A survey earns its keep in the paper that comes after it. A page of general remarks, such as "roof in fair condition, some work needed", leaves an owner no wiser than before and gives a roofer nothing to price. A good report is built differently. It is split into parts, each part is photographed, and each finding says where it is and what it means.
This guide takes the report in the order it is written. It starts with the front sheet, which fixes the scope and the limits, then moves through the skyline, the chimney and its metalwork, the open slopes, the flat roofs, and the eaves and gutters. It ends with the findings list and the price. Where a rule differs in England and in Wales, the guide says which side it belongs to.
You can use it two ways: as a checklist for a report you have already been given, or as a list of what to ask for before a survey is booked. See also our roof inspections page for the survey itself.
The front sheet: scope, date and limits
The first page tells the reader what the report is and what it is not. It gives the address, the date, the weather on the day and how the roof was reached: from ladders, a camera pole, a drone or from the roof itself. It also lists what was looked at, such as the main roof, the porch, the garage and the extension, so that a missing building does not pass unnoticed.
The limits matter as much as the scope. Every survey has parts it could not see, and the front sheet should say so:
- areas hidden behind a chimney, a dormer or a parapet
- sections covered by thick moss, snow or standing water
- the loft, if the hatch could not be reached or was blocked
- any section too steep or fragile to approach safely
A report that lists no limits has either seen everything or is not being straight about what it saw. On a large roof, the former is rare.
The front sheet should also say what kind of report this is. A survey is a record of condition. It is not a quote and it is not a structural engineer's calculation. Our guide on whether a roof survey is the same as a quote explains the difference. If the report says anything about insurance or a claim, treat that as a note for your insurer to read, because deciding cover is their job.
The skyline: ridge, hips and verges
The report should begin its roof findings at the highest line, because that is where wind and weather arrive first. The ridge is the capping along the apex; hips are the sloped ridges running down the corners of a hipped roof; verges are the edges at a gable end. The entries should say how each is fixed, in mortar, in dry-fix clips or in a mix, and what shape the fixing is in. A hip that has dropped at its foot is worth a note of its own, because it moves the whole run.
Fixing is where the technical terms start to matter. Marley states that "Installing to BS 5534 isn't required by law", and that since the 2015 amendments, mortar "could no longer be relied upon as the only means of securing the roof covering". Mortar is not outlawed, but a ridge held by mortar alone can still go down as a finding. BS 8612 is the dry-fix specification, and a report on a dry-fixed ridge should name what is fitted.
Look for these lines in this part of the report:
- bedding: cracked, hollow, missing or sound
- fixings: rusted, loose or absent, and whether any mechanical fixing exists at all
- capping: cracked, slipped, or gaps between sections
- verge: mortar crumbling, edge pieces lifting, or a dry verge cap displaced
Each item should have a position, such as "ridge, third section from the left gable". Our page on drone roof surveys shows how an aerial view helps with a ridge that is hard to reach.
Chimneys, flashings and valleys
This is the section where the metalwork is described. Around a chimney, lead flashings seal the joint between stack and slope, soakers (small folded lead sheets worked in under each course) turn water onto the tiles, and the flaunching is the mortar bed holding the pots. A valley is the lined trough along the join of two roof planes. The report should say what each is made from, what condition it is in and where it sits.
Lead is the usual metal. Royston Lead's brochure lists Code 3 (1.32 mm) as "Recommended for lead soakers only", so a report that finds Code 3 used as a flashing has found something worth recording.
| Element | Material and condition | Position |
|---|---|---|
| Flashing | Lead or other, lifting or sound | Which face of the stack |
| Soakers | Present, corroded or missing | Course numbers |
| Valley | Lined with lead, GRP or tile | Left or right of the roof |
| Flaunching | Cracked, crumbling or firm | Which pot or flue |
A chimney entry should also describe the stack itself: the pointing, any lean, the condition of the pots and cowls. Per the Herefordshire building stone atlas, the large external stacks of the black-and-white houses are described as commonly of local sandstone, which weathers differently from brick, so the report names the material rather than guessing.
