Every extension has a seam. On one side sits the new roof; on the other stands the original house, whose wall carries on upwards past the new roofline. Rain streams down that wall and arrives on the seam, so whatever seals it must cope with the wall's share of the weather as well as the rain landing on the extension.
The seal is a flashing: a strip of sheet lead, bent to shape, fixed to the masonry and dressed over the roof covering. The junction is called an abutment, because the roof butts against a wall that stays higher than it. The word covers a single-storey kitchen extension, a porch, a garage that has been joined to the house and a lean-to against a side wall.
The sections below follow the detail outwards from the wall. They explain why lead is chosen, how a pitched roof and a flat roof meet the wall in different ways, how the lead is fixed into the masonry, which codes Royston lists for flashings, and what changes when a neighbour shares the wall or the extension is new building work. Our lead roofing page sets out the other leadwork we fit and repair.
Why the seam between roof and wall is lead's job
A roof covering cannot seal against a wall by itself. Tiles, slates and roofing membranes finish at the eaves and verge lines, and the wall is another material that moves in its own way. The gap between the two is open to the weather unless something bridges it, and that bridge must follow the profile of both surfaces.
Sheet lead suits the task because a roofer can shape it by hand. It folds round corners, presses into the profile of a tile or the unevenness of an old stone, and keeps the shape it is given. A joint that has settled over several winters is less likely to crack open than one made with a stiff material.
The detail has two jobs. Run-off coming off the face of the wall must be sent outwards across the covering. And driven rain pushed up the slope must be stopped from sliding behind the lead, which is why the top edge of a flashing goes into the wall and does not merely rest against it.
On an extension survey, we begin at the seam and check these points:
- marks on the brick or stone above the lead, showing where run-off has been landing
- a gap between lead and wall that shows daylight
- pointing that has dropped out above the flashing
- lead that has lifted or slumped along its lower edge
Each point goes into a photograph, which lets you judge the seam as it stands before anyone talks about replacing it.
Pitched and flat extension roofs meet the wall differently
The shape of the extension roof sets the shape of the flashing. A pitched roof climbs the wall at an angle, so its flashing climbs in steps. A flat roof meets the wall along a straight line, so its flashing is a straight strip hung over a turned-up edge.
| Extension roof | Detail at the wall |
|---|---|
| Pitched, tiled or slated, rising beside the wall | Stepped flashing, with soakers or a lead cover along the rising edge |
| Pitched, running up to a wall at its head | Apron flashing, with a back gutter if the wall is wide |
| Flat, in EPDM, GRP or felt | Upstand where the membrane turns up, with a cover flashing over it |
| Flat, in lead sheet | Lead turned up the wall and covered by its own flashing |
Soakers are little bent pieces of lead that slide beneath the tiles or slates, a single piece for every course, with the stepped flashing resting over them against the wall. An apron runs along the base of a wall where it meets the top of a slope. An upstand is the short vertical edge where a flat roof's waterproof layer turns up the wall, and the cover flashing is the lead that hangs over its top edge so nothing can run behind it.
Which of these an extension needs depends on how its roof was built. Our guide to step, apron and cover flashings goes through each one, and soakers or step flashing explains how the two ways of flashing a pitched edge compare.
Chasing the lead into the wall
A flashing stuck only to the face of a wall will eventually come away. The reliable method is to cut a groove, called a chase or a raglet, into the wall along the line the flashing will follow, and to tuck the top edge of the lead into it. Wedges hold the lead in place, and the groove is then pointed with mortar to close it.
On a brick extension, the groove is cut along a mortar joint. In a stone wall, it follows the joint between the stones and leaves the stones themselves alone. On a black-and-white timber-framed house in north-west Herefordshire, the lowest timber rests on sandstone or siltstone, and the atlas of county building stone published by Herefordshire Council says the big external chimney stacks on such houses are "commonly of local sandstone". Where an extension butts against that kind of stone, the groove follows the bed of mortar, and the lead goes into the lowest joint that gives enough cover.
