01432 610152 Get a quote Call 01432 610152

Roofers in Wichenford

Wichenford roofs, repaired or replaced, in a Worcestershire parish 48 minutes north-east of Hereford.

We check the edges and joins first, photograph what we see, and turn the answer into one total price on paper.

Get a free quoteCall 01432 610152

525 residents and a listed Forge

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    A listed ForgeThe Forge is listed Grade II, list entry 1082934.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A red brick houseThe 1913 Victoria County History calls Wichenford Court red brick of about 1700.
  • Newer homes with grey concrete tile roofs along a curving estate road
    A small parishAt the 2021 Census, Wichenford parish had 525 usual residents.

A map view of Wichenford

Wichenford on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Wichenford roofs, verge to listed wall

Gable verges, lead valleys and a listed forge: three callouts on a Wichenford roof

A Wichenford survey begins at the gable edge, open to the wind on its outer side. It moves on to the valley, whose lead lining carries the run-off of two slopes, and ends at the walls where listing and consent come in.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Gable verge; 2 Lead valley; 3 Listed forge.

Fig. 1 A Wichenford roof drawn in section, with verge, valley and wall numbered.

Callout 1 of 3

Verge bedding on a Wichenford gable

The verge is where a roof ends sideways, along the sloping edge of a gable wall, with the outer row of tiles overhanging the brick. Traditionally that edge sits on a mortar bed, the tiles bonded to the wall head. Dry-verge systems reach the same result using clips, screws and trims, and BS 8612 is the specification for dry-fix components. Marley's line is that installing to BS 5534 isn't required by law; what changed with the 2015 amendments is that mortar was no longer accepted as the only thing securing a covering. So a verge repaired today gets a mechanical fix as well as a bed.

A gable catches a wind-driven shower along its edge ahead of the main slopes, so the survey starts there. Sighting along the verge from the ladder, we look for mortar that has cracked, parted from the brick or gone altogether, and for outer tiles that have crept toward the gutter. The overhang is carried by a barge board or an undercloak, the board or slate strip tucked in behind the edge, and we check whichever is there for rot and gaps. A loose verge tile that falls is a hazard to anyone below, so it is made safe before anything else.

A 1913 volume of the Victoria County History, on Wichenford, says that the present house at Wichenford Court, a quarter of a mile south-east of the church, is "in the main a red brick building of about 1700". It speaks of that one house, and says nothing of its roof or of any neighbour's. If a brick gable of that age stands under your verge, the junction between brick and tile gets a close look, because old brick drinks water and the bed beneath the tiles can fail from behind as well as from above.

Photographs trace the verge from ridge to eaves, each close-up set beside a shot of the whole gable, so the repair can be judged as a whole. Where only the mortar has failed, a rebed with fixings counts as a repair and is priced as one. Where the undercloak has rotted, that board comes first. Our roof repairs page sets out what a repair covers, and the survey leads to a single written total. Once the repair is agreed, the old bed and any broken tiles go into the skip, the gutters beneath are cleared of mortar droppings and the ground is swept before we leave.

Verge points photographed at a Wichenford gable

  • Mortar parted from the wall head
  • Edge tiles slipped toward the gutter
  • A mechanical fixing at each verge tile
  • Undercloak or barge board free of rot
  • The junction of brick and tile

A verge bed can fail from behind, where old brick feeds it water, as well as from above.

Fig. 2 The verge, drawn close

Callout 2 of 3

Lead in the valley where two slopes meet

At the inside angle between two slopes, the angle itself becomes a channel, and on a lead roof the channel is lined with sheet. Rain from both slopes drains through it, so a pinhole there matters more than one in a flashing, and the lining is generally heavier. Valleys also fill with moss, seed heads and silt, so we clear the channel before reading the lead, because a lining looks very different once the debris is off it. Royston Lead's table lists five codes against a pitched valley gutter: Codes 4, 5, 6, 7 and 8. Code 3 is "Recommended for lead soakers only". The code is a thickness, and thicker sheet takes more skill to dress without splitting it.

On survey we lift the nearest tiles on each side, because the edges of the lining sit under them and hide the most. Our eyes go to splits at the folds, to creep, which is lead sliding down the slope under its own weight, and to debris lying in the channel and holding water against the sheet. The lining is also checked where it laps beneath the tiles, since that is where it is tucked away from view. A dark stain on the underside of the rafters below is a clue that the leak is inside the valley and not at a tile.

On lead flashing that is correctly installed, MyJobQuote writes that it can last for over 80 years. That line is about flashings, so it is no measure of a valley lining, and even for a flashing it is a hedge, never a floor or a promise, resting on lead fixed so that it can move. AD C cites BS 6915 for lead, and BS 6229:2025 deals with flat roof membranes and leaves lead aside, so the metal has a standard of its own.

