A slate keeps water out by overlapping, not by sealing. Rain runs down the face of each slate and onto the next one below, and the joints between neighbouring slates are covered by the slates above. Two numbers decide whether that works: the pitch of the slope, and the amount of overlap at each joint.
Pitch is the angle of the roof, measured in degrees from the horizontal. Headlap is the strip at the top of each slate, its head, that the slates two courses higher shield from the rain. A steep roof sheds water quickly and can manage with less overlap. A flatter one sheds it slowly, so its joints have to be better covered.
The sections below take the angle, the overlap, the BS 5534 example from the slate maker Cupa, a short worked calculation, the checks we make on site, and the approval rules by country. For the wider subject, see our slate roofing page.
Pitch: the angle that sets the limits
The pitch of a roof is its slope measured in degrees. A flat roof sits close to zero and a steep gable sits at a much larger angle. Every covering has to suit the angle it is laid at, because below a certain slope water can be driven back up the joints or can lie in them instead of draining.
That lowest pitch is the maker's figure for a named product, and it differs from one product to the next. Marley's published table of minimum pitches shows how wide the spread is, with product names behind the figures rather than regions:
| Marley product | Minimum pitch |
|---|---|
| Canterbury (clay) | 40 degrees |
| Lincoln pantile (clay) | 15 degrees |
| Plain (concrete) | 35 degrees |
| Edgemere (concrete) | 17.5 degrees |
The lesson from the table is that no single number serves every covering. For natural slate the figure depends on the length of the slate, the overlap and the exposure of the site, and the next sections set out Cupa's version. Marley tells readers to check the product data sheet before relying on its table, and the same discipline applies to slate: the data sheet for the slate in the box is the final word, not a general rule of thumb.
A pitch is also not always where the plan says it is. An old roof settles, rafters bow, and the angle at the ridge can differ from the angle at the eaves, so it is measured on site.
Headlap: the overlap that does the work
SPAB's note on roofs in the Marches calls Welsh slate and stone roofs "predominantly double-lapped". In a double-lapped roof, the head of each slate sits under the slates two courses higher, and that shielded strip is the headlap. The vertical joint between two slates side by side is covered by the slate above, so water has two layers to get through before it reaches the batten.
The overlap does three jobs:
- it covers the joints between slates in the course below
- it stops water that is blown or drawn upwards from reaching the battens
- it gives each slate a grip on the one beneath, so wind has less to lift
The principle that matters for design is simple. The flatter the slope, the slower the water runs off, and the further wind can push it up a joint, so a bigger headlap is needed. A steeper slope allows a smaller one. That is why a slate maker's data sheet ties the pitch, the exposure and the overlap together, and why none of the three can be changed without the others being looked at again.
Lifting a slate on a sound course is how we find the headlap on an existing roof. An older roof may have been laid to a different lap from the one a current data sheet would give, and knowing what is there decides what a repair can match and what a re-slate has to correct.
The BS 5534 example, in Cupa's words
BS 5534:2014+A2:2018 is the edition now in force for slating and tiling. Cupa, a slate maker, reports what it indicates for slate: a lowest pitch of 20 degrees, "in the case of a project situated in an area with moderate exposure and with a slate 500mm long and a 115mm overlap".
Every condition in that sentence matters:
- a pitch of 20 degrees
- an area of moderate exposure
- a slate 500mm long
- an overlap of 115mm
Change one and the example no longer applies as written. A shorter slate, a smaller overlap or a more exposed site needs its own data sheet, and a pitch under 20 degrees sits outside the example altogether.
Marley says "Installing to BS 5534 isn't required by law". The standard lays out a method that building control and manufacturers recognise, which is a reason to follow it, though it is not a statute. A roof laid to it is easier to defend at inspection, and the data sheet for the slate in use fills in the detail the standard leaves open.
The exposure of a site is taken from the data sheet for the address, not guessed from memory or from the look of the hillside, and two roofs at the same pitch can call for different laps because their sites differ. We keep one lap and one fixing method across a whole slope, because one weak course can let a slope down.
Working the example through
With a 500mm slate and a 115mm overlap, the spacing of the battens follows from a standard slating formula: the slate length, less the headlap, divided by two. The spacing between battens is called the gauge, and it is the distance from one course to the next measured up the slope.
Side joints matter as well. Slates are laid so that the vertical joint in one course never lines up with the joint in the course below, and the slates above then cover each of those joints. A roof that breaks that bond, with joints stacked one above another, gives water a straight path down the slope.
| Item | Figure |
|---|---|
| Slate length | 500mm |
| Headlap | 115mm |
| Gauge (500 less 115, halved) | 192.5mm |
| Lowest pitch in the example | 20 degrees |
The gauge is our arithmetic, not a figure published by Cupa. It shows why the headlap and the batten spacing are linked: the larger the lap, the closer the battens, and the more slates the slope takes. A roof laid at a wider gauge has less lap than the example, and its pitch limit would be read from the data sheet again.
On a real roof the slates may not be a perfect 500mm, and the ridge, eaves and verges need cut courses, so the gauge is set out across the slope from the eaves and adjusted by the roofer until the top course lands properly. We measure the existing gauge and headlap on site before any slate is ordered, because the count of slates in the order depends on the spacing.
What we measure on site
A pitch quoted on a plan is a drawing. The slope on site is what counts, and an old roof can have sagged between its walls. We take the pitch at more than one point with an angle finder, and photograph the reading.
The survey on a slate slope covers:
- the pitch, in degrees, on each slope and in more than one place
- the length and condition of the existing slates
- the headlap, found by lifting a slate on a sound course
- the batten gauge and the batten condition
- the exposure of the site, set against the data sheet
Hook fixings come into the same check. Cupa rules out hook fixings below 25 degrees, so a roof between 20 and 25 degrees can still be slated, with nails. Our guide to nails or hooks for slates sets out the two methods.
The survey also checks that the roof structure can carry the work. The rafters and battens that hold the headlap have to be straight enough for the courses to lie flat, and where the timber has moved, the lap can open at one end of a course and close at the other.
If the survey shows a pitch under the slate's figure, we explain that and look at the alternatives with you before anything is ordered. One written total price follows, and it names the slate, the lap and the fixing that the pitch allows. The photographs of the readings sit alongside it, so that the numbers behind the price can be checked by anyone you choose to show them to. A second opinion is welcome, because the readings are the same whoever takes them.
Changing a covering: England and Wales
Re-slating to a new specification, or swapping the covering altogether, brings the Building Regulations into play, and the two countries word their rules differently:
- England: the Planning Portal sets two tests, "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof", and asks for approval where a new covering adds weight "by 15 per cent or more".
- Wales: the Welsh Government says of re-roofing, "In most situations, this work will need Building Regulations approval", and adds that re-covering "should also include for improving the thermal insulation properties of the roof".
A low pitch does not settle the covering on its own, and a change of covering is not something to decide from a data sheet. We put the specification to the building control service for the address, either the council or a registered building control approver, before the work is priced.
The short answer on the lowest pitch for natural slate gives the same figures in brief, and our guide to slate repair shows how the headlap is checked when only a few slates are involved.
Where a roof sits below the figure for its slate, the conversation with you covers the options in plain terms, with the data sheet and the photographs of the pitch readings in front of both of us. Some options stay with the same slate and change the lap; others change the covering, and each has its own rules and its own consents.