Single-ply is the name for a waterproof covering made from one sheet of synthetic membrane, rather than the layers of bitumen felt that older flat roofs were built from. On a shop, a unit, a surgery or a village hall, it is the surface the rain meets, so a leak question on such a roof comes back to the sheet, its joints and the places where it turns up a wall.
The names you will meet are EPDM, a synthetic rubber sheet, and TPO and PVC, two plastic-based sheets. Our guide to what a TPO membrane is deals with the second of those. The sheet itself is only part of the roof, because the deck beneath it, the insulation, the falls and the edge details decide whether it stays watertight.
We look at those parts in survey order, with the standards named and the England and Wales approvals labelled. The roofs sit inside our commercial roofing work, and each one is priced from its survey.
What single-ply is, and what it is not
The easiest way to see the difference is to look at the build-up. A felt roof is made on site from several layers bonded together. A single-ply roof arrives as a manufactured sheet, and the work on site is laying it, fixing it and joining the edges. The quality of the roof therefore sits in three places: the preparation of the deck, the joints between sheets, and the details at every upstand, outlet and rooflight.
That is also why two roofs described as the same material can behave differently. A sheet may be held down in one of three ways, and the right choice depends on the deck, the building and the survey:
- loose-laid, with ballast or a weight on top
- bonded to the deck with adhesive
- fixed through its edges or along fixing lines
Before we name a method, we open a corner, photograph the build-up and tell you what is there.
Single-ply is not the only flat roof covering used on commercial buildings. Felt, GRP fibreglass, lead and zinc all appear, and the page on felt on commercial roofs sets one of them beside this. The covering is picked to suit the roof, and the roof is not bent to suit the covering.
Before any membrane is judged, we confirm what lies under it. A wet deck or a rotted upstand timber will fail a new sheet however well it is laid.
The same applies to insulation. A membrane laid over insulation that has soaked up water will hold the water in, and the first sign can be a stain below that looks like a leak from above.
Falls and standing water
A single-ply sheet is waterproof, but it is not meant to hold a pond. Standing water shows where the fall is wrong, where the deck has sagged or where an outlet sits too high. For flat roofs covered by a membrane on a continuous support, the current code of practice is BS 6229:2025. NFRC says it sets "a minimum 1:80 finished fall for general roof areas and internal gutters". Finished fall is the slope the roof has once everything is on, not the slope drawn on the plans.
IKO gives 1:40 as the fall to design for. That is IKO's advice and not a rule in the standard. The 2018 edition of BS 6229 was withdrawn on 16 December 2025, so older notes that cite it are out of date.
| Item | Figure | Source |
|---|---|---|
| Minimum finished fall | 1:80 | NFRC on BS 6229:2025 |
| Fall to design for | 1:40 | IKO's advice |
| Standard in force | BS 6229:2025 | Replaces the 2018 edition |
Falls are measured with a level or a water test, not by eye, because a slight fall is hard to see. Our guide to the fall on a commercial flat roof goes through that survey step by step. If water stays on a roof long after rain, we note where, and we look at the deck and the outlets before we blame the sheet.
A fall that is only just adequate when the roof is new can lose ground as the deck moves, so a second look a few years on is worth having.
Seams, upstands and the details we check closely
On a single-ply roof the field of the sheet, the open middle, may not fail alone. Joints between sheets, the line where the membrane climbs a wall, pipe penetrations and the edge trims are where the covering is cut, joined or folded, and those are the places we check closely.
- The seams between sheets, for lifted edges, open lap lines and scuffing.
- The upstand at every wall, and the flashing or termination bar that closes its top.
- Pipes, vents and rooflight kerbs, where the sheet is cut around an object.
- Outlets and gutters, for blockage and for a sheet that has pulled away.
- Edge trims and copings, where wind lifts a loose edge first.
- Foot-traffic marks near hatches and plant, where the sheet is worn or punctured.
A repair to a seam or an upstand can be a fair answer when the remaining sheet is in good order. We show you photographs of each defect on your own roof, and we say plainly if a patch is the better buy.
