01432 610152 Get a quote Call 01432 610152

Roofers in Clydach

Clydach sits inside the Bannau Brycheiniog National Park, and its roofs follow Welsh rules.

Clydach is 29.7 road miles south-west of Hereford, about 44 minutes away. We photograph each fault, then send one written total.

Get a free quoteCall 01432 610152

A Clydach roof inside the National Park

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Welsh rules for a re-roofA Welsh re-roof brings Building Regulations into play, so the survey starts there.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Roof windows and dormersInside the Park, planning permission covers any fresh roof window or dormer.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed bridges and a viaductSmart's Bridge is Grade II*, and the Nant Dyar Railway Viaduct is Grade II.

Clydach and the roads from Hereford

Clydach on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Clydach roofs, read inside the Park

Ridge, roof window and eaves: the Clydach survey in three callouts

A Clydach roof is surveyed crest first: the ridge and the Welsh re-roofing rules, then the roof windows that National Park status places under planning control, and last the eaves, where scaffold licences and wildlife law meet.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge and rules; 2 Roof windows; 3 Eaves and scaffold.

Fig. 1 The drawn roof in section, with three Clydach callouts numbered from the ridge down.

Callout 1 of 3

The ridge, and what a Welsh re-roof sets off

We start on the ridge, the line at the top edge where the slopes join. Capping tiles run along it, bedded in mortar or held by the clips and screws of a dry-fix system, and nothing seen from the lane tells you which kind of job has lasted. So we climb up, press each capping tile with a flat hand and photograph any that rock or have lost their pointing, and you receive a picture of each one. Where the ridge turns down a hip, the sloping outer corner of the roof, the check is repeated, and we look at the tile that closes each end, because a loose end tile lets the wind lift the line above it.

Marley, the tile maker, states that "Installing to BS 5534 isn't required by law", and adds that after the 2015 amendments "mortar could no longer be relied upon as the only means of securing the roof covering". The current British Standard for slating and tiling is BS 5534:2014+A2:2018, and BS 8612 covers dry-fix ridge systems. Mortar is not banned. When we rebed a Clydach ridge, every capping tile is screwed or clipped as well.

A larger job runs on Welsh rules, which differ from England's. The Welsh Government's guidance on re-roofing says: "In most situations, this work will need Building Regulations approval." Its roof page adds that repairs or re-covering of "less than 25 per cent of the area of a pitch or flat roof" will not normally need an application. Swapping slate for tiles is the Welsh Government's own example of a change where approval "is likely to be needed", since the new covering can be heavier or lighter than the one it replaces. Planning is a separate matter: a Welsh re-roof normally stays inside permitted development when the new covering looks like the old so far as practicable, and in the National Park we would put any change of look to the National Park Authority first.

Insulation follows a re-cover. The Welsh Approved Document L asks a renovated roof to reach 0.16 W/m²K, with 0.35 W/m²K as the worst acceptable figure where 0.16 cannot be done. Our roof repairs page covers a ridge that only needs rebedding, and our roof replacement page covers a full re-cover.

Checked along a Clydach ridge

  • Capping tiles that rock under a hand
  • Mortar joints that have opened or crumbled
  • A mechanical fixing on every capping tile
  • The tile finishing each hip and gable end

Press the capping tiles by hand before you judge a ridge by eye.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Roof windows and dormers in the National Park

Moving down the slope, the survey reaches the roof window, the glazed unit set into the covering so that daylight reaches a loft room. Fitting one means cutting through rafters, framing the hole with short timbers called trimmers and wrapping the unit in a flashing kit that carries rain round the frame. A leak at a roof window shows at that kit, so we check the flashing, the apron below the glass and the felt or underlay (the membrane beneath the covering) where it meets the frame.

Clydach lies inside the Bannau Brycheiniog National Park, designated in 1955, so the National Park Authority is the planning authority for the village. Land inside a National Park is called article 1(5) land in Wales, and on it a dormer or a fresh roof window falls outside permitted development: planning permission is needed. Put the question to the National Park Authority before you commission either. Our planning guide for roof windows goes through the detail.

Building Regulations are a second, separate question. For a Clydach roof, building control stays with Monmouthshire County Council, and a registered building control approver is the alternative. The Welsh Approved Document L sets a roof built new onto an existing house at 0.13 W/m²K (Table 4.1). A roof window is held to 1.4 or Window Energy Rating Band B, written WER Band B. A rooflight is allowed 2.2, so that 2.2 figure belongs to rooflights alone.

A loft room behind the window brings fire safety in too. Welsh Approved Document B, paragraph 3.6, gives a house two options: a protected stairway, or a top storey cut off from the floors below with an escape route of its own. That choice is best made before the window is ordered. The unit matters to the roof as much as to the room: a bigger opening means more rafters cut and a larger flashing kit, and our skylights page explains what a like-for-like swap involves. Before the new unit goes in, we photograph the opening so you can see the timbers behind it.

