Stand at the end of a terrace and the roofs read as a single line: one ridge, one run of gutter, a row of stacks. Each house owns only its own length of that line, and the work on one slope ends at a boundary you cannot see from the street. Re-roofing a terraced house is therefore a job in two halves. One half is the slope itself, which is yours. The other half is the edge, where your roof meets a neighbour's wall, ridge or chimney.
The edge is where the questions arise. How is the new covering finished against the house next door? Whose lead is it? Does a chimney breast on the party wall come into the plan? Does a notice have to go to the neighbour first? And how does a scaffold fit along a terrace front?
We survey from the loft and the skyline, photograph the junctions and put the whole job in one written figure. What follows covers the construction, the junctions, the Party Wall etc. Act 1996, how approval differs between England and Wales, and the practical side of working beside occupied houses. The wider service is described under roof replacement.
How a terraced roof is put together
Look along a terrace from the street and you see the shared parts first. The eaves and gutter can run straight past the boundary, the ridge may continue, and the stacks sit on the line between two houses. Inside the loft the structure becomes clearer. The wall between two houses rises as a party wall, and in the loft it may be carried up to the underside of the roof or stop at the ceiling joists.
These are the features we look at in the survey, and they set the shape of the job:
- whether the ridge runs on unbroken into the next house or steps at the boundary
- whether the party wall stops under the roof, rises to the rafters or shows above the covering
- whether the eaves and gutter are shared, or each house has its own
- where stacks sit, and which flues belong to which house
- whether a rear outrigger, the narrower wing running back from the main house, has its own valley
None of this is guesswork from the street. A terrace built in several phases can change from one house to the next, with different rafter sizes, different battens and a repair from some earlier decade on one length only. We photograph each junction from inside and outside so you can see what we are describing in your own house.
The slope, once stripped, is just a slope. The planning is all in the edges.
Where your slope meets the next house
Every junction on a terrace is a place where two owners' work comes together, and each has its own detail. An abutment is a wall that rises above your roof, such as a taller neighbour's gable, and it is sealed with a lead flashing dressed up the brickwork. Soakers are little lead sheets worked in with every course where roof meets wall. The cover flashing is the upper strip that shuts the joint over them.
| Junction | What we check | Who it touches |
|---|---|---|
| Ridge at the boundary | Capping, bedding and where the line stops or steps | Both houses |
| Party wall above the roof | Coping, pointing and the lead where slope meets wall | Both houses |
| Step in roof height | Abutment flashing, soakers, cover flashing | The lower roof |
| Shared gutter run | Joints, fall and brackets at the boundary | Both houses |
| Rear valley at an outrigger | Lining, cut tiles and the lead dressing | Your own roof |
Lead is the material that does most of this work. Royston Lead's brochure shows Code 4 sheet suiting soakers, flashings and pitched valleys, and MyJobQuote says correctly installed lead flashing "can last for over 80 years". That is a hedged range for flashing, not a promise of life.
The edge is also where a dispute can start if one owner replaces lead on the other's side without telling them. We keep to our own roof. If the plan means cutting a chase for a flashing in next door's masonry, that is a Party Wall etc. Act question, taken up two sections further on.
Shared stacks and the chimney breast inside
A stack on the line between two houses serves a flue on each side. From the roof we can see the pots, the flaunching (the mortar capping round the pots), the pointing and the lead dressed round the foot of the stack. We cannot tell from outside which house a flue serves or how it runs inside, so we look at both loft spaces where we can and mark the pots in the survey.
What matters for a re-roof is what the plan does to the stack:
- A re-cover that dresses new lead round the stack remains on your own roof.
- Repointing or reflaunching is work to the stack itself, which both houses rely on.
- Lowering the stack beneath roof level brings the breast inside into the plan.
Should the breast inside be removed, the two countries word the rule differently. In England, the Planning Portal says: "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." For a Welsh address, raise it with the council's building control service or a registered building control approver before anything is cut away.
