01432 610152 Get a quote Call 01432 610152

Roofers in Grimley

Roof repairs and re-roofs for Grimley homes, with a Grade II* church in the parish.

From the ridge to the roof windows, each finding is recorded in photographs and ends in one total price.

Get a free quoteCall 01432 610152

Grimley roofs from ridge to rooflight

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridge and hip linesCapping that rocks or shows open joints needs its bed renewed.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Roof windows and rooflightsA window set into a slope needs sound flashing and a tight frame.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Grade II* church, Grade II houseListed buildings here and a canal conservation area nearby shape the consents.

Grimley and nearby villages

Grimley on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Grimley roofs, ridge to church wall

Ridge, roof window and church wall: three stops on a Grimley survey

We begin at the ridge and its hips, move to any roof window set into a slope, and finish at the Grade II* church and the listed house whose rules govern repairs in the parish.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge and hips; 2 Roof windows; 3 Church and house.

Fig. 1 Ridge, roof window and church wall, picked out on a section.

Callout 1 of 3

The ridge and the hips, checked tile by tile

The ridge is the line where the two slopes meet at the top of a Grimley house. A hip is the angled external corner at which neighbouring slopes join lower down. Both are covered by capping tiles, and both are where a survey starts. A fault up there can show indoors as a damp patch in the loft, directly beneath the apex, before it reaches a bedroom ceiling.

From the ladder, we try each capping tile with a gloved hand. Capping that shifts when pushed has lost its mortar bed, and one that lifts clear has lost its fixing too. Photographs of the capping bare, with a note of which tiles rocked and which lifted, go into the report so that you can compare one tile with the next. Joints that have opened admit rain onto the course below, and the tile at each end of the line, which finishes the ridge against the gable, takes the roughest treatment from the wind. On a hip the capping runs downhill, so the lowest tile needs a fixing that stops it sliding, and we check that one first. At the point where hip and ridge join, three runs of covering converge, so that junction gets a slower look than the length of either.

Marley, the tile maker, says that installing to BS 5534 is not required by law, but that mortar stopped being enough on its own after the 2015 amendments. BS 8612 sets out the dry-fix alternative, in which clips, screws and a batten take the place of a mortar bed. Neither system is better by default. A bedded ridge can be lifted, cleaned off and refixed with a mechanical fixing added, which suits an older house, while a dry system suits a roof where the ridge is straight and the pitch is regular.

The repair depends on the tile beneath it. The BRE's 60-year minimum is a clay figure only. Clay and concrete age differently, so we identify the covering before proposing a ridge repair, and the photographs show the capping bare. Plain clay tiles and interlocking concrete ones also differ in the way their capping is set out and fixed, so the repair is matched to the roof beneath it and not to a standard pattern. Our pitched roofing hub covers ridges, hips and verges together with the coverings they finish.

A Grimley ridge line

Sound ridgeCapping bedded and fixed, joints full, end tile tight
Ridge needing workCapping rocks, joints are open, mortar is crumbling

Three lines of covering meet at a hip, so that junction gets the slower look.

Callout 2 of 3

Roof windows set into a Grimley slope

The second callout is the window in the slope. A roof window is a glazed unit lying in the plane of the roof that opens like an ordinary window. A rooflight is different: it is a fixed or flat-glass unit, for example in a flat or low-pitched roof. The frame is surrounded by a flashing kit that dresses over the neighbouring tiles, and it is the flashing, more than the glass, that decides whether the opening stays dry. A kit is made for a particular covering, such as plain tiles, interlocking tiles or slate, so it is chosen to suit what is already on the roof.

We look at the corners of the flashing first, then at the lead or aluminium apron along the lower edge and at the seal where the frame meets the lining indoors. From the loft, a tide-mark on the timber trimmers around the opening, or a patch of damp insulation, shows that a leak has been running in. Misted glazing is a separate fault, caused by a failed seal between the panes, and it needs a new glazed unit and not a new flashing.

Energy rules apply to a replacement. In AD L 2021 Table 4.2, 1.4 or WER Band B is the target for a roof window, as it is for any window. A rooflight is held to 2.2 instead. The two are not interchangeable, so the unit we specify depends on which one is being replaced. AD L 2026 Tables 3.2 and 3.3 take over from 24 March 2027.

If a window serves a loft room, fire escape rules come in. Approved Document B for England, paragraph 2.5, offers a choice between a protected stairway and an escape route by another means, and escape windows under paragraph 2.10 serve only storeys within 4.5 m of the ground. Whether a new opening needs planning permission is a separate question, answered in our planning guide for roof windows. Our skylights hub deals with fitting new units and replacing old ones. Where a replacement is needed, the old unit's size is measured from the opening and noted, so the new one fits without cutting back any timber.

