01432 610152 Get a quote Call 01432 610152

Roofers in Rock

Roof repairs and re-roofs in Rock, starting at the gutters and following the water up.

Each defect gets a photograph where it sits, and the figure you receive is one written total, issued after the survey ends.

Get a free quoteCall 01432 610152

A Grade I church and Grade II cottage

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    A parish of 2,672 residentsThe 2021 Census counted 2,672 usual residents in Rock parish.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Saint Peter and Saint PaulThe church is listed Grade I, entry 1100696, first listed on 25 February 1958.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Church Cottage Church HouseChurch Cottage Church House is listed Grade II, entry 1348306, from 20 October 1952.

Where Rock lies

Rock on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Rock roofs, gutter to Grade I

Following the water through a Rock roof, from gutter to church wall

The first callout is the gutter line, where water leaves the roof; the second is the roof window, an opening that brings planning and insulation rules into play; the third is the listed church and its neighbouring cottage.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Eaves line; 2 Roof windows; 3 Church and cottage.

Fig. 1 A Rock roof in section, from gutter to roof window to listed wall.

Callout 1 of 3

Gutters, fascias and the eaves line

At the bottom of a slope, the eaves, rainwater passes from the covering into the gutter, which carries it to a downpipe. Brett Martin advises a fall of "1mm for every 600mm", so a 6 metre run drops just 10mm along its length. That is too slight to judge by eye, which is why the survey pours water into the gutter and watches where it pools. A pool points to a sagging bracket, a joint that has opened or an outlet silted up with leaf mould, and each one is photographed for the report.

A fascia is the board fixed across the rafter ends, with the gutter screwed to it, and a soffit closes the gap under the overhang. For buildings built or refurbished before 2000, HSE's line is to "assume that there is asbestos in it", and asbestos insulating board (AIB), sometimes used for white soffits, is one place it can sit. AIB is usually licensed work to lift, so a licensed firm does the lifting. Asbestos cement is a different material: HSE places careful removal that avoids breaking it up in the non-licensed category, and says such roofs are "always fragile". Nobody walks on one, and waste from the job leaves in a skip that locks, not an open one.

Where a board has rotted behind a gutter, the rafter ends beneath it are checked, since decay travels in from the edge. If they are sound, new boards go on, and a vented soffit lets air into the roof space. Plastic, timber and aluminium boards each have their place, and the choice follows the house: a painted timber fascia can suit an older cottage, and a capped board can suit a house that has been re-fascia'd before.

Slipped tiles on the lowest course are noted on the same visit, since they sit right above the gutter. Gutter profile matters less than gutter fall: a half-round, square or ogee section works if the run is true and the outlets are clear, so the profile already on the house is matched. A bracket that has sagged is re-set at the right spacing, and a joint that has opened is re-sealed or the section replaced. The guttering, soffits and fascias page sets out the full range of boards and gutter profiles, and every board we replace is photographed before and after.

The eaves line on a Rock house

Gutter run
Fall tested with water, joints and brackets checked
Fascia
Board that carries the gutter, probed for rot
Soffit
Board under the overhang, vented where it is renewed
Rafter ends
Looked at where a board has gone soft
Downpipe
Cleared, and its joints watched under flow

Level to the eye can still be wrong for water, so the gutter is tested with water.

Fig. 2 Gutters and downpipes, drawn close

Callout 2 of 3

Roof windows: insulation figures and planning questions

A roof window is fitted flush with the slope, and a new one means cutting through rafters and battens. Regulation 2 of the Building Regulations 2010 leaves roof windows out of its list of thermal elements, saying a thermal element "does not include windows, doors, roof windows or roof-lights". That is why a roof window is judged against its own figure and not the figure for the roof around it. Table 4.2 of AD L 2021 gives a roof window 1.4 or WER Band B, a rooflight 2.2 and a new roof element on an existing home 0.15.

Rock is in England, so those are the figures that apply here. Until 24 March 2027, AD L 2021 governs; from then, AD L 2026 Table 3.2 carries the same values. Renovation of an existing roof, loft conversions included, is measured on a different table, so the insulation depth is worked out before the window position is fixed, not afterwards. A window that is cut into a slope also needs a flashing kit matched to the covering, and trimmers (the small timbers framing the opening) to carry the rafters that have been cut. A window cannot be placed over a chimney breast, a hip or a valley without extra framing, so the position is marked out in the loft and again on the slope. Where a window replaces an older one, the frame and flashing are matched to the opening, and the old unit leaves with the rest of the waste.

Planning is the other question. Whether a roof window needs permission depends on the house, the slope and the designation of the land, and the planning guide for roof windows sets the conditions out in full. Check with Wyre Forest District Council, the planning authority for Rock, if your house is listed or you are unsure about its status.