Welsh Part L figures for roof work

New roof, existing house
0.13 W/m²K (Table 4.1)
Roof window
1.4, or WER Band B
Rooflight
2.2 W/m²K
Renovated roof
0.16, not worse than 0.35 (Table 11.1)

The flashing kit, not the glass, decides whether a roof window stays dry.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

At the eaves: gutters, scaffold and wildlife

The survey ends at the eaves, where the roof overhangs the wall and the gutter hangs. Two parts do the work. The fascia is the board the gutter hangs from; the soffit is the underside panel of the overhang. We test both for staining and softness, then look at the lowest course of covering, because a slipped course sends rain down behind the gutter and into the head of the wall. Brett Martin's advice on fitting gutter runs is a fall of "1mm for every 600mm" towards the outlet, so a run that sags or sits dead level shows up as standing water in the run.

Gutters in cast iron, aluminium or uPVC each fail in their own way. A cast-iron joint weeps where the bolt and putty have perished, an aluminium run sags between its brackets, and a plastic one splits at a corner or a union. We note the material, count the brackets that have pulled away and check that every downpipe discharges clear of the wall. A gutter is judged only after it is cleared, since a blocked run can look worse than it is.

Eaves work is when a scaffold goes up. A scaffold on the footway or the carriageway needs a licence under section 169 of the Highways Act 1980, and we arrange the licence with our scaffolder. For the fee, the notice period and the trunk-road position, read the answers further down the page. The quote we write carries the scaffold, so any quote you compare should say whether it covers VAT and scaffold too.

The eaves are also where a roof meets wildlife law. Bats can use the gaps behind a fascia or under the lowest course, and birds can nest in a soffit. The last question below gives the law for each in Wales. If a bat, a trail of droppings or a live nest turns up, work at that spot stops while we take advice, and we photograph what we found for you. When the gutters are done, the site is left tidy and the waste goes with us.

Gutters and soffits are where a Clydach roof meets the wall, the licence office and the bats.

The eaves, sound and tired

SoundFascia dry, gutter falling to the outlet, lowest course tight
Needs workStained fascia, sagging gutter, slipped lowest course, gaps at the soffit

Clydach roofs: Welsh rules, the Park and the eaves

Can I re-roof my Clydach home in a different material?

Check first. The Welsh Government treats a change to a different covering as likely to need Building Regulations approval, and it gives slate to tiles as its example, because the new covering may be heavier or lighter than the old. For planning, the new covering should look like the old so far as practicable, and a home inside the National Park should be put to the National Park Authority before any change of look is made.

Who handles building control for a roof in Clydach?

Monmouthshire County Council Building Control, based at County Hall in Usk, handles building control for a Clydach roof, and a registered building control approver is the alternative. The National Park Authority is the planning authority only and replaces neither. Before a re-roof starts we confirm which body your job falls under, because the Welsh Government says re-roofing needs approval in most situations, while a repair below its 25 per cent area figure may need none.

How is a scaffold licence arranged for a Clydach roof?

We arrange the licence with our scaffolder; a scaffold on the footway or the road needs one under section 169 of the Highways Act 1980. Monmouthshire County Council's form lists an administration fee of £108, £27 per week to extend, and at least 5 working days before erection. For trunk roads and motorways, the Welsh Government acts through its trunk road agents. Our written quote carries the scaffold, so ask any other firm whether its price does.

What if my Clydach roof is on a listed building?

Consent comes first. Since 4 November 2024, sections 88 and 89 of the Historic Environment (Wales) Act 2023 require listed building consent where a job would change a listed building's special character. Permitted development rights survive on a listed house, but the consent is needed alongside them. Cadw holds the list, and Smart's Bridge, for one, is Grade II* (record 23813, designated 27 July 2000). Ask the National Park Authority before any slate or tile comes off.

Is my address in a Clydach conservation area?

Check the National Park Authority's own conservation area list, since the Authority is the planning authority for Clydach and only it can say where a boundary runs. Conservation areas are designated under Part 4 of the Historic Environment (Wales) Act 2023, and a new roof window is not permitted development inside one. Check whether an Article 4 direction applies with Bannau Brycheiniog National Park Authority as well. The Welsh Government notes that such directions are most common in conservation areas.

Do bats and nesting birds change how a Clydach roof is repaired?

They can. Natural Resources Wales issues the licences for work that affects bats in Wales. Under section 9(4) of the Wildlife and Countryside Act 1981, disturbing a bat in its shelter, or blocking access to it, is an offence when done intentionally or recklessly, and regulation 43 of the Habitats Regulations covers harm to the spots bats use to breed or shelter, intent or not. Section 1 of the 1981 Act bars intentionally taking, damaging or destroying an occupied nest, or one being built.

A roof survey in Clydach, Park rules included

Describe what you can spot from the ground, in a photo or a few lines. We will arrange the survey and send a written total.

10-year workmanship guarantee, in writing