Ask three people what a Velux window costs to fit and you will get three answers, all of them correct for a different roof. A small window that drops into an opening already in the slope is one job. A new hole cut through rafters, battens and plasterboard in a roof that has never had a window is another, and the quote reflects the difference.
This post sets out what decides the total, in the order the work happens on site: the window itself, the opening, the flashing that seals it into the covering, the access, and the finishing indoors. It also sets MyJobQuote's Velux page beside the rooflight entry from Checkatrade, each with its date, so you can see what they cover and what they leave out. Those are other people's national ranges, never our prices.
The rules on the way in differ between England and Wales, and the section on planning and approval keeps the two apart.
What decides the total for a roof window
Fitting a Velux is a small job with a lot of moving parts. The same model costs one amount on a plain tiled slope with a ladder reaching the eaves, and another on a steep slate roof above a pavement. The quote is built from the things below, and a sound one tells you which apply to your house.
- The window: its size, whether it pivots or has a top-hung sash, the glazing and the opening method
- The opening: an existing one, or a new one that means trimming rafters and building a lined recess
- The flashing kit: made to suit the roof covering, so a plain tile, a pantile, a slate and a flat roof each take a different one
- The covering itself: how much has to be lifted and put back, and whether the tiles or slates are brittle enough to need replacing
- Access: a ladder reaching the eaves, a scaffold tower or a full scaffold
- Indoors: plastering, lining, boxing in the light shaft and decorating
Notice that most of this list is the roof, not the window. The glass is what shows from inside the room, but the covering and the flashing round it decide whether the job stays dry for years.
That is why we survey before we price. We photograph the slope, the rafters from the loft and the way in, and once we have seen those things the whole job goes into a single written figure.
The published UK figures, with their source and date
National cost guides give a feel for scale, though none comes from Hereford work and none is ours. Read each figure for what it describes, because they measure different things.
| Source and date | Figure | What it describes |
|---|---|---|
| MyJobQuote, last updated 22 September 2026 | Around £100 less | A straightforward swap, since the roof already has its hole |
| MyJobQuote, same page | Around £330 | A small centre-pivot Velux with standard options and manual operation, a product price |
The middle figure is the cost of the window as a product. It leaves out the flashing kit, the labour, the access and the finishing indoors. It should never be read as the cost of having one fitted. The first figure is a difference, not a price: MyJobQuote says a swap is around £100 less than a new installation, since the hole in the roof already exists.
Checkatrade's June 2026 entry for rooflight replacement is from £1,000, a floor with the word "from" in front of it. It is a starting point, and it is quoted without VAT, so a household quote should be checked for whether VAT is in it.
When two guides disagree, or one is a product price and another a fitted price, nothing is wrong with either. They answer different questions. At the survey we answer the question about your roof and write the answer down as one figure.
Swapping an old window against cutting a new opening
A like-for-like swap takes out the old sash and frame, fits the new unit into the same recess and re-forms the flashing. The rafters are untouched and the plaster lining is already there. Our guide to swapping an old roof window goes through the steps.
A new opening is a different scale of job. The roof covering is stripped back over a patch, at least one rafter is cut and framed round with new timbers, the underlay is dressed into the recess, and a lined shaft is built from the roof down to the ceiling. Then the plasterboard is opened, a ceiling edge is formed, and the room is finished again.
Before any rafter is cut, we check from the loft what sits above and beside the chosen spot: a flue, a purlin (the horizontal timber that carries the rafters), a water tank or a run of cable. The position of the window on the slope is settled then, and not on the day with the covering already open.
Because a new opening changes the structure, the approval question comes in here:
- For a new rooflight in Wales, the Welsh Government calls Building Regulations approval something that "will generally be needed".
- In England, the first call is the council's building control team or a registered building control approver, who can say whether the frame and the rafters need an application.
On energy, the approved documents set limits for the glazing. England's Approved Document L, Table 4.2, wants a roof window to show 1.4, or WER Band B, with 2.2 as the limit for a rooflight. Wales sets matching figures in its own Table 4.1. We check the rating of the unit before we order it.
The flashing kit and the covering it seals into
A flashing kit is the set of metal pieces that seals the window into the slope. It carries rain from the sides and top of the frame over the covering below, and it must fit the profile of whatever the roof is made of. A kit for flat interlocking tiles will not seat on a slate roof, and a kit for slate will not sit on a deep pantile.
That is the reason a roofer, rather than a window fitter, deals with the junction. Our guide to flashing kits for tiles and slate sets out which fits which.
The covering also affects the labour:
- Plain clay or concrete tiles can be lifted and relaid round the frame if they are sound
- Slates are cut and nailed again, and an old brittle slate may break as it is lifted
- Stone tilestones are heavy and uneven, and each one is fitted by eye to the recess
- Any tile that breaks on the way is replaced from a matching one, which takes time to find on an older roof
If the roof is slate, a Velux can go in with the right kit and some care at the cutting.
We lift a few tiles around the old window before we quote a swap, and we photograph the battens and underlay underneath. If those are rotten, replacing them is part of the job, and you see the photograph before any extra is agreed.
Scaffold, access and a licence for the highway
A roof window high on a front slope may need a scaffold, and where the scaffold stands on the pavement, the council has to license it. Section 169 of the Highways Act 1980 means a council licence is needed wherever scaffold stands above a public pavement or a road. We arrange the licence with our scaffolder. The written quote covers the scaffold itself, so neither is left for you to chase.
Fees and notice periods are set by each council and quoted in their own units:
| Council | Published charge | Notice |
|---|---|---|
| Herefordshire (England) | £167 for a maximum of one month, £123 for each further month | At least 10 days |
| Monmouthshire (Wales) | £108 administration fee, then £27 per week to extend | At least 5 working days |
Those are two separate schemes, and a straight comparison of the figures would mislead, because one covers a month and the other is an administration fee with weekly extensions. Other councils across the border have their own rates, and Powys's are not something we quote.
Many roof window jobs need no scaffold at all. A rear slope reached by a ladder and a roof ladder, with the work done from inside the loft, can be a one-day job with no licence. The survey settles whether yours needs one, because a scaffold across the front of a terrace weighs on the total and a cost guide cannot see your pavement.
Planning rules and what a written quote should show
A roof window is normally permitted development, which means no planning application, though the conditions depend on which nation the house stands in. England normally allows it under Class C of the General Permitted Development Order. Wales draws a tighter line round conservation areas, National Parks and National Landscapes (AONBs), where a new roof light needs a full planning application, because permitted development does not reach that far. Listed houses need consent as well. Our guide to roof window planning in England and Wales goes through every condition.
Once the rules are settled, a written quote for a Velux should show:
- Whether the figure is for a swap or a new opening
- The model and size of the window, and its energy rating
- The flashing kit and the covering it is fitted to
- Whether VAT and scaffold are included
- What is done indoors, such as the lining and the plaster
- Whether old materials leave site and the roof area is swept
A figure with none of these is a guess, whoever makes it. Our price is one written total issued after the survey, accompanied by photographs of your own roof, so you can set it against another quote on the points above and not on the total alone.
For the wider picture, our Velux and skylights page covers every type of roof window and rooflight we fit, and the swap case is the simplest to price and the first to ask about.
