Living through a re-roof

Staying at home while the roof is replaced: what the weeks look like

Many households stay put through a re-roof. We take the stages in turn, from approvals and scaffold to stripping and clear-up, so you know what each one means for the rooms underneath.

Horizon Roofing Hereford 9 min read

Replacing a roof is loud for a few days and untidy for a few more, yet a household can carry on living beneath it. The hard part is not knowing what is coming. Once the sequence is clear, the noise stops being a worry and becomes a timetable: paperwork first, then the scaffold, then the stripping, the new layers and the clear-up.

This page follows that sequence from the owner's side of the ceiling. It covers the approvals that come first in England and in Wales, the checks for asbestos in an older house, the scaffold licence when the poles stand on the pavement, what goes on inside while the slope is open, and the rights you hold on the contract. We name no number of weeks, since how long a job runs depends on the roof and the weather, and our guide to how long a roof replacement takes deals with that.

It belongs to our roof replacement service. For the order of work on the roof itself, see a roof replacement, stage by stage, and for the access side, scaffolding for a roof replacement.

Before the first day: approvals and the asbestos question

A re-roof does not just start. Approval comes first, and the rule differs by country.

  • In England, the Planning Portal's rule of thumb puts the no-application line, normally, below 25 per cent of the building envelope and below 50 per cent of the roof. A whole new covering sits far above that, so building control is involved.
  • In Wales, the Welsh Government states that re-roofing "will need Building Regulations approval" in most situations.
  • In England, a heavier covering, at 15 per cent or more by the Planning Portal's measure, also calls for approval and a look at the structure.
  • In Wales, Class C.2(a) of the 1995 Order asks new materials to resemble the old so far as practicable, which matters for a switch from slate to tile.

Building control means the council's building control team or a registered building control approver. We make the approach for you and note the inspection stages, so you know when a visit is due.

HSE advises owners to treat a pre-2000 building, new or refurbished then, as holding asbestos. A roof of that age may have asbestos cement sheets on a garage or extension, or insulating board in the soffits. A survey comes first where a material is in doubt, because downing tools on the day costs far more than a sample taken ahead of time.

None of this needs you out of the house. It simply has to be settled before the scaffold goes up.

Scaffold week: the poles, the pavement and the licence

The scaffold is the first thing the street notices. It carries the crew, the stacked materials and a safe route up and down, and it stays for the length of the job. It also gives you a rough clock: when the poles come down, the roof work is done. Because the poles stay up for the whole job, the licence runs for its length, which is why the fee unit matters.

If the scaffold footing lies on public land beside the house, a licence is needed under section 169 of the Highways Act 1980, and the council expects notice. We arrange the licence with our scaffolder. Each council sets its fee in a unit of its own, so the figures here are not ranked against one another.

Highway scaffold licences: four councils, four units
CouncilNotice wantedFee in its own unit
Herefordshire10 days or more£167 for one licence, a maximum period of 1 month; £123 per month for extensions
GloucestershireNot under twelve calendar days£145 for 28 days at least, plus £36 per 7 days after that
ShropshireNot under ten working days£200, with no period stated
Monmouthshire5 working days or more£108 administration fee, then £27 per week to extend

In Worcestershire, the county council charges £85 per week and £65 for each later week, and Worcestershire County Council's page makes the contracted company the applicant, since that company is required to apply. A Powys address goes to the council directly for the fee and the notice.

For the household, the effects are plain. Parking bays outside may be suspended, the pavement may narrow, and the front door may need a protected walkway. Tell the neighbours before the poles arrive.

Stripping day: noise, dust and the open roof

This is the stage that worries people, and it is the loudest. The old covering comes off in sections, battens are pulled and debris is lowered by chute or hoist rather than thrown. Expect thumping, scraping and the occasional shout between roof and ground. Inside, ceilings under the slope being stripped hum with vibration, and fine dust shakes down from the loft.

Before stripping starts, a few jobs are worth doing:

  • take pictures and mirrors off walls under the slope being stripped
  • cover furniture and beds in the top rooms with dust sheets
  • clear the loft of anything you would hate to see dusty, or tell us what is up there
  • move cars and bins out from below the working area
  • mention pets, a baby that naps in the afternoon, or someone working from home

Older roofs hold decades of dust, some of it lime from the torching, the mortar pointed between the battens. It is gritty and finds its way everywhere. Shutting the loft hatch and the landing doors, with the edges taped, changes what reaches the bedrooms.

If something unexpected turns up, such as a board that might be asbestos, work on that area stops until it has been identified. That costs a little time and protects your family, which is the right trade.

