A flat roof is a waterproof skin laid over a deck, and the skin has to be sealed at its edges. Across the open area, one sheet or one laminate does the work. At the boundary the skin has to change direction: up a house wall, over a kerb round a rooflight, or out past the edge into a gutter. Each change of direction is a joint, and a joint is where a flat roof can let water in.
Three terms run through this guide. An upstand is the part of the membrane that turns up a wall or a raised edge. A kerb is a small raised timber frame built round a rooflight or an outlet so the skin can climb it. An edge trim is the metal or plastic strip that finishes the roof at its edge and throws water clear of the wall.
The sections below follow the order of our survey: the wall junction, the corners and penetrations, the flashing above, the edge and gutter, and then the rules once a repair becomes a re-cover. Our flat roofing page covers the wider service, and the sections on edges and gutters follow the water as it leaves the roof.
The wall junction, where the membrane turns up
At a house wall, the waterproofing is carried up the brickwork or stone as an upstand and sealed under a flashing above it. Two things decide whether that junction lasts: how well the upstand is bonded or welded to the roof, and how well its top edge is protected from the rain that runs down the wall.
The turn from flat to vertical is the weak point of the upstand itself. A skin folded sharply at ninety degrees is under strain whenever the roof moves with the weather, so a fillet, a small angled strip or bead in the corner, gives the membrane a gentler bend. The height of the upstand comes from the maker's specification for the system, and we work to the data sheet for the covering on your roof rather than a rule of thumb.
At the top, the finish depends on the wall behind it:
| Wall behind | How the top is sealed |
|---|---|
| Brick or block | A chase (a slot cut along a mortar course) holding a tucked-in flashing |
| Render | A flashing or bar sealed under a neat render line |
| Stone rubble | Lead wedged into a raked-out joint and repointed |
| Timber frame or cladding | A flashing dressed behind lifted boards, then refixed |
Herefordshire's building stone atlas picks out the timber-framed "black-and-white" house, most striking in the northwest quarter. A flat-roofed extension on one of those has timber and infill behind the upstand instead of masonry, so the flashing is dressed to a sound face rather than forced into a joint.
Corners, laps and the places pipes come through
On the open roof the membrane is laid in one run or in sheets that overlap. Inside a corner, or where a pipe, vent or cable passes through, the material has to be cut, folded or built up, and every cut is a place for a seam to open. The method differs with the covering.
- Torch-on felt: layers are bonded by heat, and corners are built up with extra patches so no cut edge faces the weather.
- EPDM rubber: the sheet is bonded to the deck and formed into pre-made corner pieces and collars at pipes, sealed with tape or adhesive.
- GRP fibreglass: the laminate is laid in wet and runs up the wall as one piece, so a corner has no seam, though it can crack if the structure moves.
Our guides to rubber EPDM flat roofs and GRP fibreglass flat roofs explain each system in full.
A rooflight or access hatch is mounted on a kerb. The kerb is built from timber, fixed to the deck, and the membrane is taken up its sides and tucked under the rooflight's own frame. A kerb that is too low, or that has been wrapped without a fillet, leaves a thin skin where a lot of foot traffic and weather collect.
At a pipe, look for a collar that has split in the sun, a clip that has let go, or sealant that has dried out and drawn back from the joint. These are small faults, and they cost less to put right when found before the water has reached the deck.
One more spot is the junction between two different coverings, such as a felt roof that was extended in rubber. The two materials do not bond to each other, so the join relies on a separate sealed lap or a capping strip, and that strip is worth checking for gaps.
The flashing above the upstand
The flashing is the metal strip that caps an upstand and shoots rain over it. On house walls it is lead, zinc or coated aluminium. Lead is outside the scope of BS 6229, which covers membranes only, and Approved Document C cites BS 6915:2001 for lead sheet.
Royston Lead's cast lead brochure lists each code number with the uses it suits. For flashings, it lists Code 4, Code 5 and Code 6. Code 3 is described as "Recommended for lead soakers only", so it is not a flashing code. A higher code is thicker and heavier, and the thickness suits the exposure and the length of each piece.
