stand.

On a long wall, a renewal goes in from the top down. The new run is hung to its fall first, the brackets are spaced for the weight of the water sitting in it, and the downpipe is fixed so that it can be cleared from the bottom. If the old run was cast metal, the report notes it and the joints are photographed before it comes off. Our guttering, soffits and fascias page lists the materials.

The gutter run on a tall Lindridge wall

Brackets
Firm, evenly spaced, no sag between them
Joints
Dry, with the seals still sound
Outlet
Clear of moss and leaf litter
Downpipe
Fixed to the wall and open to the drain
Fascia
Timber firm under a screwdriver tip

On a house this tall, a gutter that has lost its fall is a pool in the air, soaking the wall behind.

Fig. 3 Gutters and downpipes, drawn close

Callout 3 of 3

St Lawrence's church, listing and who decides

Historic England lists the Church of St Lawrence at Grade II (list entry 1081397, first listed 27 February 1986). St Lawrence is a Church of England church. For a church like that in use, the diocese's faculty system takes the place of listed building consent, so the first move on a slipped tile or failing lead is a letter to the church's own authorities. An answer in writing before a scaffold is booked saves a wasted visit.

A house is a different case. Where one is listed, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works that would "affect its character as a building of special architectural or historic interest". The consent is separate and extra: listed status does not remove permitted development rights, so the council is shown the covering, fixings and lead details first. On a listed house we photograph each slope before a tile is touched and number the pictures against a sketch, so the council can see exactly what is being changed. For roof windows and dormers, read our planning guide.

Malvern Hills District Council publishes the conservation area list, so look up your Lindridge address there before altering a roof's appearance. The council's published position on Article 4 is this: "At present there are no Article 4(2) Directions in force in Malvern Hills District Council."

South Worcestershire Building Control covers a Lindridge address; Malvern Hills District Council, Worcester City Council and Wychavon District Council run it together. A registered building control approver is the other route. Old tiled roofs on brick houses are repaired by keeping every tile that is still sound and replacing the ones that have failed, because that keeps the colour and texture of the roof. If the whole covering is spent, Marley's figure for roof tiles is around 60 years and HomeBuilding's for plain concrete tiles is 40-50 years, so the age of the tiles guides how far a repair is worth taking. Our listed and heritage roofing page describes the work on protected buildings.

The tiled verge against a brick gable

SoundTiles lap evenly and the verge is bedded firm
Needs workSlipped tiles, cracked verge mortar, a gap at the brick

Lindridge roofs: scaffold, church, nests and insulation

What does scaffold for a three-storey Lindridge roof involve?

On a house this tall the scaffold is the biggest access question, so it is settled at the survey. Where it must stand on the highway, Worcestershire County Council charges £85 per week and £65 for subsequent weeks, plus a £25 urgency surcharge for applications within 2 days, and it expects the contracted company to apply. The written quote covers the scaffold, and the survey records where it will stand and how long the job is expected to keep it up.

Does St Lawrence's church in Lindridge need listed building consent for roof work?

While St Lawrence is used for worship the answer is no: a Church of England church sits under the faculty jurisdiction, and the diocese's system replaces the council's. The listing is Grade II. If worship ended, the exemption would end too, and Malvern Hills District Council would handle listed building consent. Ask the church's own authorities for written confirmation before any scaffold is booked, and keep it with the job papers.

How big a re-roof needs Building Regulations approval in Lindridge?

The Planning Portal's test for England has two limbs: less than 25 per cent of the building envelope, and less than 50 per cent of the roof. Work that stays inside both limits would not normally call for an application. Go past either limit, or choose a covering 15 per cent or more heavier, and approval is required with a structural check first. South Worcestershire Building Control or a registered building control approver deals with it.

Is a Lindridge house covered by a conservation area?

Malvern Hills District Council holds the answer, because it publishes the conservation area list, and your address should be matched against it before anything is altered. The council has also stated that no Article 4(2) Directions are in force at present. Dormers and roof windows are a separate matter, set out in the planning guide, and a like-for-like repair of existing tiles is judged differently again.

Will a nest under a Lindridge eave hold up the work?

It can. The nest of any wild bird is protected under section 1 of the Wildlife and Countryside Act 1981 once it is being built or occupied, and whoever intentionally takes it, damages it or destroys it commits an offence, so work beside an active nest waits. Bats are protected as well, and a licence for work that affects them comes from Natural England. The survey records any nest or sign of bats before the job is programmed.

Does a Lindridge re-roof mean upgrading the loft insulation?

Renovating a roof brings in Part L. Under AD L 2021 Table 4.3 the roof threshold is 0.35 and the improved figure 0.16, and paragraph 4.13 allows the work to settle on the lowest feasible figure if the upgrade could not pay for itself within 15 years. AD L 2026 takes over from 24 March 2027. Spray foam is a separate matter: RICS reported in March 2023 that parts of the lending market had grown concerned, giving equity release mortgages as one example, so check with your lender.

Tell us what the Lindridge roof is doing

Send a photo and the road name, and we will book a photographed survey of the stacks, ridge and gutters.

10-year workmanship guarantee, in writing