In brief
The length follows the stages: a reply from building control and delivery of the covering before anything starts, then stripping, a frame check, the new roof, the flashing at the house wall, the gutters and the clear-up. A sheet-for-sheet swap has fewer stages than a solid roof. The programme comes in writing with the quote, and weather or a late delivery can shift it. A scaffold on the road adds the council's lead time.
The stages that set the length
| Stage | What decides its length |
|---|---|
| Before the start | Building control reply, delivery of the covering, any scaffold licence |
| Stripping | The type and fixings of the old roof, and the waste it makes |
| Frame check | Repairs to timber or aluminium found once the roof is off |
| New roof | Sheets are laid faster than battens, underlay and tiles |
| House wall | Cutting a chase and dressing the lead flashing |
| Gutters and clear-up | Fascia, downpipes, sweeping and carrying away the waste |
No two conservatories run the same course, which is why a bare number of days can mislead. A tidy lean-to with a sound frame passes through the stages quickly. A Victorian front with a long ridge and a rotten wall plate takes longer at the frame check and the new roof.
The first rows of the table are where a timetable first meets the real house. How the old roof is fixed, and what lies beneath it, only show once it starts to lift, and a good programme leaves room for what turns up.
You get the programme in writing with the quote, after the survey, with the order of work and the points that could move it. It is a plan, and we tell you early if a stage is running behind.
Sheets, glass and solid roofs compared
The covering sets most of the difference in time. Three broad cases show it:
- Polycarbonate sheets: a light roof with few layers, so stripping and laying are the shortest stages
- Glass: each pane is lifted, set and sealed, and panes are heavy, so the new roof takes longer to go on
- Solid or tiled: insulation, underlay, battens and tiles go on in layers, and the ceiling lining inside is a stage of its own
Changing one covering for another of the same kind is quicker than changing the type, because the frame was built for it. A heavier roof means a closer look at the frame before any of it is laid. If the frame needs strengthening, that happens first, and it can be the longest single stage.
Our guide to solid tiled conservatory roofs shows the layers, and the day-by-day guide walks through them in order.
A solid roof leaves the room darker, so some owners add roof windows. Each opening is framed and weathered separately, and that adds its own stage.
Weather and an open roof
A conservatory with its roof off is open to the sky, so weather matters more here than on a pitched house roof. We strip only an area that can be closed again before we leave, and the floor and fittings under the opening are covered before the first sheet comes off.
Rain does not stop the whole job. Lead work, gutter work and some work inside the room carry on, while stripping and laying wait for a dry spell. High wind stops panes and sheets being handled safely, because a large light sheet can catch the air like a sail.
We describe the weather in general terms and do not promise a date on a forecast. A programme with a margin in it is more useful than a tight one that breaks at the first wet morning.
If the weather holds a stage back, the next one is not started over it. The roof is made weathertight at each break, so a pause costs you time and not water in the room.
What to settle before the first day
Delays can start before the first day, not on it. These are the points to settle early:
- the building control reply: in England from the council or a registered building control approver, in Wales from the council's building control service or an approver
- delivery dates for glass or panels made to size, which cannot be hurried once they are ordered
- any scaffold licence: Herefordshire asks for at least 10 days' notice and Monmouthshire for at least 5 working days
- a clear route for the materials and for the waste to leave
- furniture and plants out of the room
If building control asks to see a stage before it is covered, such as the frame, that visit is booked in advance and the work waits for it. Telling us at the survey who your building control body is lets us put that visit into the programme from the start.
Our page on scaffold for a conservatory roof sets out how the lead times work. The conservatory roofs hub links the rest of the series, including the rules.
