Re-roof duration

How long does a roof replacement take?

No one can give a reliable number without seeing the roof. What sets the time on site, and what has to happen before the scaffold goes up, can be listed.

In brief

The time on site is set by the roof, not by a standard figure: its area, its shape, the covering chosen and what is found under the old one. Before any of that, the start date can be controlled by lead times that run in the background, such as the scaffold licence notice and any building control approval. We give you a programme in writing alongside the price, after the survey, and tell you if it moves.

What decides the time on site

A re-roof is not one task of fixed size. Several things stretch or shorten it:

  • the area of the roof, and how many separate slopes it has
  • the number of valleys, hips, dormers, chimneys and roof windows, each of which needs its own detailing
  • the covering: laying small slates by hand is slower than laying large tiles
  • what is under the old covering, since rotten battens or damaged rafters add repairs before the roof can be closed
  • access, and whether materials can be lifted straight to the scaffold

None of these can be seen from the road. That is why we survey first, check from the loft where it can be entered, and photograph how the old roof is made. A day count from anyone who has not seen your roof is a guess.

A flat roof is a different shape of job again, and a home with a pitched main roof plus a flat-roofed extension has two programmes to run. Some of the work can overlap, and some cannot, because the same crew is needed for both.

The order of work, from scaffold to clear-up

Whatever the length, the sequence is the same, and each step has to finish before the next can start:

  1. The scaffold goes up, with a highway licence where one applies, and edge protection is fitted as it rises.
  2. Stripping begins, one section at a time, each no larger than can be closed in before dark.
  3. Timbers are checked and repaired, and underlay and battens go on.
  4. The new covering is laid from the eaves up, course by course, with the fixings checked as each course goes on.
  5. The ridge, hips and verges are fixed, and the flashings at the chimney and walls are dressed in.
  6. Gutters are checked, the scaffold is struck, and the site is cleared of waste.

The middle steps are where your particular roof makes itself felt. The final fix at the ridge and the verges, where the roof meets the sky, is left until the slopes below are finished, because it needs the roof beneath it to be right.

Our stage-by-stage account follows a job in order, and winter re-roofing explains how the short days change the sections.

What has to happen before day one

The start date can be fixed by paperwork and not by labour, which surprises owners who expect the crew to arrive within days. The Highways Act 1980 s169 requires a licence for scaffold erected on the public highway, and the notice asked for varies council by council. We arrange the licence with our scaffolder.

Notice asked for before a scaffold licence
CouncilNotice
Herefordshire Council10 days or longer
Monmouthshire County Council5 working days or longer
Shropshire Councilten working days or longer
Gloucestershire County Counciltwelve calendar days or longer

On approval, the answer depends on the address. For an English address, the Planning Portal's test is under 25 per cent of the total building envelope and under 50 per cent of the roof, with an application not normally needed below both. For a Welsh address, approval under the Building Regulations is needed in most situations, the Welsh Government says. A contract signed in the house after our survey also carries a 14-day cancellation period, which you can shorten only by asking in writing for an earlier start.

When a job runs past its scaffold period

A long job has a visible cost in scaffold time, because each licence covers a set period and the scaffold hire runs with it. The councils price this differently, and the units are not alike, so the figures cannot be set side by side.

  • Herefordshire Council asks £167 for one licence period, a maximum of 1 month, and £123 for each further month.
  • Monmouthshire County Council's fee starts with £108 for administration, plus £27 per week for any extension.

Those are council fees, and a delay from weather or a hidden fault is one way a job can cross them. Where a licence has to be extended, the extension is arranged before the first period lapses, not after, so the scaffold never stands without cover.

On Welsh sites there is a further timing point. The Welsh Government says the new building control regime that began on 1 July 2026 brings an automatic lapse of approval after three years, so a job approved and then left for a long time may need approval renewed.

After the survey you receive one written quote with a programme attached. For the wider picture, see roof replacement, and scaffolding for a roof replacement.

Related questions

Will I get a finish date in writing?

With the written price you receive a programme showing the order of work and how long each stage is expected to last. It is an estimate, and weather or a hidden fault can move it. If it moves, we tell you what changed and what the new dates are.

Can we stay at home during the re-roof?

The house can stay lived in, since each section is closed before evening. Some days are noisy, and the scaffold crosses the windows, so plan for that. Our page on living at home during a re-roof sets out what to move, what to cover and where the dust goes.