In brief
In Wales the Building Safety Regulator (BSR) is the main regulatory body for the building control profession, working on behalf of the Welsh Ministers, says the Welsh Government. Private approvers and inspectors answer to the BSR. Local authority building control does not: councils are regulated by the Welsh Ministers directly. New Welsh building regulations came into force on 1 July 2026.
Two regulators for two kinds of building control
Building control in Wales is done by a local authority's service or by a private-sector business. Each kind has a different overseer, and the Welsh Government is plain about the split on its page on the building control profession.
It says the BSR "serves as the main regulatory body for the building control profession in Wales, operating on behalf of the Welsh Ministers". Registered building inspectors and registered building control approvers both fall under that remit. Councils do not. On this point the Welsh Government is exact: "The BSR does not regulate local authority building control in Wales."
| Body | Overseen by |
|---|---|
| Local authority building control | The Welsh Ministers |
| Registered building control approver | The BSR, for the Welsh Ministers |
| Registered building inspector | The BSR, for the Welsh Ministers |
So a householder should not expect the BSR to take up a complaint about a council's own team, and should not expect the council to oversee a private firm. Which body to approach depends on who carried out the check, and the certificate says which that was.
How the Welsh rules came in, step by step
The Welsh arrangements built up over a short period, through circulars and regulations from the Welsh Government. The dates below come from those documents.
- 3 November 2023: circular WGC 003/2023 introduced standards, codes and rules that the building control profession must abide by from April 2024.
- 25 January 2024: circular WGC 001/2024 designated the registration and oversight functions to the BSR.
- 1 January 2025: the Building (Registered Building Control Approvers etc.) (Wales) Regulations 2024 came into force, as circular WGC 012/2024 records.
- 1 July 2026: new building regulations came into force in Wales.
A private-sector business that wants to do building control work in Wales under the Building Act 1984 must apply to register with the BSR, and the Welsh Government's page on registering as an approver says so. That register is how a householder checks that a private firm is entitled to sign off the work.
Our wider page on what a registered building control approver is explains the register for both sides of the border. For the council route, ask the council in whose area the house stands.
What changed for applications from 1 July 2026
The Welsh Government says new building regulations came into force on 1 July 2026 that, among other provisions, "introduce reform of building control processes particularly for higher-risk building work". Two changes in its transitional guidance reach ordinary homes:
- For non-higher-risk building work, applications for building control replace the old process of depositing plans.
- An approval lapses automatically once three years have passed.
The second point matters for roof jobs that are agreed and then delayed. An approval that has lapsed cannot be relied on, so a project that stalls for years needs its approval checked before work resumes.
None of this changes the standards a roof is judged by, which sit in the Building Regulations and their approved documents. It changes the paperwork route, and who sends it.
In Monmouthshire the council runs its own building control service. For Powys, the position is the council's building control service or a registered building control approver, and either can say which route applies to your address. Inside the Bannau Brycheiniog National Park, planning sits with the Park Authority, and building control stays with the council.
What this means on a Welsh roof
The Welsh Government's page on re-roofing states: "In most situations, this work will need Building Regulations approval." Its roof page sets a second test, and the Welsh Government says work on "less than 25 per cent of the area of a pitch or flat roof" will not normally call for an application, while "more than 25 per cent of the roof area" brings the roof insulation into play. A heavier replacement in place of slate is likely to need approval for weight, fire safety and energy reasons.
Three Welsh figures follow from that:
- Welsh Approved Document A calls a loading increase above 15% a significant change.
- Table 4.1 of the Welsh Approved Document L sets 0.13 W/(m²·K) where a house is given a new roof.
- Table 11.1 asks a renovated roof to reach 0.16, and no worse than 0.35 where 0.16 is not feasible.
The next edition of that energy document takes effect on 4 March 2027, so a job planned around then should be checked against the version in force when work begins. Before we start we check with the council's building control team. For the quote, read what a written roof quote covers, and our roofing across Hereford and the Welsh border.