Fitting is only part of the story. We look at the window you already have, because a leaking unit may need a new flashing rather than a new window, and the cheaper repair is the honest one. The skylights page covers swaps, new openings and Velux-type units.

Insulation question

Does a roof window need the same insulation figure as the roof around it?

No. The window has its own target, 1.4 or WER Band B; a rooflight has 2.2 to meet; and a new roof element on an existing home has 0.15 to meet. The survey notes which of the three your job involves.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

The church, Church Cottage and the council

The Church of Saint Peter and Saint Paul is listed Grade I (National Heritage List entry 1100696, first listed 25 February 1958), and Church Cottage Church House is listed Grade II (entry 1348306, first listed 20 October 1952). A listed building needs consent under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 for any works touching its special character, and the cottage's roof is covered by that. A church is different. Rock's Grade I church, the one listed under entry 1100696, is Anglican: its A Church Near You page lists a monthly family service at 11am and Communion, usually at 9.30am, on the fourth Sunday. Being in use, its roof answers to the faculty jurisdiction rather than to listed building consent, and those who look after the church are the first people to ask before a roofing quote. Because the church and the cottage carry different listing grades, each is treated as its own job, and the report is written so that it can be read by someone who has never stood on the site.

Wyre Forest District Council is the authority that can say whether your street falls in a conservation area. Check whether an Article 4 direction applies with Wyre Forest District Council too. Listing does not remove permitted development, but consent is needed in addition.

Building control for a Rock address comes from North Worcestershire Building Control, shared by the Bromsgrove, Redditch and Wyre Forest councils, or from a registered building control approver. Where scaffolding will stand on the carriageway or pavement, Worcestershire County Council's guidance for householders says the contracted firm is "required to apply for licences"; the charge is listed in the questions below.

A listed roof is recorded before and after. Pictures of the ridge, the abutments and the gutter line go to the council along with the repair proposal, which lets the council weigh the proposal against the actual building. Older cottages bring chimneys into the same visit: the pointing, the flaunching and the lead around the base of the stack are photographed alongside the roof itself. Our listed and heritage roofing page describes the method for protected buildings in full.

What sets the price of work near a listed church

Access
Height of the eaves and where the scaffold can stand
Consent
The time needed to agree the scope with the council
Materials
Matching the old covering or using a modern equivalent
Condition
What the opened roof shows below the covering

One written total price, never itemised.

Rock roofs: eaves, asbestos, roof windows and licences

What does a survey check along the eaves of a Rock house?

It starts with the gutter fall, which we test with water, then bracket spacing, joints and outlets. After that come the fascia and soffit boards, probed for rot, and the rafter ends where a board has gone soft. Slipped tiles on the lowest course are noted too. Every finding comes with a photograph, so the stained board or open joint is there for you to inspect.

Could the white soffits on a Rock house contain asbestos?

They could. For buildings built or refurbished before 2000, HSE's line is to "assume that there is asbestos in it", and in its words asbestos cement roofs are "always fragile". Soffit boards made of asbestos insulating board need a licensed firm for removal in the usual case, so that job is handed on. Until the material is identified, nothing is drilled, sanded or broken, and the survey records what it sees.

Does a new roof window in Rock need building control as well as planning?

Both questions can arise. The planning side is explained in the guide linked above, because it turns on the house and the land. On the building side, a roof window must reach 1.4 or WER Band B in AD L 2021, Table 4.2, and cutting into the roof structure brings in building control, which for Rock is North Worcestershire Building Control or a registered building control approver.

Who decides what can be done to the roof of a church in Rock?

The Church of Saint Peter and Saint Paul is listed Grade I, entry 1100696, and is Anglican. With services still held, a faculty from the diocese authorises roof work there, and Wyre Forest District Council's listed building consent is not needed; closure for worship would reverse that. Talk to whoever looks after the church first, ahead of any roofer. Once that is settled, the roof is surveyed, photographed and written up for whoever decides.

How much is the scaffold licence for a Rock roof job?

Worcestershire County Council licenses scaffolds on the county's roads, and it charges £85 per week, then £65 for subsequent weeks, with a £25 urgency surcharge for urgent applications within 2 days. Worcestershire County Council's guidance names the contracted firm as the party "required to apply". The licence is a matter of section 169 of the Highways Act 1980, and the quote we write covers the scaffold.

What are the published figures for replacing gutters?

MyJobQuote averages £1,000 to £1,600 for gutter replacement, usually £40 to £50 per metre for standard uPVC gutter, and puts capping fascias and soffits at around £800 on average. Those are ranges drawn from other houses, and a rate quoted per metre is not a total, so it is not multiplied by the length of your run. Once the survey is done, a Rock roof gets a single written price covering the work, the waste and the clear-up.

A Rock roof surveyed from the gutter up

Tell us if the trouble is at the eaves, on a slope or around a roof window, and the survey begins in that spot.

10-year workmanship guarantee, in writing