Where a roof has defects spread across it, patching each one stops being sensible. The sheet has reached the end of what repair can do, and replacement becomes the honest recommendation. Where one side of the roof is sound and the other is not, a part-replacement can be a way to spend less, provided the join between old and new is detailed properly.
Wind plays a part in the order of work. A loose edge or a lifted trim is dealt with first, because wind gets under a lifted edge and spreads the damage.
Rooflights, plant and foot traffic
A commercial roof is a working surface as well as a cover. Rooflights let daylight into the unit, extract fans and air-conditioning units sit on kerbs or frames, and engineers walk to them on a regular basis. Each of those adds a set of details to the membrane and a source of wear.
We look at three things around them.
- Kerbs and upstands. The sheet turns up the side of each kerb, and the top edge needs a flashing or a bar that sheds water. A kerb that has moved or rotted will not hold a seal.
- Walkways. Where people walk to plant, the sheet wears, and a separate walkway layer or tile spreads the load. A bare track worn into the sheet is a sign one is needed.
- Cable and pipe runs. Fixings through the membrane for brackets and supports are a common source of small holes, so we look for them and seal them.
Rooflights deserve their own caution. Old rooflight sheets can be fragile, and HSE says that AC roofs are always fragile. Nobody should step on a roof or a rooflight until it has been checked. Our guide to fragile roofs and rooflights explains the rules for working near them.
If plant is to be moved or added, tell us before the survey. A new unit on a membrane roof means new penetrations, and each penetration is a place the roof can leak. It is cheaper to detail them at the start than to find them later.
How long a membrane lasts
Lifespan figures for flat roof coverings come from sources that do not agree, and none is a promise. They are typical ranges for the material when it is correctly fitted and kept clear of debris. We set them side by side below and name each source.
| Covering | HomeBuilding | Less |
|---|---|---|
| EPDM | 25-30 years | 30 to 50 years |
| GRP | 25-30 years | 25 to 40 years |
| Torch-on felt | 10-15 years | 10 to 20 years |
These sources give no range for TPO or PVC sheet, so the table leaves them out. The age of the roof tells part of the story, and the condition of its joints tells the rest.
What shortens a membrane may not be age alone. Standing water, blocked outlets, foot traffic, plant moved across the surface and damage from other trades all take years off it. A roof that has been looked at once a year, with outlets cleared and seams checked, is easier to judge than one with no record at all. A planned maintenance visit each year is how business roofs can be kept in that state.
When a roof is close to the end of its life, a survey can tell you how many years of repair are left in it, and whether a new sheet over the existing one is possible or the old covering has to come off. A written record of each visit, with dated photographs, makes that judgement far easier.
Re-covering, approvals and what sets the price
Replacing a membrane is not only a roofing job. Under the Building Regulations 2010, a roof is a thermal element, so the insulation question comes with the new sheet. In England, AD L 2021 treats re-covering a flat roof in a fresh membrane as renovation. In Wales, paragraph 11.16 of the Welsh AD L makes the same point, and Table 11.1 asks for a renovated flat roof at 0.16, not worse than 0.35 where 0.16 is not feasible. Those tables are written for dwellings, so for a shop or unit with flats above, ask building control which volume applies.
On the approval itself, the two sides differ. The Welsh Government says of flat roofs: "Some repairs to flats roofs will not require an application for approval under the Building Regulations." It adds that a roof with integral insulation, once replaced, may need its thermal element upgraded. In England, the Planning Portal sets its weight trigger at "by 15 per cent or more" for the new covering. A single-ply sheet is light, so weight may not decide the matter, and the insulation and the deck matter more.
Building control is the council's service or a registered building control approver. We check which applies before the survey is turned into a price.
These roofs are priced after a survey. The price is one written total for the whole job, with the scaffold or access equipment included. What moves it is how big the roof is, the state of the deck, how the sheet is held down, the number of upstands and outlets and the access to the building.