Callout 1 of 3
St Michael's church, Maes Court and Hilltop Farmhouse
On a listed group the walls come first. St Michael's church in Knighton on Teme holds a Grade I listing (list entry 1167609, dated 18 April 1966). Maes Court is Grade II (list entry 1081425, dated 6 October 1952), and so is Hilltop Farmhouse (list entry 1081424, dated 27 February 1986). A barn and stable about 9 metres west of the farmhouse are Grade II as well (list entry 1167654). Each entry is a separate question about what its roof may be given. The covering on each is established on site, never assumed, and every building gets its own photograph set and numbered notes, kept apart in the report.
Because St Michael and All Angels is a Church of England church, any roof job there goes before the diocese's faculty system, and the council's listed building consent is not the route while worship continues. Closure would change that. The photographs and written scope from a survey are made to travel with the faculty application.
The houses are different. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 bites on works that would change a listed building's special interest, so a repair matching the existing covering and a switch to another material go to Malvern Hills District Council as separate questions. SPAB's advice on matching old stone or slate is to put any claim of unavailability, or any long delivery time, to the quarries themselves, and that check comes before we suggest a change. The survey pictures can go in with any application, which saves a second visit to the roof.
Malvern Hills District Council holds the list of conservation areas, so check whether your address appears there before you plan any work. On Article 4 directions, the council states: "At present there are no Article 4(2) Directions in force in Malvern Hills District Council." Our listed and heritage roofing page deals with protected buildings in more depth.
Church roof, consent route
Does roof work on a Grade I church need listed building consent?
No, as long as services continue in a Church of England church: its roof work goes through the faculty system instead. Once a church closes, listed building consent from Malvern Hills District Council applies in its place, so the route is worth confirming at the start.
On a listed group, every roof is its own conversation before any tile is lifted.