Planned maintenance

Planned maintenance for business roofs

A planned maintenance visit finds small faults on a business roof before they become leaks inside. This guide sets out what we check, what the report holds and which rules apply.

Horizon Roofing Hereford 9 min read

A business roof is out of sight for most of the year, and that is the reason it fails with so little warning. A blocked outlet, a lifted lap or a loose fixing does nothing visible until a wet week brings water through a ceiling onto stock or machinery. Planned maintenance for business roofs swaps that surprise for a routine: someone looks at the whole roof on a schedule, records what is found, and puts right the small things while they are still small.

This guide describes what a maintenance visit covers on a unit, a shop, an office block or a farm building, and what the written report should hold. It looks at gutters, outlets and falls, at safe access, at the asbestos question that comes with older sheet roofs, and at the point where a repair becomes re-covering and building control takes an interest in England and in Wales.

The work sits within our commercial roofing service. The gutter side has a guide of its own, on how often to clear commercial gutters, and the sections below cover the rest of the roof.

What a maintenance visit actually covers

A visit follows the roof from the edge inwards. On a profiled metal roof it covers the sheets, the laps between them, the fixings, the sealant and the rooflights. On a flat roof with a membrane it covers the surface, the seams, the upstands (the places where the covering turns up against a wall) and the edge trims. On both, it covers the gutters, the outlets, the flashings and the junctions with other buildings, since those are the places where water leaves the roof or meets a wall.

What is looked at, and why
Part of the roofChecked for
Gutters and outletsSilt, leaves, birds' nests, sagging runs
Sheet laps and fixingsLifted laps, loose or missing fasteners, rust
Rooflight sheetsCracks, crazing, split laps
Membrane seamsOpen joints, blisters, splits
Upstands and flashingsGaps, lifted edges, failed sealant
Cut edges and fixingsEarly corrosion on metal sheets

A good visit does not stop at looking. Small faults are cleared on the spot where they are safe to reach: silt out of a gutter, a fastener replaced, a short length of lap resealed. Anything larger is photographed and described in the report, with a written price offered before any work starts.

The photographs matter as much as the clearing. They show the owner or the managing agent exactly where a fault sits, so a decision about a larger repair can be made from the office rather than on a ladder.

How often to visit, and what changes the interval

No single interval suits every roof. The right rhythm depends on the building and its surroundings. Branches that hang over a roof shed their leaves into the gutters every autumn. A unit beside a farm or a yard collects dust and chaff. A food premises with extraction vents puts grease on the surface nearby. A roof with a complicated layout, many rooflights or plant on top has more places to fail than a simple span.

The things that move the interval:

  • trees close to the roof or gutter line
  • the age of the roof and of its sheets, membrane or seams
  • how many rooflights, ridge vents, flues and pipes pierce the surface
  • what is stored or made underneath, and how much water damage would cost
  • whether the roof is a fragile type that needs a platform each time

A visit in the autumn, once the leaves are down, and another after any hard storm gives the gutters and the weak spots a fair chance. The first survey sets a baseline, and the report from it says how soon the next visit should be and what to look at first.

If a lease makes the tenant responsible for the roof, a run of dated reports is also clear evidence that the duty was met. If the landlord keeps the roof, the same reports show the tenant that the building is being looked after. Either way, the schedule is agreed in writing at the start, so that nobody has to ask who was supposed to look at the roof last.

Gutters, outlets and falls on a flat or low-slope roof

Water that stays on a roof is the usual start of a failure. On a flat or low-slope roof, the fall (the slope that carries water to the outlet) decides whether the surface drains. The NFRC says BS 6229:2025 sets "a minimum 1:80 finished fall for general roof areas and internal gutters", and IKO advises designing for 1:40 so that 1:80 is achieved once the roof is built. BS 6229:2025 covers membranes, not metal profiled sheets, and not lead.

A maintenance visit looks for ponding, which means water still standing on the surface well after the rain has stopped. Ponding can come from a blocked outlet, a settled deck, or a fall that was never enough. A blocked outlet is a cleaning job. The other two need a decision with a surveyor, because moving a fall means changing the deck or the build-up, not the surface.

Gutters need a fall as well. For gutters, Brett Martin gives a fall of "1mm for every 600mm". A box gutter or a valley gutter on a commercial roof carries a larger flow than a house gutter and gives less warning when it blocks, as our guide to valley and box gutters on commercial roofs explains.

