Herefordshire Council runs a building control team from Plough Lane in Hereford, and a registered private approver can carry out the same check instead.

In brief

Building control in Herefordshire is done by Herefordshire Council Building Control, run by the council itself from Plough Lane, Hereford, or by a registered building control approver. The building control telephone line is 01432 261938. For a roof, the test in England comes from the Planning Portal: the two limits are 25 per cent of the building envelope and half the roof, and its wording is "less than".

Herefordshire Council Building Control

The team sits at Plough Lane, Hereford HR4 0LE, and the council runs it directly. Herefordshire Council Building Control is on 01432 261938, and the building control email is bce@herefordshire.gov.uk. Use those two when your question is about a roof, since a general council line will only pass you on.

The council's page on choosing an application lists the domestic projects that "may require Buildings Regulations consent", in its own spelling: extensions, garage conversions, loft conversions and cellar conversions. Re-roofing is not named there, so the Planning Portal tests below are what a roofer works to, and the council is the place to confirm them for your address.

When you call, have the address, the age and type of the house, and a short description of the work. That might be a strip and re-cover, a heavier covering, a flat roof, a chimney breast coming out or a new roof window. A building control officer can then say whether an application is needed, and what drawings or details it should carry. Ask for the answer by email, so you hold it in writing before the job is priced.

When a roof job needs approval in Herefordshire

Herefordshire is in England, so the Planning Portal sets the test. Three points decide most roof jobs:

  • The first test is about extent: keep the work below 25 per cent of the total building envelope and below 50 per cent of the roof area. Inside both limits, normally nothing needs to be applied for.
  • The second test is weight: the Planning Portal says approval follows when a covering makes the roof 15 per cent or more heavier. Approved Document A, paragraph 4.4, puts its trigger as a roof loading rise of "more than 15%".
  • Building Regulations approval "will always apply when removing chimney breasts", according to the Planning Portal.

Energy rules sit alongside. Until 24 March 2027, AD L 2021 Tables 4.2 and 4.3 apply. Table 4.2 sets 0.15 when an existing home gets a new roof, and in Table 4.3 a renovated roof has 0.35 as its threshold and 0.16 as the improved figure. From that March date, AD L 2026 Tables 3.2 and 3.3 take over.

Flats have no householder permitted development rights. A conservatory roof that is replaced must comply with the regulations as well, so ask the council before you order one.

The private route in England

Building control in England can also be done by a private-sector business. GOV.UK states that businesses wanting to do this work must apply to register with the Building Safety Regulator, and the rules for the register took effect on 6 April 2024. Private firms offered the service before that date. Only the register is new.

So a Herefordshire householder has a choice of two bodies. One is the council's team. The other is a registered building control approver, and our page on what a registered building control approver is explains the register and how to check a firm.

Whichever body checks the job, the Building Regulations applied to your roof are the same. The differences lie in who you pay, who visits the site and which name is printed on the certificate at the end.

File that certificate with your house papers. It records that the roof was checked, and it saves a search later. Get the fee in writing from the body you appoint, along with the stages at which it will inspect, such as before the covering goes on and once the work is complete.

How we handle approval on a Herefordshire roof

We work to the Planning Portal's test for a Herefordshire address, and we ask the council's building control team when a job sits near either limit. You are told in advance whether your roof needs an application, and who will make it.

Our survey begins on the skyline, and every fault is photographed. Those photographs answer building control when it asks how the roof was laid and how much of it is being replaced, and what it is made of. Where the covering changes, for example from clay tile to a heavier product, we raise the weight question at the start, not halfway through the job.

Your quote arrives as one written total, and it names who deals with approval. See what a written roof quote covers for the full list. Our roofing across Hereford and the border includes this step wherever a job needs it, and what follows the survey is a call to the council, never a guess. If the council asks for a drawing or a method statement, we supply what the roof work needs and keep the copy with your quote.

Related questions

Does a roof repair in Herefordshire need Building Regulations approval?

A repair that affects under 25 per cent of the total building envelope and under 50 per cent of the roof area does not normally require an application, according to the Planning Portal. A heavier covering, a chimney breast removal or a new roof window changes the answer. Call Herefordshire Council Building Control on 01432 261938 when a job is close to the limits.

Can I use a private firm instead of Herefordshire Council?

Yes. Building control is done by the council or by a registered building control approver. Private-sector businesses doing this work must register with the Building Safety Regulator. Ask any firm for its registration, and for its fee and what that fee covers, in writing before you appoint it.