Scaffold and access

Does a conservatory roof need scaffolding?

Some conservatory roofs are reached without a full scaffold and some are not. The survey decides, and a licence is only needed when the scaffold stands on the highway.

In brief

Not always. It depends on how high the house wall rises above the roof, whether every edge can be reached safely and what stands beneath. The call is made at the survey, from photographs of the access, and any scaffold is covered by the single total you are given. Your own ground needs no licence. A platform over the footway or carriageway needs a scaffold licence (Highways Act 1980, section 169), and we arrange the licence with our scaffolder.

What decides how the roof is reached

A conservatory roof sits lower than the roof of the house, but that does not settle the matter. Three points decide how the work is reached, and we look at all three on the survey visit:

  • how far the house wall rises above the conservatory roof, since the flashing where they meet is worked from above
  • whether every edge of the roof can be reached safely: front, sides and gutter line
  • what lies beneath: a patio, a lawn, a drop, or a neighbour's boundary

A glass roof adds a fourth point, because panes are heavy and need a safe route in. A conservatory built against a taller extension leaves an awkward corner, and the access there is planned before anyone climbs. Edge protection at the eaves and a steady platform at the house wall come first, and the roof itself follows.

At the survey we photograph the access from the lawn side and from the room itself, and the working platform is chosen from those photographs. A scaffold, where one is needed, is part of the written quote, so you do not hire one separately.

When the scaffold stands on the road

Scaffold standing wholly inside your boundary falls outside the highway rules. Scaffold over the footway or carriageway is caught by them. The licence is a scaffold licence under section 169 of the Highways Act 1980, and we arrange the licence with our scaffolder. The councils publish charges in different units, so read each row on its own terms. A month in one row is not a week in another, and the page of the council concerned is the authority.

Council scaffold licence charges and lead times
CouncilCharge as publishedLead time
Herefordshire£167 for a maximum period of 1 month; each extra month £12310 days or more
Gloucestershire£145 for a minimum of 28 days, then £36 per 7 days12 calendar days or more
Shropshire£200, with no period givenTen working days or more
Monmouthshire£108 administration fee, plus £27 per week to extend5 working days or more

Worcestershire County Council's page sets £85 per week and £65 for each later week, with a £25 urgency surcharge, and calls the contractor "required to apply". At a Powys address, ask the council's highways team for the charge and the wait.

Lead time and the order of work

The lead times in the table fix the earliest day a scaffold can go up on a public road, and so the earliest day the roof can come off. A date that looks close on the calendar may sit behind a ten-day or twelve-day wait, so the application goes in as soon as the survey shows that the road side is involved.

Starting without a licence costs more, and the charge is the council's own. Herefordshire's retrospective charge is £335.50 for one month, Gloucestershire lists £62.50 for urgent or retrospective cases, and Shropshire lists £400 for unlicensed scaffolding. A planned job can avoid all three.

A shared drive or private lane is not always a public highway, and the council's highways team can say which it is. Tell us early if your conservatory sits close to the front boundary or a shared access, so that the question is asked at survey and not on the day.

Where the conservatory is at the back of the house, the scaffold stays inside your boundary and none of this arises. Our page on how long a conservatory roof swap takes shows where a licence wait fits into the order of work.

Questions for the quote

Scaffold varies with the site, so check what a quote says about it. These points are worth asking:

  • does the total include the scaffold, and VAT on it
  • who arranges any highway licence, and who tells the neighbours
  • what happens if the licence takes longer than the lead time
  • how the access is kept clear of your doors and path
  • whether the quote names the neighbours who have been told

A scaffold that has to stand partly on a neighbour's land needs their agreement first. That point is raised at survey, well before the scaffolders turn up.

Scaffold is one of several questions a roof change raises. On a replacement conservatory roof the Portal's rule is compliance with the Building Regulations, so building control is asked in both countries: the council or a registered building control approver in England, and the council's building control service or an approver in Wales. The conservatory roofs hub lists the rest, and the cost page shows how a published range is read against a quote.

Related questions

Do I apply for the scaffold licence myself?

No. Should the scaffold have to occupy the highway, we arrange the licence with our scaffolder. Your part is to tell us early if the conservatory is near the boundary, so that the survey can plan for the lead time the council sets for its licence.

Can a conservatory roof be done from ladders alone?

That is judged from the roof we are looking at, from its height, its edges and the ground beneath. We photograph the access at survey and set out what is needed. If a platform is the answer, the written quote carries it, and you have nothing to arrange.