What a roofer should charge per hour is a fair question that has no useful answer. A roof job is priced as a job. Two roofers on the same house in the same week can quote very different totals, because they have scoped different work, priced different materials or allowed for different access.
This post therefore does three things. It lists what moves the price of a roof with pitches, a flat roof or a chimney. It gives the scaffold licence fees that each council in our area publishes, with their own units. And it gives typical UK ranges from named surveys and cost guides, each with its date and basis. No figure here is a Horizon price.
Every range below is a national figure, because the surveys behind them are UK-wide. Use them to test whether a quote sits in a sensible range; they are not a quote. Horizon Roofing Hereford gives you one total on paper once the survey is complete, and that total is the number to compare. Where England and Wales part company, each sentence names its side.
Why an hourly rate answers the wrong question
A rate per hour or per day tells you what a person costs, not what a roof costs. It leaves out how many hands the job needs, how long the weather allows, what has to be bought and what has to be hired. A roofer who quotes a day rate and then adds the days has handed the uncertainty to you.
The price you can hold someone to is a total for a defined scope. That is why we give one written total after a survey, and why a total needs a scope beside it. The scope says which slopes, which covering, which fixings and which flashings, so the figure means the same thing to both of you.
If you are comparing quotes, three questions sort them quickly:
- Do they describe the same work, slope for slope, covering for covering?
- Do they say if VAT and scaffold are inside the figure?
- Do they say what happens if the roof turns out worse than it looked from the ground?
A quote that fails the first question cannot be compared at all, however low the figure. A hand-written line saying "re-roof, one price" next to a full written scope is not two versions of the same offer.
Hidden timber can move a total. If battens or rafters turn out to be rotten once the covering is stripped, agree beforehand how that will be handled: the roofer photographs it, tells you, and puts any extra in writing before the work goes on. That way a change is a decision you take, not a bill you receive.
For a quick check of whether the territory is right, use the third-party ranges further down, with their sources and dates. For the detail of what a quote should say, our answer on what a written roof quote should cover goes through it point by point.
What moves the price of a roof job
A handful of things set a roof price. Some are about the building and some are about the rules, and a survey establishes most of them before a total is written.
| Factor | Why it moves the price |
|---|---|
| Access | A narrow terrace, a steep drive or no space for a skip means more carrying and more time |
| Scaffold | A taller house needs more of it, and one on the road needs a licence from the council |
| Covering | Stone tilestones, natural slate, clay and concrete differ in material cost and in laying time |
| Chimneys and lead | Each stack brings flashings, flaunching and its own access to reach it |
| Condition below | Rotten battens or rafters found once the covering is off add timber and time |
| Rules | Insulation and ventilation standards add work when a roof is renewed |
The last row is where the border matters. In England, a re-covered roof is renovation, and Approved Document L 2021 Table 4.3 gives a 0.35 threshold and an improved 0.16 W/(m²·K). In Wales, Table 11.1 of the Welsh Approved Document L asks for 0.16, not worse than 0.35. Both can need extra insulation to meet the figure, and a tighter number can mean thicker insulation, which can change the build-up.
None of these items is a surprise if the survey is thorough, which is the point of one. Ask the roofer which of them apply to you, and have the answer written into the scope.
Check too whether the total includes VAT and the scaffold. Which? states its figures excluding VAT, so a number in a guide can sit below a final bill that carries it. Ask the roofer to write the VAT position on the quote, and to say whether the scaffold sits inside the figure or beside it.
Scaffold licences: what each council charges
When a scaffold is erected over the pavement or on the road, the council that looks after the highway must issue a licence under the Highways Act 1980, section 169. The fee and its unit differ from council to council, so the figures below must not be compared as though the units matched. We arrange the licence with our scaffolder, and the written total says whether it is included.
| Council | Fee and unit | Notice |
|---|---|---|
| Herefordshire Council (England) | £167 covers a maximum period of 1 month; extensions £123 per month | At least 10 days |
| Worcestershire County Council (England) | £85 per week, £65 for subsequent weeks | Not stated |
| Gloucestershire County Council (England) | £145 covering 28 days at minimum; £36 per 7 days extension | Twelve calendar days minimum |
| Shropshire Council (England) | £200; the council's page gives no period | Ten working days minimum |
| Monmouthshire County Council (Wales) | £108 as an administration fee, and £27 per week to extend | 5 working days minimum |
Herefordshire Council also states a retrospective fee of £335.50 for one month, which is the reason to ask for the licence before the scaffold goes up. Worcestershire County Council adds a £25 urgency surcharge. Powys County Council runs its own scheme in Wales, and its figures are for the council to give you.