MyJobQuote says lead flashing, once correctly installed, can last for over 80 years. The wording is a hedge and carries no promise, and an old flashing that looks intact still deserves a photograph and a close look at its edges.
The open slopes: covering, fixings and pitch
On the main slopes the report moves course by course. It should list cracked, slipped and missing pieces, and say whether the nails or clips holding them have corroded. On slate, it notes pieces that have drifted off the line of the course, split, or lost the lead or copper clip that holds them. On tile, it notes snapped nibs, the lugs that tie a tile to its batten. Moss and lichen get a line too, because a thick growth holds water against the covering and hides faults beneath it.
Pitch belongs in this part of the report, because the covering has to suit the angle, and a steep roof can carry a covering a shallow one could not. Marley publishes minimum pitches by product. Cupa ties the BS 5534 figure of 20 degrees to natural slate in moderate exposure, with a 500mm slate and a 115mm overlap, and keeps hook fixings off every pitch below 25º. A report should record the measured pitch where a covering looks mismatched.
| Covering | Minimum pitch |
|---|---|
| Concrete plain tile | 35 degrees |
| Concrete Double Roman (smooth) | 22.5 degrees |
| Clay Canterbury | 40 degrees |
Stone and slate roofs carry their own note. SPAB says Welsh slate and stone roofs "are predominantly double-lapped", which means the courses above shelter each piece, and one displaced piece can open a gap hidden from anyone standing on the ground. A report on a stone tilestone roof records what it sees on the slope, not a pitch figure.
Flat roofs, eaves and gutters
Flat roofs over extensions, garages and dormer cheeks are reported as a separate part, because their faults differ. The entry should cover the membrane (felt, EPDM or GRP), seams and laps, blisters or splits, the upturn where the covering rises against a wall, the flashing over it, and the outlet. Ponding is the main sign of a falls problem. NFRC reads BS 6229:2025 as setting a minimum 1:80 finished fall, and IKO advises designing for 1:40 to reach it.
At the eaves and gutters, the report records:
- whether the underlay discharges into the gutter or behind it
- fascia and soffit condition, including any rot
- gutter alignment, joints and sagging between brackets
- downpipes and gullies, and whether they run free
Brett Martin gives gutter fall as "1mm for every 600mm", so a gutter that holds water after rain can be tested against it. A blocked or sagging gutter can mimic a roof leak on the wall inside the house, so the entry gives which it is, and how that was told apart.
If the soffit is white and may be insulating board, the report should say that the material is suspected asbestos and that sampling or a specialist is needed. HSE lists "AIB white soffit panels to underside of roof eaves" among the locations where asbestos insulating board is found, and removal of it is usually licensed work, which we pass to a licensed firm.
Findings, price and the rules that follow
The last part is where an owner's eye lands, so it deserves the most care. It should rank the findings in three groups: urgent, soon, and monitor. Each repair should link back to its photograph and its position, with the part of the report it came from, so the price can be checked against the evidence, and a second roofer given the same report could see the same faults.
On cost, MyJobQuote lists a basic visual inspection at £100 to £200, a full survey at £250 to £400 and a drone survey at £200 to £350, with the average across all kinds at around £300. Any repair that follows gets one price, set out on paper. Our page on roof survey cost sets out what moves the figure.
The report should also say what permissions a larger job may need. England and Wales part ways here:
| Point | England | Wales |
|---|---|---|
| Approval | Planning Portal: no application normally needed if "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" is affected | Welsh Government: "In most situations, this work will need Building Regulations approval." |
| Heavier covering | Planning Portal: "15 per cent or more" | Welsh AD A: "more than 15%" |
| New roof U-value | AD L Table 4.2: 0.15 | AD L Table 4.1: 0.13 |
The next edition of AD L takes effect on 24 March 2027 in England and on 4 March 2027 in Wales, so a job that straddles those dates should say which edition it follows. Before a larger job starts we ask building control in the right country: the council or a registered building control approver.