The visit report records which outlets were cleared, which were found blocked, and which run slowly, because slow outlets are the early sign of a drain that will not cope with a heavy shower. It also notes any leaf guards or grilles that are missing, since those are cheap to fit and save the same clearing job coming round again.

Safe access and the construction phase plan

Routine visits still have to be planned for the roof they are on. A fragile roof, which means any asbestos cement sheet roof and any roof with unproven rooflight sheets, is reached from a platform or over boards that bear on the steel. A roof with a parapet may need edge protection only at a few points. A flat roof with no guard rail needs a safe way of staying clear of the edge.

For the owner, the useful step is to decide who may go on the roof and to write it down. Gutter clearing by a caretaker, a quick look by a tenant's staff and a contractor's visit are three separate cases, and each needs the same answer to the same question: is this roof safe to stand on? Our guide to who can go on an industrial roof sets out that decision.

The Construction (Design and Management) Regulations 2015 (CDM) apply to commercial clients in England and in Wales. HSE limits the term domestic client to a private individual who has building work done at their own house, outside any business, so the owner of a unit or shop is not one.

For a project with a single contractor, regulation 15(5) puts the construction phase plan on that contractor, prepared before work on site gets going. On a repeat maintenance visit, the plan is written once and reviewed each time. The written quote is one total price after the survey, and it states which access equipment it covers.

Asbestos records for older sheet roofs

A roof built or refurbished before 2000 should be treated as containing asbestos until a test proves otherwise, as the HSE advises across Great Britain. On a unit with cement sheets, that rule governs what a maintenance visit may do.

HSE's list of non-licensed work includes maintenance on asbestos cement (AC) products such as roof sheeting, provided the material is carefully handled. It also lists the removal of AC sheets that stay intact as non-licensed work. Once sheets are substantially damaged or broken, the work falls into the notifiable non-licensed category, which brings further duties.

A maintenance visit on an AC roof is therefore about looking, recording and avoiding damage. It leaves out scrubbing, drilling and walking on the sheets. What the owner should keep:

  • the date of the building and of any re-roofing or refurbishment
  • the result of any asbestos survey or sample test, if one has been done
  • a plan marking which sheets, flues and rainwater goods contain asbestos
  • the report from each visit, with photographs of any damage found

If AIB, asbestos insulating board, turns up in soffits or linings, HSE treats most removal of it as licensed work, and a firm holding that licence takes it on; we pass it across. Our guide to asbestos cement sheet roofs on industrial units covers the categories in more depth.

A roof record that names where the asbestos is, and when it was last inspected, spares every later contractor from guessing, and it is the first document a surveyor asks for when the building is sold or let.

When a repair becomes re-covering: England and Wales

Maintenance and small repairs need not be building work. Re-covering is different, and the line is not always where an owner expects. The rule on each side of the border is worth knowing before a long list of repairs turns into a new roof.

  • In England, building control is provided by the council or by a registered building control approver. The Planning Portal's re-roofing test is written for homes, so for a commercial roof ask the council's building control team or an approver whether a repair on this scale needs an application.
  • In Wales, Welsh Government guidance accepts that some flat roof repairs need no application, though replacing a roof built with integral insulation can mean upgrading its thermal element. The Building Safety Regulator oversees registered approvers there for the Welsh Ministers, who regulate the councils themselves.

The Building Regulations 2010 count a roof as a thermal element. So renewing the waterproofing on a flat roof can pull insulation into the work.

The maintenance report is the place where this line gets watched. When the repairs on the list begin to add up to a large part of the roof, the report says so, and the owner can ask building control on the right side of the border before more money goes into patching.

A larger repair is quoted as one written total, which lets patching and re-covering be weighed against each other.

Planned roof maintenance: questions

What should a roof maintenance report for a unit include?

It should list what was checked, the condition found at gutters, outlets, laps, fixings, rooflights and flashings, and photographs of each fault with its position on the roof. It should also record what was cleared on the day, what needs a quoted repair, and when the next visit should happen.

Is a maintenance visit on an asbestos cement roof allowed?

A visit to look and record is allowed, and HSE counts maintenance on AC roof sheeting as non-licensed work when the sheets are handled with care. Walking on the sheets, drilling or brushing them is not part of it. Damaged or broken sheets move the work into a notifiable category.

Do I still need a maintenance visit if the roof is fairly new?

A first visit sets a baseline report, which is useful whatever the age of the roof. New roofs can still collect debris in gutters and outlets, and early fixing or lap problems are easier to deal with than later ones. The report says how soon the next visit should be.