Notice matters too. Herefordshire Council asks for at least 10 days, so a start date that leaves out the licence is a start date that may slip. Ask the roofer when the application goes in and when the scaffold is due, and note that a licence runs for a stated period, so a job that overruns can mean paying for an extension.
Our answer on scaffolding on the road outside your house explains the process, and the quote ought to make clear if scaffold is counted in the total.
Repairs: typical UK ranges, with dates
For repairs, three sources give ranges you can set beside a quote. Which? surveyed 11 of its Trusted Traders in November 2025, and its prices cover labour and materials and leave out VAT. MyJobQuote dates each cost page but states no VAT basis, so none is assumed here. Checkatrade's June 2026 repair rates exclude VAT: concrete tiles at £90 to £120 per m² and natural slate at £150 to £220 per m², for a repair area of up to 3 m². The table copies each unit exactly.
| Job | Range quoted | Source and date |
|---|---|---|
| Broken or missing standard tiles, one to six | £75 to £400 | Which?, November 2025, excluding VAT |
| Put in a new ridge tile | £80 to £300 | Which?, November 2025, excluding VAT |
| Ridge tile replacement | £225 to £550 | MyJobQuote, 1 October 2026 |
| Clear all the gutters | £75 to £350 | Which?, November 2025, excluding VAT |
| Average roof repair | around £650 | MyJobQuote, 6 October 2026 |
The per m² figures in this post apply to a small repair area, and cannot be scaled up to price a whole roof.
For storms, MyJobQuote's emergency roofer page, dated 22 October 2026, puts a call-out at £150 to £300, with extensive storm damage repairs at £1,200 or more. That upper figure is for extensive damage only, not for a typical call-out.
A survey can come before any repair. MyJobQuote's roof survey page, dated 12 October 2026, puts the average at around £300, with a basic visual inspection at £100 to £200, a full roof survey at £250 to £400 and a drone survey at £200 to £350. Ask whether the survey fee is credited against the work if you go ahead.
Flat roofs, chimneys and new roofs
Beyond repairs, the published ranges spread out, because the jobs differ so much. Where two sources disagree, both are given.
| Job | Range quoted | Source and date |
|---|---|---|
| Whole roof, average three-bedroom house | £7,000 to £21,000 | Which?, November 2025, excluding VAT |
| 65 m² semi, plain concrete tiles | £10,000 to £15,000 | HomeBuilding, 30 September 2025 |
| Same semi, Welsh slate | might reach £18,000 | HomeBuilding, 30 September 2025 |
| Average new roof | around £5,250 | MyJobQuote, 3 November 2026 |
| Flat roof replacement | £1,500 to £6,000 | MyJobQuote, 20 October 2026 |
| Felt flat roof, single garage | £1,400 to £3,500 | Which?, November 2025, excluding VAT |
| Chimney breast removal | around £2,500 | MyJobQuote, 3 November 2026 |
The new-roof figures differ widely because the sources measure different things. HomeBuilding's range includes labour, scaffolding and insulation for a stated roof area, while the Which? range covers an average house, and MyJobQuote gives an average across the UK.
HomeBuilding adds that London and the South East have dearer labour, so a national average may sit above or below a Herefordshire total. A chimney lead flashing patch repair is put at around £200 by MyJobQuote, with a full replacement of it at around £570. Gutters and fascias have their own pages: MyJobQuote's gutter replacement page, dated 20 October 2026, gives an average of £1,000 to £1,600, with standard uPVC at £40 to £50 per metre, and its fascia page, dated 17 September 2026, puts capping fascias and soffits at around £800. Treat these as pointers for a conversation with a roofer, not as an offer. How long each covering lasts also shapes whether a repair or a renewal is the better buy, and our answer on how long a roof will last sets out the published lifespans.