Loft conversion escape

Re-Roofing with a loft conversion: what are the escape rules?

A loft conversion adds a storey, and fire escape becomes part of the approval. Each side of the border offers more than one way to meet it.

In brief

The roof job is tied to the fire design. In England, Approved Document B para 2.5 sets two ways to secure the way down once the top storey is higher than 4.5 m: an enclosed stair, or a second route out. In Wales, para 3.6 gives a matching pair: enclose the stair, or isolate the upper floor and give it an exit to itself. Building control must approve the scheme before the roof is opened.

England: paragraphs 2.5, 2.21 and 2.23

The English document is Approved Document B, the 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments. Paragraph 2.5 bites where a storey sits more than 4.5 m above ground level. In England, the dwelling should then have one of two things:

  • a protected stairway: the stair is enclosed in REI 30 fire resisting construction on every storey, and it ends at a final exit or at two ground level exits that are kept apart from each other
  • an alternative escape route: the top storey is cut off from the floors beneath by REI 30 construction and leaves by an exit that serves it alone

Paragraph 2.21 deals with a conversion that adds a storey higher than 4.5 m, and says the escape route has to be considered from top to bottom. Paragraph 2.23 gives England a further option for open-plan layouts: sprinklers over the open space, an REI 30 partition with an E 20 door between the ground storey and the floors above (so the loft room can reach a first storey escape window), and cooking enclosed. English rules therefore leave a choice of routes, and no single answer suits every house.

Wales: paragraphs 3.6 and 3.20

The Welsh document is Approved Document B volume 1, the 2006 edition incorporating 2010, 2016 and 2020 amendments, for use in Wales. In Wales, paragraph 3.6 lets a dwellinghouse either have a protected stairway, or have its top floor separated and given an alternative escape route. For the second choice, the top storey is walled off from the floors below with fire-resisting construction and given a way out to an exit that serves it alone.

Paragraph 3.20 is the loft conversion paragraph. In Wales, it warns that turning the loft of a two-storey house into a room will mean protecting the stairway with fire-resisting doors and partitions, where nothing may have been protected before. Paragraph 3.20 adds that an open-plan area may instead be covered by automatic fire suppression, paired with a partition and an E20 door that resist fire, access to a first-floor escape window, and the cooking area divided off by fire-resisting construction.

Read together, both countries offer a stair-protection route and a separated-top-storey route, and both offer a sprinkler or suppression alternative where the layout is open plan. The paragraph numbers differ, so quote the right set.

Escape windows: where they apply and how big they are

An escape window serves a storey low enough to reach by ladder or by dropping out of it. The two documents set the same clear opening, though in different paragraphs:

Escape window sizes in the two documents
PointEngland, para 2.10Wales, para 3.8
Openable areaAt least 0.33 m²At least 0.33 m²
Height and widthEach at least 450 mmEach at least 450 mm
Position of the openingLower edge at most 1100 mm above the floorLower edge at most 1100 mm above the floor

In England, escape windows are for storeys within 4.5 m of the ground, so a top storey above that height is handled by paragraph 2.5 and not by a window. Our page on whether a roof window can be an escape window takes the window question further, including the position of the sill. Both numbers matter: the clear opening is measured once the sash is open, and an opening that is wide enough but set too high still fails the third test.

Where the roof comes into it

The fire design belongs to whoever draws the conversion and to building control, which on both sides of the border means the council or a registered building control approver. Our part is the roof, and the roof has to fit the scheme that is approved. Opening the slope for a dormer or roof windows, re-covering around them and insulating the new rooms are all steps in the roof job.

Re-covering a roof over a loft room also brings the energy rules. In England, the target in Table 4.3 for a renovated roof is 0.16, with 0.35 as its threshold. In Wales, Table 11.1 also asks for 0.16 and tolerates 0.35 where that cannot be reached. Our page on insulation when replacing a roof covers the choices.

We survey first and photograph what is up there, and you get a single written price. If the conversion drawings are not yet approved, you are told before the roof is priced, because the escape route decides what has to be built. The main page on roof replacement shows how a job runs from the first visit.

Related questions

Can the loft have its own way out instead of protecting the stairs?

Both documents allow it. In England, paragraph 2.5 allows a top storey separated by fire resisting construction with a route to its own final exit. In Wales, paragraph 3.6 allows a separated top storey with an alternative escape route of its own. Building control must approve whichever scheme you choose.

Who checks the escape arrangements on a loft conversion?

Building control, which is the council or a registered building control approver. They examine the drawings before work starts and the building work as it goes on. We build the roof to the approved scheme and photograph each stage that is ours, which leaves a dated trail behind the work, kept for you.