If the wall is old and lime-mortared, the choice of pointing mortar matters. A cement mortar is harder than the stone around it and can crack the face of the stone when the wall moves. Where we point into a lime wall, the quote says which mortar goes in.
Some walls cannot be chased at all. The flashing is then fixed to the surface and covered with a second piece of lead or a sealed trim. The walls in question include:
- rendered walls
- cladding
- certain timber panels
In every case the quote names the method and gives the reason for it, and the finished joint is photographed from the roof before the scaffold comes down.
The lead codes Royston lists for flashings
Royston Lead's cast lead brochure groups its codes by use. Flashings sit in one group and soakers in another, and the two groups overlap at a single code, which is Code 4.
| Piece | Codes listed | Sheet thickness |
|---|---|---|
| Soakers | 3 and 4 | 1.32mm and 1.80mm |
| Flashings | 4, 5 and 6 | 1.80mm, 2.24mm and 2.65mm |
Royston adds a caution of its own on Code 3, the lightest sheet: it is "Recommended for lead soakers only". A cover flashing cut from Code 3 would be the wrong sheet for the job, and a quote that names Code 3 for a flashing deserves a question before you accept it.
Choosing between 4, 5 and 6 for the cover flashing is a decision made on the roof. It turns on the length of the run, how exposed the wall is and what the neighbouring leadwork is made of. Lead should not be mixed up with the flat-roof standard BS 6229:2025, which covers membranes laid on a continuous support and never lead. For lead, England's Approved Document C (2013 edition) cites BS 6915:2001.
Lead also lasts when it is laid with care. MyJobQuote writes that lead flashing which is correctly installed "can last for over 80 years". That is a hedged statement about a well-laid job, and not a promise about any single roof.
Cost depends on the length of the abutment, the code, the way the wall is built and whether the flashing is within reach of a ladder or needs access equipment. After the survey visit you receive a single written total.
When the wall belongs to a neighbour
Many extensions in terraces and semi-detached pairs stand against a wall that a neighbour owns or shares. Cutting a groove for lead into that wall touches the neighbour's property, and for houses in both England and Wales the Party Wall etc. Act 1996 governs it.
Under section 2(2)(j), the building owner has the right "to cut into the wall of an adjoining owner's building in order to insert a flashing or other weather-proofing of a wall erected against that wall". Using the right starts with paperwork, and serving it is the building owner's job, not the roofer's. For work to a party structure under s3(2)(a), the notice runs "at least two months before the date on which the proposed work will begin".
The neighbour's reply then sets the route:
- Agreement in writing under s3(3)(a) lets the job proceed.
- Silence for 14 days is read under s5 as dissent, and a dispute is deemed to exist.
- A dispute brings in a surveyor under s10: a single surveyor both owners accept, or one apiece.
GOV.UK is plain that a neighbour's silence is not agreement. Questions about the notice itself belong with a party wall surveyor, not building control. We can show where a flashing will be cut in, and how deep, so the building owner has the detail to hand when the paperwork is drawn up. A neighbour's roof or gutter may also run along the same wall, so the survey looks at both sides of the line and photographs what can be seen of the join from our side.
An extension roof is building work: England and Wales
A new extension roof is building work in both countries, though England and Wales set the rules for it separately. The flashing belongs to a roof that has to meet them.
- In England, the Planning Portal says of a new roof on a conservatory: "A new roof must comply with building regulations to ensure it is structurally safe, energy efficient and properly ventilated." That sentence is about conservatories, but it shows the approach: speak to building control before the roof goes on, and not after. The Portal also states that "Building regulations approval will always apply when removing chimney breasts", which matters if the extension joins a wall that carries a stack.
- In Wales, the Building Regulations 2010 apply as amended by Welsh regulations, and the Welsh approved documents are marked "For use in Wales". Ask the council's building control team or a registered building control approver which Welsh document applies to the plans, since the insulation figures differ from England's.
Listed houses add a second consent. In England it comes from s7 of the Planning (Listed Buildings and Conservation Areas) Act 1990. In Wales it comes from s88 and s89 of the Historic Environment (Wales) Act 2023. A flashing chased into a listed wall alters the building, so the consent question comes before the lead.