01432 610152 Get a quote Call 01432 610152

Roofers in Orleton

Roof repairs and re-roofs for Orleton, 18.4 road miles north of Hereford.

Our survey opens on the ridge and the chimney stacks, and ends with a set of pictures and the price in writing.

Get a free quoteCall 01432 610152

A village roofline inside its conservation area

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridges on older housesRidge tiles loosen, and open joints let rain in at the very top.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Stacks above the slopesChimneys stand clear of the roof, so their lead and pointing take the weather.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Listed buildings close byGrade I and Grade II* listings mean repairs are agreed before work starts.

Orleton on our coverage map

Orleton on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Orleton roofs, ridge to conservation area

Orleton read from the skyline: ridge capping, stack lead and conservation area rules

A survey here goes top-down in three stops: the ridge and hips, the chimney stacks and the lead around them, then the village's older buildings and the consents that come with a conservation area.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge capping; 2 Stack and lead; 3 Village buildings.

Fig. 1 Orleton roof in section, with the ridge, the stack and the framed wall edge numbered.

Callout 1 of 3

Ridges and hips on tile, stone and slate roofs

The highest line on any house is where weather does its first damage, so the survey climbs to the ridge before anything else. In Orleton parish the Royal Commission's 1934 Herefordshire inventory described the monuments it listed as dating to the 1600s, two floors high and timber-framed, giving their roofs as "tile, stone or slate-covered". Three different coverings are named there, and each wants its own ridge: clay or concrete capping on tile, a bedded stone or a lead roll on stone, and a bedded capping or a lead roll on slate.

Capping stays on only while its fixings hold. A capping tile is traditionally bedded in mortar, and mortar cracks as the roof moves through winter and summer. Marley, the tile maker, puts the rule this way: "Installing to BS 5534 isn't required by law", yet the 2015 amendments made it clear that mortar "could no longer be relied upon as the only means of securing the roof covering". Mortar is not banned. Each capping tile also gets a mechanical fixing, and where a roof has been dry-fixed, BS 8612 is the specification that governs the clips and screws.

Hips get the same attention. On a hipped roof the hip runs down the outside corner where two slopes meet, and it is bedded and capped like a ridge, with an end tile at the foot. Lifted hip caps can show as a thin dark line down the plaster inside a bedroom. We lift the loft hatch and trace any stain upward, so that the repair goes to the true source and not the place where the drip lands.

Pitch decides which covering a roof can carry. Marley's minimum pitches run from 12.5 degrees for its Mendip 12.5 concrete tile up to 40 degrees for its Canterbury clay tile, and the data sheet of the tile in question always has the last word. The survey measures the pitch before anyone talks about changing a covering.

Where the covering beneath is sound, a rebedded ridge counts as a repair and nothing larger. The Planning Portal lists a new covering that "increases the weight of the roof covering by 15 per cent or more" as a trigger for Building Regulations approval, which is why a change of material is checked for load first. Our roof repairs page lists the smaller jobs a survey can lead to.

Checked along an Orleton ridge

  • Capping that moves under a gloved hand
  • Mortar joints that have crazed or dropped
  • Clips or screws fixing each capping tile
  • End tiles at the foot of each hip
  • Stains in the loft below the line

Rebed the ridge on a sound roof and you have bought years, without a new roof.

Fig. 2 The ridge, drawn close

Callout 2 of 3

Chimney stacks, soakers and party wall notices

A stack stands proud of the roof on every face, so it takes wind and driven rain from whichever direction the weather arrives. The survey reads it from the pots down: the flaunching, which is the mortar cap, shaped to throw water off, that grips the pots, then the pointing between the units, then the lead where the stack leaves the slope. Pointing and flaunching are cheap to renew while they are only crumbling, and costly once frost has got into the brick or stone behind them.

Lead does the sealing. A flashing has its upper edge let into the stack's mortar, with the rest turned out to lap the covering; soakers are bent lead tabs, one for each course, hidden under the covering alongside the brickwork. In the Royston Lead brochure every thickness carries a code and a use: Code 3 is "Recommended for lead soakers only", while Codes 4, 5 and 6 are listed for flashings. The code goes in the report so the repair can be checked afterwards. MyJobQuote says correctly installed lead flashing "can last for over 80 years", and where the lead has simply lifted we re-dress it in place instead of replacing the lot.

Removing a stack is another job altogether. A chimney breast is the part inside the house, and the Planning Portal says that approval under the Building Regulations always applies when a breast is taken out. If that breast is in a wall you co-own with the neighbour, the Party Wall etc. Act 1996 makes the building owner send written notice first, and the shared wall then stays uncut for at least two months afterwards. No surveyor is appointed unless the neighbour dissents or fails to reply within 14 days.