What goes wrong with a flashing:
- the top edge lifts away from the wall, where the pointing has crumbled
- the lead is stretched at a corner and has split
- sealant has been used where a fixing should be, and has since failed
- the flashing sits too low, so rain runs behind it instead of over it
Where a flashing is sound, we repoint the chase and leave it. For chimney lead flashing, MyJobQuote gives around £200 for a patch and around £570 for a full replacement (22 September 2026). That is a scale for small lead jobs, though a chimney is a different job from a wall abutment. Our guide to the lead codes used on Herefordshire roofs sets out each thickness.
Edge trims and the line into the gutter
At the edge of the roof, the membrane is dressed over a drip trim, a strip fixed to the deck edge that carries water forward so it clears the fascia and falls into the gutter. A trim that is too short, bent or lifted lets water run back along its underside and into the timber behind.
The gutter and the roof edge work as a pair. NFRC says BS 6229:2025 sets "a minimum 1:80 finished fall for general roof areas and internal gutters". IKO advises designing for 1:40 to reach that 1:80 once the roof is built. For ordinary guttering on the fascia, Brett Martin gives "1mm for every 600mm".
Signs the edge is failing show up from the ground, if you know where to look:
- a dark stain running down the wall below the edge
- a gutter that overflows at one end, or holds water in the middle
- a fascia board that is soft or has lost its paint
- a gap between the trim and the membrane, where light shows through
A roof that drains toward a gutter on a fascia, rather than toward an internal outlet, depends on the gutter being clear and level. Our guide to where a flat roof should drain looks at the choice between them. The guttering and fascia boards themselves are covered by our guttering, soffits and fascias service.
Repairing an edge or re-covering the whole roof
A split along an upstand or a lifted trim can be put right as a repair: a strip of new membrane welded or bonded over the old, the flashing repointed, the trim refixed. Checkatrade gives repair rates for flat roofs of £120 to £170 per m² for EPDM and £130 to £180 per m² for GRP (June 2026, ex VAT, up to 3 m²). Those are per-square-metre figures for small repairs, not totals, and we do not multiply them.
When the damage runs the whole length of a roof edge, or the deck beneath is soft, a repair only covers the symptom. At that point the sensible choice is to strip back and re-cover, with new upstands and trims built in from the start. We photograph the edge and the deck, show you what we found, and then give you a single written total price.
Re-covering brings Building Regulations into play, and England and Wales set the test differently.
- Planning Portal guidance for England: no application is normally needed where "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" is affected.
- In Wales, the Welsh Government says of re-roofing: "In most situations, this work will need Building Regulations approval."
Laying a new waterproof membrane across a flat deck counts as renovation under Approved Document L, in the English edition and the Welsh one. In England, Table 4.3 gives 0.35 as the threshold and 0.16 as the improved U-value for a retained roof. In Wales, Table 11.1 gives 0.16, and not worse than 0.35 where 0.16 is not feasible.
What the survey checks along every edge
When we survey a flat roof with an edge or wall problem, we walk the full outline, not just the stain. The checks follow the roof round, one line at a time.
- Each wall junction: upstand height, bonding, fillet and the flashing above.
- Each kerb: frame condition, how the membrane laps the sides, and the rooflight seal.
- Each pipe or vent: collar, clip and sealant.
- The edge trim: fixing, length, and whether it throws water clear.
- The outlet or gutter: free flow, level and joints.
- The deck beneath, wherever the membrane has opened, for soft or dark timber.
Every fault gets photographed where it sits, and you see the pictures with a plain account of what each one means. If a smaller repair would serve, we recommend it, and the quote covers that repair alone.
Access comes first. A roof edge at first-floor height needs a safe working platform, and where the work stands on the highway, a scaffold licence is needed under the Highways Act 1980 section 169. We arrange the licence with our scaffolder. Access scaffolding is covered by that same written total.
Before we leave, the roof is swept, offcuts and old membrane are bagged, and the waste goes with us. If the weather stops the work part-way, the open edge is made watertight for the night with a temporary seal, so a half-finished junction is never left to the rain.