Checked around a Grimley roof window

  • Flashing corners and the apron below
  • The seal between frame and indoor lining
  • Misting between the panes of glazing
  • Tide-marks on timber trimmers in the loft
  • Whether the unit is a window or a rooflight
Fig. 3 Roof windows, drawn close

Callout 3 of 3

St Bartholomew's, The Dallows and the canal conservation area

Callout three, the wall, carries two listings in Grimley. St Bartholomew's Church holds a Grade II* listing (list entry 1349352, first listed 29 July 1959), and The Dallows is Grade II (list entry 1179202, first listed 15 October 1984). The ONS recorded 640 usual residents in the parish at the 2021 Census. Grimley is 29.2 road miles north-east of Hereford's centre, about 51 minutes' drive, so it sits inside our 30-mile reach.

A first look at a church or a large house can be done from the garden and from inside the loft, with no scaffold, which gives the report a baseline before any consent is sought.

For a listed house, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent for works that would alter its special character, and permitted development rights remain with the consent sitting alongside. Holy Communion is held at St Bartholomew's every month, on the 3rd Sunday, and being an Anglican building still used for worship, it takes its roof consents by faculty rather than from the council. The diocese should hear about a roof plan before the scaffold goes up.

The Bevere and Droitwich Canal conservation areas lie close to Grimley, and both belong to Wychavon District Council, not Malvern Hills. For a Grimley address itself, Malvern Hills District Council keeps the conservation area list, so check your address against it before planning work that changes how a roof looks. At present, according to the council, there are no Article 4(2) Directions in force.

Building control is shared between Malvern Hills District Council, Worcester City Council and Wychavon District Council under the name South Worcestershire Building Control; a registered building control approver is the other option. Highways Act 1980 section 169 covers scaffolding on the highway, and Worcestershire County Council grants those licences. For a listed roof the survey records the list entry, the covering, the lead and the ridge separately, and our listed and heritage roofing hub explains how that report is built.

What sets the price of a Grimley listed roof

Consent
Whether the council must agree before work begins
Covering
Matching the existing tile, ridge and lead
Access
Scaffold height, position and time on site
Roof windows
How many openings need new flashing or units
Condition
What lies beneath the covering when it is lifted

One written total price, never itemised.

Grimley roofs: ridges, windows and listed buildings

What does a loose ridge tile on a Grimley house cost to put right?

Which?, in its November 2025 survey, gave £80 to £300 for a new ridge tile, excluding VAT. That is a national range, not our price. The cost on a Grimley house depends on how many tiles have lost their bed, how high the ridge sits and what the scaffold needs. The survey photographs the capping, and you receive one total in writing once the visit is done. Several loose tiles in a row point to a bed that has failed along its length.

What U-value must a replacement roof window reach on a Grimley house?

Under AD L 2021 Table 4.2, a roof window should achieve 1.4 or WER Band B at the least. A rooflight takes 2.2; the roof window takes the window figure. AD L 2026 Table 3.2 repeats those values from 24 March 2027. We confirm which kind of unit is in the opening before the new one is ordered, because ordering the wrong kind is an expensive mistake.

Does a loft room under a Grimley roof need a protected stair?

Not necessarily. Approved Document B for England, paragraph 2.5, gives two routes, a protected stairway or an alternative escape route, and paragraph 2.23 allows a sprinkler option. Escape windows under paragraph 2.10 serve only storeys within 4.5 m of the ground. Building control, whether the council's or a registered approver's, decides which arrangement suits the house, so raise the question before a loft is drawn up and not after.

Which consent route applies to a Grade II* church roof like St Bartholomew's in Grimley?

St Bartholomew's, an Anglican church with a monthly communion, has its roof work settled under faculty jurisdiction while it stays in use. If worship there ended, listed building consent from Malvern Hills District Council would apply instead. Unitarian and Quaker buildings never had the exemption and need that consent too, so the route for any church roof is confirmed with the diocese before work is planned.

How do I check the canal conservation area near Grimley against my address?

The Bevere and Droitwich Canal areas are Wychavon District Council's, so a question about either boundary goes to Wychavon. For a Grimley address, ask Malvern Hills District Council, which keeps the list for the parish, because an area close to the village does not tell you whether your own house is inside one. The council has no Article 4(2) Directions in force at present, by its own statement. For a new opening, the English rules are set out in our guide to roof window planning.

As the homeowner, do I carry CDM duties on a Grimley re-roof?

CDM regulation 7 moves a domestic client's duties on to the contractor where there is a single contractor. Where more than one contractor works on site, the principal contractor takes them on, unless a written agreement passes them to the principal designer. Each project, large or small, must have a construction phase plan, and regulation 15(5) makes the sole contractor draw it up. Ask who holds the duties and get that in writing.

Arrange a ridge-first survey in Grimley

Describe the ridge or window that worries you and add a picture, even a blurred one. We will agree a day to look.

10-year workmanship guarantee, in writing