Callout 1 of 3
A three-storey inn under slates and tiles
The survey opens with one tall building in the parish. The Royal Commission's 1931 volume on Herefordshire says of The Inn in Bridstow parish that it is of three storeys, and adds: "the walls are of brick and the roofs are covered with slates and tiles." That describes one building in 1931. It is no guide to what any other roof in Bridstow wears now, but it makes a good case study in how height and mixed coverings shape a survey.
Two coverings on one building mean a join between them, and each has its own limits. Cupa gives 20 degrees as the minimum pitch for natural slate, but only for moderate exposure, a slate 500mm long and a 115mm overlap, so a different slate or a different site changes the answer. Marley's table gives a Double Roman concrete tile 22.5 degrees for the smooth version. We read the pitch on site, then the join, then the flashing between the two. If the slates and tiles were laid by different hands in different decades, the survey records which part is which.
Three storeys put the ridge beyond a ladder. A proper survey needs a scaffold or a tower, and any scaffold that blocks the highway is licensed under section 169 of the Highways Act 1980. Because it is a domestic job, the Construction (Design and Management) Regulations 2015 apply as well. CDM regulation 7(1) hands a domestic client's responsibilities to the contractor if there is one, to the principal contractor if there are several, and, where it is agreed in writing, to the principal designer. Under regulation 15(5), where only one contractor is working, that contractor must arrange a construction phase plan as soon as is practicable, ahead of any scaffold or materials arriving at the house.
Those rules are not paperwork for its own sake. They put a named person in charge of keeping people safe at height, which is exactly where you want responsibility to sit on a tall brick building. We tell you at the start which duties are yours, which pass to us, and what the plan covers, so that nothing is left to be sorted out on the day the scaffold arrives. A short written note of the access arrangements goes with the survey report, and any change to them is agreed with you first.
Re-covering in England is tested by the Planning Portal against the building envelope and the roof, and larger jobs go to building control. Our roof inspections page describes the survey itself, from the first photographs to the written report.
Height and access
Why does a three-storey roof need more than a ladder?
A ladder reaches the eaves at best, and a proper look at the ridge, verge and stack needs a safe platform. We use scaffold or a tower, photograph from it, and the written quote includes that access.
A roof three storeys up is surveyed from a platform, never from a ladder and a guess.