In brief
A written roof quote should name the address, state one total price, and say what is being done to which part of the roof. It should say whether VAT and scaffold are in that price, what the new materials are, who deals with any approval the job needs, and that the waste is taken away. A price quoted by phone, with nobody yet on site, covers none of this.
One total price, set after a survey
A quote is only worth having once someone has been up and looked. Roofs hide their faults at the ridge, at the verges and behind the chimney, so a price given from the street, or over the phone, is a guess. What you want is a single total on paper, issued after the survey, with the job described beside it.
Read the total for what it does not say as well as what it does. Look for these in the quote:
- whether VAT is in the total, since a figure that leaves it out is a different number
- whether the scaffold is included
- the job it relates to, by address and by roof area
- how long the price holds
Third-party ranges show how wide the answers can be, because roofs differ. Which?, in a November 2025 survey, gave £7,000 to £21,000 excluding VAT to replace a whole roof on a three-bedroom house. HomeBuilding (30 September 2025) gave £10,000 to £15,000 for plain concrete tiles on a 65 m² semi, and said Welsh slate on the same property might reach £18,000. Those are typical UK figures, not our prices, and they show why a written total for your own roof is the only number that counts.
Scope: what is being done, and to which part
The scope is the half of the quote that stops arguments. It describes the work in words you could check from the ground. A line such as "repair roof" says nothing, and a good scope names each part of the roof it touches.
- Which slopes: front, rear, side or the whole roof.
- The covering: slate, clay tile, concrete tile or another material, with size and colour, matched to the house.
- The ridge, hips, verges and valleys, and whether they are rebedded, refixed or replaced.
- Flashings and leadwork, and the chimney work where there is a stack.
- Underlay and battens, and whether sound ones are kept.
It should also say what is left alone, such as the gutters or the fascias, so a gap you expected to be filled is not a surprise later. If the roof is of a type that needs particular handling, such as stone tiles or an old slate roof, the scope should say how the existing material is reused or matched.
Where the scope depends on what is found once slates are lifted, the quote should say so and say how a change will be agreed, in writing, before any extra work starts.
Access, the scaffold and the waste
This is the part people forget to ask about. Access means how the roof is reached, and on a house that can mean scaffold. The quote should say that it is included, and, if it will occupy the footway or carriageway, that a licence applies. Our part is simple: we arrange the licence with our scaffolder, and the council's notice period can set the start date. Our page on scaffolding on the road outside your house sets out each council's terms.
Waste is the other half. The quote should say that old tiles, slates, battens and underlay are carried off, and that you are left with a clear garden, clean paths and empty gutters. Where a skip goes is worth agreeing too, because one on the highway needs permission of its own.
An older garage or outbuilding roof needs a sentence of its own in the scope. If its sheets are asbestos cement, the quote should say how they come off and where they go, because HSE treats that material with care. Ask for that plan before a date is set.
What each country requires of a re-roof
A quote should also say who deals with any approval the job needs. The tests differ in England and in Wales.
| Point | England | Wales |
|---|---|---|
| Re-roofing | Planning Portal: normally no application if less than 25 per cent of the building envelope and less than 50 per cent of the roof is affected | Welsh Government: in most situations, approval is needed |
| Heavier covering | Planning Portal: 15 per cent or more heavier needs approval | Welsh AD A: more than 15% is a significant change |
Each of these is a Building Regulations matter, and neither is a planning one. Ask the firm who contacts building control, and whether the cost of any approval sits inside the total price. A reply that is vague about this is a sign to ask again before you sign.
Once you sign at home, you have 14 days to cancel, and work starts sooner only if you ask in writing. Our roofing across Hereford and the border follows the same order. If something goes wrong later, see where to turn when you are unhappy with roof work.