A valley with a single split can be patched, whereas a lining worn along its whole length is relined, and a lining that has crept far down the channel may need its upper end refixed too. The photographs show the full channel from top to bottom, so the choice is plain to see before any price is agreed. The lead roofing service page has more on valley linings and the other lead details.

Royston lead codes and where each is used

Code 3
Recommended for lead soakers only
Code 4
Soakers, flashings, pitched valley gutters, dormers
Code 5
Flashings, pitched valley gutters, parapets, dormers
Code 6
Flashings, pitched valley gutters, parapets, dormers
Codes 7 and 8
Pitched valley gutters, parapets, box gutters, dormers
Fig. 3 The valley, drawn close

Callout 3 of 3

The Forge, old brick and the consent questions

Historic England lists The Forge at Grade II (list entry 1082934, first listed 15 October 1984). Listing puts a consent step in front of a new roof. Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, altering a listed building's special interest takes consent, and the building keeps its permitted development rights while it does. Malvern Hills District Council takes the enquiry for a repair in the same material and for a change of covering alike, and the survey photographs go with it.

Whether an address sits in a conservation area is answered by the council's own conservation area list, so look yours up there. Malvern Hills District Council also reports that it has no Article 4(2) Directions in effect for the moment, so no Article 4(2) direction is withdrawing rights here, though the council is still the one to ask. The planning guide for roof windows covers the English rules on roof alterations.

Work that needs approval is handled by South Worcestershire Building Control, which Malvern Hills District Council, Worcester City Council and Wychavon District Council run in partnership, or by a registered building control approver. Scaffolding that stands on the highway wants a licence, which for this parish comes from Worcestershire County Council, and its page says the contracted firm is "required to apply". A scaffold on private ground raises neither point.

Where old brick sits under the roof, covering and wall have to be treated as one system. SPAB's note on stone and slate roofs warns against taking a supplier's word that a match is unobtainable without asking the quarries, so we ask them directly before any substitute is specified. A listed building's roof is also assessed from the ground first, so photographs from the road and the garden come before a ladder goes up. Our listed and heritage roofing page sets out the approach.

Where a gable meets old brickwork

SoundEdge tiles sit tight, the bed is full and the brick is dry
Needs workGap under the verge, mortar parted, brick darkened by damp

Wichenford questions on verges, lead and re-covering

Can the verge on a Wichenford gable be rebedded without disturbing the tiles?

Sometimes the mortar is the only failed part, and the tiles above can stay put, which keeps the job small and the price with it. We lift just the edge tiles, clear out the old bed and set the tiles back on mortar plus a mechanical fixing, which fits Marley's account of the 2015 amendments to BS 5534. Should the undercloak behind the verge have rotted, that board is replaced first, and the photographs show which case you have.

What thickness of lead goes into a Wichenford valley?

Royston Lead's cast-lead table lists Codes 4, 5, 6, 7 and 8 against a pitched valley gutter, and recommends Code 3 for lead soakers only. Heavier codes are stiffer and cost more to work, so the choice depends on the length and slope of the valley. We read the table before cutting, and the written total price says which code the valley gets.

How should the eaves of a Wichenford roof breathe under a new underlay?

The answer turns on which underlay goes down. For a cold roof, Marley sets a continuous 25mm opening along the eaves at pitches of 15° or less and 10mm above that when the underlay is high-resistance (HR), a kind that stops vapour passing through. Where the underlay is air-permeable and the ceiling is well sealed, ordinary eaves construction at 3mm serves, provided the UKAS certification conditions are met in full. We check the label on the roll.

How much of a Wichenford roof can be re-covered without an application?

There are two limbs to the Planning Portal's test. Where less than 25 per cent of the building envelope is affected, and less than 50 per cent of the roof too, no application is normally needed. The envelope takes in walls, floor, roof, windows, doors and roof windows together. A heavier covering falls under a different rule. South Worcestershire Building Control can confirm where your house stands, because the answer turns on how much is replaced.

What do price guides say ridge and lead repairs cost near Wichenford?

Which?, in a November 2025 survey (ex VAT), gives £80-£300 for a new ridge tile. MyJobQuote gives £225 to £550 as the 2026 average for ridge tile replacement, and its chimney leadwork page has a patch to the flashing at typically around £200, against an average of around £570 for full replacement. All of these are UK-wide guides by third parties, and none is our price. The figure you receive comes in writing once the survey is complete, and it takes in everything the job needs.

What can I do if a Wichenford roof job goes wrong after I have paid?

Section 49 of the Consumer Rights Act 2015 requires a trader's service to use reasonable care and skill. Begin by writing to the firm, enclosing the survey photographs and the date of the work, and keep copies of everything. If the reply does not settle it, Citizens Advice runs a consumer helpline on 0808 223 1133. Section 308 of the DMCC Act 2024 also obliges traders to tell you what dispute arrangement is available.

Book a Wichenford roof survey

Send the lane or house name with a few words about the problem, and a date can be set for the survey and its photographs.

10-year workmanship guarantee, in writing