Noise peaks on the days the old covering comes off. Afterwards the sound changes from banging to the steady tap of nails and the slide of tiles being laid.

Living in the house while the slope is open

On a re-roof the slope is never left wide open overnight. The work is planned in sections that can be made weathertight by the end of each day, with underlay and a tarpaulin or cover over whatever has been uncovered. Fresh underlay then gives the loft a roof of sorts while battens and tiles follow, and the crew checks the edges and the laps before leaving the site for the night.

That is the principle. A sudden heavy shower mid-afternoon can still catch a section half-finished, so a sheet and a crew ready to cover it are part of the plan. If you see rain dropping onto the loft floor, tell us at once and move belongings clear.

Everyday life adjusts more than it stops:

  • bathrooms, kitchens and the main living rooms are mostly unaffected by work overhead
  • rooms directly under the working slope are the ones to avoid in the middle of the day
  • children and pets are best kept off the garden and drive beneath the scaffold
  • windows on the working side stay shut, because roof dust and tile fragments drop outside them
  • power and heating stay on, with the loft tank and pipes protected from the weather

If someone at home needs quiet, such as a night-shift worker, a newborn or a person who is unwell, tell us at the survey. No roof can be made silent, but the loudest parts can be planned for hours that suit you.

What changes room by room

Where you feel the work depends on how the house is built. A hipped bungalow, a Victorian terrace with a rear outshut and a timber-framed cottage under a stone-tiled roof each live differently through the same stages.

Top-floor bedrooms and landings take the brunt. Dust comes down around loft hatches and light fittings, and the sound of work on the rafters carries straight through the ceiling. Moving into a back bedroom for a few days, or taking a mattress downstairs, is a common answer, and you will be told in advance which days are the noisiest.

Downstairs, the main change is the scaffold. Poles and boards cut daylight from the windows, and passing workers may cross the glass. Curtains on that side stay drawn during working hours. A porch or bay roof is treated as its own small job and is covered in the same way.

  • Flat extensions are re-covered on their own timetable, which can be the shortest of the stages.
  • Dormers and chimney stacks are protected while the slope round them is open, and the lead at their base is replaced with the roof.
  • The loft hatch is checked at the end, to make sure it opens and closes properly.

If anyone in the household has a health condition that dust or noise could aggravate, tell us when the survey is done. It affects how we plan the stripping and the order of the slopes, and we will take it into account in the programme. It is easier to rearrange a day on paper than to find out on the scaffold.

Paperwork, your rights and the last day

When the covering is on, the scaffold goes and the site is cleared. You should then hold the building control completion paperwork and the written price you agreed. Ask for the inspection sign-off, because a buyer or surveyor may want it years from now, so file it with the deeds and any certificates.

On your rights, if you sign at your own front door after the survey, you get a 14-day cancellation period, because it counts as an off-premises contract. To start inside that window, you must ask in writing. An urgent make-safe visit that you request falls outside cancellation, under regulation 28(1)(e) of the Consumer Contracts Regulations 2013, but a planned re-roof does not.

Costs deserve perspective. Which? (November 2025 survey, ex VAT) found whole-roof replacement on a typical three-bed house running from £7,000 to £21,000. HomeBuilding's September 2025 example, a 65 m² semi in plain concrete tiles, runs from £10,000 to £15,000, and for Welsh slate the same house might reach £18,000. Those are third-party ranges, never our quote, which is a written total set once the survey is done.

Citizens Advice runs a consumer helpline on 0808 223 1133, with a Welsh-speaking adviser on 0808 223 1144.

  • On the last day we check gutters and drives for stray fragments.
  • The old covering and the other waste go with us.
  • The house is left tidy, with the loft hatch free and the garden clear.

Living through a re-roof: your questions

Do we need to move out while the old covering is stripped?

You should not need to. Work is planned in sections so each slope is covered by the end of the day, and the main living areas are not affected. The rooms directly under the working slope are the noisy, dusty ones, so we suggest moving beds and valuables out of them. Tell us before the start if anyone needs quiet.

Does the scaffold need a licence on my street?

A footing on public land does, under section 169 of the Highways Act 1980. We arrange the licence with our scaffolder, and the fee depends on the council: Herefordshire, for example, charges £167 for a maximum period of one month. A scaffold wholly inside your boundary needs none.

What if the old roof has asbestos in it?

HSE's advice is to presume asbestos in any building built or refurbished before 2000 until shown otherwise. If we find a suspect material, work on that area stops, a sample is tested and the route is chosen from HSE's bands. Careful removal of cement sheets is non-licensed, while insulating board is mostly licensed work.