Tiled slopes, flat decks, a Grade II* church

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Tiled ridges and hipsA rocking capping tile means the bedding below it has failed.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Flat roofs on extensionsWithout enough slope towards its outlet, an extension's membrane holds puddles.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Church of St MichaelSeveral listed buildings, one at Grade II*, each with its own consent question.

Upper Sapey within our radius

Upper Sapey on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Upper Sapey roofs from ridge tile to church wall

Ridge, flat deck and listed frame: an Upper Sapey roof survey

In Upper Sapey we start on the tiled ridge, turn to a flat-roofed extension and the membrane on it, and finish at the older frames, the Grade II* church and the lists the council keeps.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Tiled ridge; 2 Flat roof; 3 Frame and church.

Fig. 1 Upper Sapey's tiled ridge, flat extension and listed frame, each drawn and numbered.

Callout 1 of 3

Ridge and hip tiles at Upper Sapey

Ridge tiles come first because they sit highest and show most from below. Upper Sapey appears in the Royal Commission's second Herefordshire volume, of 1932, where monuments 4 to 9 share one description: 17th-century, two storeys, timber frames, "tiled roofs". Along the top of a tiled roof runs a row of capping tiles and, on a hipped roof, another row follows each hip. Each sits on a mortar bed or is clipped and screwed down, and each can work loose.

A capping tile that moves under the flat of a hand has lost its bed. We look for open mortar joints, for tiles that have slid out of line and for splitting or rust at a clip. Below the cap, a cracked or slipped tile leaves the underlay and the battens (thin timbers nailed across the rafters to hang the tiles on) exposed to whatever falls on them. Photographs are shot from the ground, then again at arm's length, so you can see the fault for yourself rather than rely on our description. A tile that seems fine when seen from the lane may still be cracked across its back. If a hip has lost its bedding, the tiles either side of the loose one are tested as well, and the report lists every tile that moved under the hand.

Pitch decides what can lie on a roof. Marley's table sets the minimum pitch of a Lincoln pantile at 15 degrees and of a Canterbury clay tile at 40, and those are product names rather than regional types, with the data sheet having the last word. For clay, Marley reports a BRE minimum life expectancy of 60 years, while HomeBuilding's table gives clay tiles "60-80 years". Treat both as typical ranges, not forecasts for your own roof.

A ridge repair touches a small part of the building envelope, far less than the Planning Portal's limits for England, which are less than 25 per cent of the envelope and less than 50 per cent of the roof. A whole re-cover may reach them. Our pitched roofing hub explains which coverings and fixings suit each roof, and the report after each survey says whether a repair will hold.

A question about hips

Do the hip tiles need replacing when the ridge is rebedded?

Not by default. Hip tiles are checked in the same visit, and sound, firmly fixed ones stay where they are. If the bedding under them has failed, the ridge visit is the sensible moment to rebed them as well.

Pictures at arm's length put the fault on the page, not just in our words.

Fig. 2 The ridge, drawn close

Callout 2 of 3

A flat-roofed extension and its membrane

Any extension, porch or garage with a flat roof gets its own callout, because flat roofs go wrong differently from pitched ones. Rain must travel across the surface to an outlet, so the surface has to fall towards it. NFRC's summary of BS 6229:2025 gives 1:80 as the minimum finished fall, on open roof areas and in internal gutters alike, and IKO advises designing for 1:40 so that 1:80 is achieved in the finished roof. Its scope is membranes laid on a continuous deck, whether on flat roofs or on curved ones pitched at 10 degrees or less. A puddle still sitting on the deck long after the rain has stopped tells us the fall is not enough.

Flat roofs are covered with EPDM rubber, GRP (glass-reinforced plastic) or felt, and the published lifespans do not agree. HomeBuilding gives EPDM 25-30 years where Less gives 30 to 50; for GRP the figures are 25-30 against 25 to 40; and for felt 10-15 against 10 to 20. We set out both ends because the sources differ; all are ranges, not pledges.

On a survey we look for blisters, splits and open laps in the membrane, for the upstand where it turns up a wall, for the outlet and for the edge trim. Water that lies against an upstand is the first thing we check. Each finding is photographed, with the camera held low enough to show the standing water and not just the surface.

Rain leaves a flat roof by way of a gutter or a hopper, and the outlet is inspected from above and, where the ceiling allows, from below. A blocked outlet turns a small fall into a pond, and a loose gutter bracket at the edge trim can let the water run behind the fascia instead of into the gutter. The report states whether a patch to the membrane will hold or whether the roof needs re-covering, with the reasoning set beside the photographs, so the decision is yours and rests on pictures, not on our say-so.

Under AD L 2021, renewing the waterproof layer of a flat roof is renovation, so Table 4.3 applies, with a threshold of 0.35 and an improved figure of 0.16, and paragraph 4.13 allows a relaxation where 0.16 cannot be achieved or the energy saving cannot repay the outlay inside 15 years. From 24 March 2027 the same ideas sit in Table 3.3 of AD L 2026. Insulation is therefore part of the membrane question, and our flat roofing hub explains the build-ups that fit.