Section 2(2)(g) of the Party Wall etc. Act 1996 covers taking out a chimney breast that juts from the wall. The same Act covers both countries, and it means the neighbour must know what is planned before the roof is opened above the shared wall.
Our guide to chimneys on a party wall goes through that side of the work in more detail.
What the Party Wall etc. Act asks of the owner
You, as the owner of the house wanting the work, serve the notice. The roofer does not, and neither does the neighbour. The Act's periods run from service, and the periods are minimums.
- Notice goes out at least two months ahead of any work on a party wall, for example removing a chimney breast or cutting a chase for a flashing in the neighbour's masonry (sections 2(2)(g), 2(2)(j) and 3(2)(a)).
- Serve it at least one month before a new wall goes on the boundary line (section 1(2)) or before digging close to a neighbouring building (section 6(5)).
- If the neighbour does not agree in writing within 14 days of the notice, section 5 treats them as having dissented, and a dispute then exists.
- A dispute leads to surveyors under section 10: both owners can agree a single surveyor, or each can appoint one.
Written consent from the adjoining owners and occupiers under section 3(3)(a) allows the work to go ahead without a dispute. GOV.UK warns that "You cannot assume that no response means they agree to the works."
Whether a particular re-roof engages the Act depends on whether it touches the shared structure. A re-cover that stays on your own slope leaves your neighbour's wall alone. Cutting a chase into that wall for a flashing does not. Where the plan reaches the shared wall, we note it in the survey and the written price, so the notice can be served in good time.
Party wall questions belong with a party wall surveyor, and building control does not rule on them. We describe the work in writing; you serve the notice.
Approval and planning: England, then Wales
Hereford and the rest of Herefordshire sit in England. Monmouthshire and Powys sit in Wales. A terrace on either side of the line is still a terrace, but the rules differ, so each one below carries its country.
- England, Building Regulations: the Planning Portal sets a test, and an application is normally unnecessary where "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" is affected. Approval is also needed where the new covering raises the roof's weight "by 15 per cent or more". Herefordshire Council Building Control is on 01432 261938, and its email is bce@herefordshire.gov.uk.
- Wales, Building Regulations: the Welsh Government says "In most situations, this work will need Building Regulations approval." Ask the council's building control service or a registered building control approver.
- England, planning: Class C of the 2015 order normally permits re-covering a house, and a conservation area does not remove Class C. An Article 4 direction can withdraw rights, so check with the council. Herefordshire has 64 conservation areas.
- Wales, planning: Class C condition C.2(a) holds the new covering to the appearance of the old one, so far as practicable.
Flats are different in England. A building divided into flats has no householder permitted development rights, so the owner of a flat in a converted terrace asks the council first.
For insulation, England's Approved Document L (2021 edition) sets 0.15 in Table 4.2 for a replacement roof structure and 0.16 once a retained roof is renovated (Table 4.3, with a threshold of 0.35). Wales sets 0.13 for the same in Table 4.1 and 0.16 for a renovated one, no worse than 0.35 (Table 11.1). The Planning Portal's terraced house page sets out the English test.
Scaffold, access and living next to a re-roof
A terrace has a long front and may have no side access. Scaffold along the front takes up footway or carriageway, which brings in section 169 of the Highways Act 1980. We arrange the licence with our scaffolder. Herefordshire Council's page lists £167 covering a maximum of 1 month and £123 for each further month; the application goes in at least 10 days before the scaffold is due. Our guide to scaffolding for a roof replacement sets out each council's rules.
The back of a terrace may be reached only through the house, a shared passage or a neighbour's garden. We ask early who owns the passage and whether the neighbours will allow materials through it.
A short note to the neighbours before the scaffold goes up helps:
- when the scaffold will go up and which week the strip-out starts
- whether we need access to a neighbour's loft to inspect the party wall from their side
- the hours we work, and a number to call about dust or a bin left across a drive
- a word about the stack, if one is shared
Stripping a roof raises dust and moves debris, and a terrace puts neighbours within a few metres of it. We clear the site as we go and take the waste away, and we ask you to tell us if a neighbour has a vulnerable occupant or a parked vehicle that needs moving.