Inspection checklist

What does a roofer check on an inspection?

A roofer begins with the top edge of the roof and works downward through every joint where rain could get in, then goes up into the loft.

In brief

A roofer checks the ridge, hips, valleys, verges and chimney stack first, because those parts take the weather directly. Then come the open slopes, the flashings, the gutters and fascias, and the loft. Each fault is photographed and written down in order of urgency. The aim is a list you can act on, with repairs chosen to suit the way the roof was put together rather than one standard fix for every house.

The order of work: top edge first

We begin where the roof meets the sky, since the highest parts fail in their own particular ways. At the ridge, the top line where two slopes join, we look for cracked or loose capping and for the bedding underneath it. The hips, which are the sloping ridges running down to the corners, get the same treatment. Verges, the sloping edges beside a gable wall, are checked for lifted units and cracked pointing.

The chimney is next: its mortar joints, the flaunching (the mortar bed around each pot's base), the pots themselves, and the lead that seals the stack where it leaves the slope. After that we follow every valley, the trough between two slopes, because moss, leaves and splits collect in it.

Only then do we read the open slopes, row by row, for units that have slipped, cracked or gone, and for sagging lines that hint at a failed batten or rafter beneath. Flashings around dormers, rooflights and abutting walls come next, followed by gutters, fascias and downpipes. The loft finishes the job, since stains, chinks of daylight and damp timber reveal faults the covering hides from above.

What each part is checked for

The table sets out what we look for at each part, alongside the published facts that shape the judgement, so you can see why a repair is called for or can wait.

What is checked at each part of the roof
PartWhat we checkPublished fact
Ridge and vergeCapping held by fixings, not by mortar aloneMarley: since the 2015 amendments, mortar cannot be relied on as the only fixing
Slate slopesSlipped slates, hooks and tinglesCupa: no hook fixings below 25 degrees
Lead flashingsLifting, splits, open lapsMyJobQuote: lead flashing, when fitted correctly, can last for over 80 years
GuttersFalls, joints, sagging bracketsBrett Martin: 1mm for every 600mm
Flat sectionsPonding, blistered membraneNFRC: BS 6229:2025 sets a minimum 1:80 finished fall

Treat any lifespan as a typical range, not a promise. A tired flashing is a reason to renew that flashing, and it tells you nothing yet about the slopes.

For the loft side, read what a loft inspection shows. A flat section is covered under inspecting a flat roof, where falls and ponding matter most.

Finds that stop the work and pass to someone else

Some discoveries need a different person, or a licence, before a roofer carries on. The routes differ between England and Wales, so the list names the side for each.

  • Bats: a roost stops work until advice is taken, and regulation 43 of the Habitats Regulations protects a roost even from accidental damage. Natural England licenses work in England. Natural Resources Wales does so in Wales.
  • Birds: section 1 of the Wildlife and Countryside Act 1981 creates an offence of intentionally damaging a nest that birds currently occupy or are still building, so occupied nests are left alone.
  • Asbestos: for a house erected or refurbished before 2000 the HSE's starting assumption is that asbestos is there somewhere, and it describes cement-sheet roofing as always fragile, so we keep off it. Intact cement sheet can be removed carefully without a licence. White insulating-board soffit panels generally need a licensed firm, and we hand that work to one.

None of these should come as a shock. The survey names the find, shows it in a photograph, tells you who deals with it, and the roof work resumes afterwards in the right order.

What you receive at the end

The inspection ends with the photographs and a written list sorted by urgency. Some items protect the house straight away, such as a failed flashing or a missing tile over a bedroom. Others can wait a season or two. If repairing is the sounder option, the write-up says so, and full replacement is suggested only where a repair cannot hold.

If work follows, you are given the cost as one figure in writing, with a plain description of what it covers. The work area is left clean and the rubbish is taken away. If no work is needed, the report stands as a dated record of the roof that you can show to a buyer or an insurer.

Surveys themselves are priced differently from firm to firm. MyJobQuote's roof survey page (12 October 2026) gives an average of around £300 and puts a basic visual inspection at £100 to £200, so ask what each quote includes. Our page on roof survey cost has the full ranges and their source, and the main page for roof inspections shows how the whole service runs from first call to final report.

Related questions

Will the roofer lift tiles to see what is underneath?

Only where a fault points to something below. A single slipped tile, a stain on the underlay or a soft batten may justify lifting a unit or two, and each is put back or replaced. A routine inspection reads the covering, the joints and the loft without taking the roof apart.

What if the inspection finds something that is not roofing?

Bats, asbestos and similar finds are recorded and passed to the right person, with the roof work planned around them. Licensing for bats is Natural England's job in England and Natural Resources Wales's job in Wales. You get the photographs and the next step in writing.