What drives the price of a stack job is plain enough: the height, the access, the number of pots, how far the masonry has perished and whether the lead is renewed or re-dressed. Scaffold for a tall stack can stand on a verge or a lane. We arrange the licence with our scaffolder, and Herefordshire Council asks for applications at least 10 days before the scaffold is placed. Our chimney repairs page covers repointing, rebuilding and capping in more depth.

From pot to slope on an Orleton stack

Pots
Seated firm in the flaunching, with no rocking
Flaunching
Sloped mortar collar, free of cracks and gaps
Pointing
Raked out and refilled where joints have opened
Flashing
Lead lapped over the covering and wedged in
Soakers
One under each course, in a suitable code

Lead that has only lifted is dressed back into the joint, not smeared over with sealant.

Fig. 3 Chimneys, drawn close

Callout 3 of 3

Orleton's conservation area, manor and Grade I church

The third callout turns from the roof to the village around it. Herefordshire Council designated Orleton's conservation area in 1976, and several of the buildings inside and around it are listed. The Church of St George is Grade I (list entry 1349873, first listed 11 June 1959), Orleton Manor is Grade II* (list entry 1081810, first listed 11 June 1959) and Woodcote is Grade II (list entry 1167404, first listed 11 December 1987).

Two sets of rules sit over a roof like that. For a listed house, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 means works touching its special character need listed building consent, and the house keeps its householder rights as well. Inside a conservation area the question is planning permission. A dormer is the usual sticking point inside the Orleton conservation area, so Herefordshire Council sees one first, and re-covering in kind is another matter. Our planning guide for roof windows sets out the conditions before you draw anything.

Check whether an Article 4 direction applies with Herefordshire Council. Such a direction strips back permitted development for a defined area. A like-for-like repair, a slipped tile or a rebedded ridge is not what most of these rules are aimed at, but the council gives the answer, and a call before the scaffold goes up costs nothing.

St George's is held by the Church of England, and while services continue there roof work goes through the faculty jurisdiction, not through the council. That is a different route from a house or a barn. We pass the applicant our survey photographs and a method statement for the covering and the lead. Building control for any Orleton address is Herefordshire Council Building Control, reachable by email on bce@herefordshire.gov.uk, and a registered building control approver is an alternative. Our listed and heritage roofing page shows how a protected building is handled.

A call to the council before the scaffold goes up settles most questions at the earliest point.

A timber-framed gable and its verge

SoundVerge tight to the frame, lead and mortar intact
Needs workVerge lifted, timber stained, gap along the framing

Orleton roofs: ridges, stacks and consents

Which roof repairs in Orleton's conservation area need the council's say?

Mending like with like may not raise a planning question, but a change of covering, a dormer or a new window needs a check with Herefordshire Council first. Orleton is a conservation area, designated in 1976 according to the council's own list, and Herefordshire Council can say whether an Article 4 direction applies to your street. If your house is also listed, listed building consent comes into it as well.

Can a chimney breast come out of an Orleton house?

It can, but approval is needed. The Planning Portal says that "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." If the wall is shared, the building owner serves a party wall notice, which lets the owner next door sit on it for at least two months before a brick is cut. A listed house also needs consent. We cap and flash the stack, and a structural engineer's view on the breast can be wise.

What counts as a storm when an Orleton roof is damaged?

The Financial Ombudsman Service says "a storm usually involves violent winds, usually with rain, hail or snow", and that "Rain, hail or snowfall by itself can constitute a storm". Its assessors usually turn to "expert reports and photos". Before any permanent repair, tell the insurer, have the roof made safe, and keep each photograph and receipt. We photograph the damage and write up what we find, but the claim is between you and your insurer.

What fixes a loose ridge tile on an Orleton roof?

A loose capping tile is rebedded in fresh mortar and given a mechanical fixing, since Marley notes that mortar by itself is no longer a dependable way to secure the covering. Where the ridge is dry-fixed, BS 8612 covers the system. MyJobQuote gives £225 to £550 as the 2026 average for replacing ridge tiles, and length and access move the figure. Our survey photographs each tile, so you see what has failed.

Does roof work on St George's church in Orleton go to the council?

No, since the building is still in use for worship. St George's is listed Grade I and held by the Church of England, so work to it goes through that church's faculty system. A building that has closed would need listed building consent from Herefordshire Council. Survey photographs and a method statement go from us to whichever body applies; the application is theirs.

How long should an Orleton tile or slate roof last?

Lifespans are typical ranges, never promises. Marley expects roof tiles to last around 60 years, while HomeBuilding gives plain concrete tiles 40 to 50 years. The BRE's 60-year minimum is for clay only. HomeBuilding puts Welsh slate at "100+ years". A stone-tiled slope is judged on the condition we find at the survey. Upkeep counts as much as the material, so a slipped tile or an open ridge joint is best put right before rain reaches the battens.

Ask for a ridge-down survey in Orleton

Tell us where the trouble shows, or attach a picture; a survey follows, and the price comes back written down as one total.

10-year workmanship guarantee, in writing