What we read on a flat roof

Fall
Standing water noted, set against the 1:80 minimum
Membrane
Blisters, splits and open laps
Upstands
Where the membrane turns up a wall
Outlet
Gutter or outlet clear and set low
Edge trim
Drip edge fixed and sealed

Water lingering on a flat roof after rain says the fall is short.

Fig. 3 Flat roofs, drawn close

Callout 3 of 3

St Michael's, the farmhouses and the council's lists

Our last callout takes in the older frames and the buildings listed around them. Where a timber-framed wall carries a roof, damp that reaches the frame can show as staining or softness at the foot of a post or under the wall plate, the timber that the rafters bear on. We check both from the loft, and photograph any mark with a rule beside it so its size is on record.

St Michael's Church carries a Grade II* listing (list entry 1275895, first listed 9 June 1967). St Michael and All Angels belongs to the Church of England's Greater Whitbourne parish, which puts its roof under the faculty jurisdiction instead of the council's listed building consent. Brook Farmhouse is Grade II (list entry 1275896, first listed 9 April 1952), Lower Field is Grade II (list entry 1216724, first listed 12 April 1973) and Church House is Grade II (list entry 1234918). A listed house is different: section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 sets a consent requirement on alterations affecting the house's special interest, and permitted development rights remain as a separate matter.

To find out whether an Upper Sapey address lies in one of Herefordshire's 64 conservation areas, look it up on Herefordshire Council's own list and ask the council whether an Article 4 direction applies. Dormers and roof windows prompt more planning points than an Upper Sapey re-cover does, and our planning guide for roof windows explains each one.

For Building Regulations, Herefordshire Council Building Control (Plough Lane, Hereford) answers on 01432 261938. Alternatively, a registered building control approver may be engaged. Our listed and heritage roofing hub shows the order in which a protected roof is tackled, with photographs at every stage. A listed farmhouse and a listed church are looked at on separate visits if need be, since access, consent and the people we speak to differ for each.

Costs that shift on a listed roof

Consent route
Faculty, listed building consent or neither, settled first
Matching materials
Whether the original covering is kept or matched
Access
Whether scaffold stands on one side or on all four
Condition
How much timber is found rotten once the covering is off
Roof size
The number of slopes, and their pitch

One written total price, never itemised.

Upper Sapey roofs: tiles, flat decks and listed buildings

What did the 1932 inventory say about roofs in Upper Sapey?

Filed under "Sapey, Upper", monuments 4 to 9 were described by the Royal Commission as buildings of the 17th century with two storeys, timber frames and tiled roofs, apart from any entry that said different. That note describes what the commissioners found, which is not necessarily what covers your house now. A survey reads your own slopes, photographs each fault, and says whether mending or renewal is the wiser course.

Is a faculty or listed building consent needed for the roof of St Michael's, Upper Sapey?

The church is listed Grade II* (list entry 1275895) and is Church of England, so provided it remains in use for worship, work is authorised by faculty, not by listed building consent. Had it closed, or were it a Friends' or Unitarian meeting house, it would fall outside the exemption and need consent from Herefordshire Council. The parish can confirm the faculty position before scaffold goes up.

How does Brook Farmhouse's Grade II listing affect roof work?

Brook Farmhouse (list entry 1275896), Lower Field (1216724) and Church House (1234918) are each Grade II. Consent under section 7 of the 1990 Act is needed for alterations that touch a listed building's special interest, and it comes alongside permitted development rights, not instead of them. Agree materials and method with Herefordshire Council before work, and take our survey photographs and the list entry number with you; both help the council answer.

How long should a flat-roofed extension at Upper Sapey last?

Published figures disagree, so we give both. HomeBuilding gives EPDM 25-30 years and Less gives 30 to 50; GRP is 25-30 against 25 to 40; torch-on felt is 10-15 against 10 to 20. None is a promise, and a roof without a proper fall can fail early in any material. The survey measures the fall, records the condition of the laps and upstands, and says what the membrane needs, whether that is a repair, a re-cover or a change to the outlet.

Is there a quick way to check conservation area status in Upper Sapey?

Herefordshire has 64 conservation areas, and the council's published list will show whether yours is among them. While you are asking, find out from Herefordshire Council whether an Article 4 direction applies to your address. A direction can withdraw specified permitted development rights across a defined area, which would change what you may do to the front of a roof. The answer should come before you order any new window or covering.

What do the scaffold licence terms look like on an Upper Sapey lane?

Under section 169 of the Highways Act 1980 a licence is needed once scaffold obstructs the highway. Herefordshire Council's fee is £167 for a maximum of one month, £123 for each month after that; the council wants at least 10 days' notice. We arrange the licence with our scaffolder. Highways Licensing is on 01432 261800, and National Highways handles motorways and trunk roads.

Have your Upper Sapey ridge and flat roof read

Describe the fault or attach a photograph; an appointment to survey the roof from its highest point follows.

10-year workmanship guarantee, in writing