01432 610152 Get a quote Call 01432 610152

Roofers in Onibury

Flat roof, outbuilding and roof repairs in Onibury, 28.8 road miles north of central Hereford.

Roughly 40 minutes behind the wheel. Farm and house roofs get the same survey: every fault photographed, one written total.

Get a free quoteCall 01432 610152

A listed station, church and farm barn

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Onibury Station and Platform RoomsA Grade II listing, so roof work there needs consent from Shropshire Council.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    Barn by Onibury FarmhouseGrade II; sheeting on farm outbuildings has to be identified before it is touched.
  • Newer homes with grey concrete tile roofs along a curving estate road
    St Michael's church, Grade II*Listed 1954; Anglican, so its roof goes by faculty while in use.

The Onibury area

Onibury on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

Onibury roofs, from outbuilding sheets to the station

Onibury surveyed: outbuilding sheets, flat roofs and the listed station and church

The read starts with the sheeting on outbuilding slopes, turns to flat roofs on extensions, and ends at the listed station building, the barn and the Grade II* church.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Outbuilding slopes; 2 Flat roofs; 3 Listed buildings.

Fig. 1 Farm and house roofs cut open: sheet slope, flat deck and wall head.

Callout 1 of 3

Outbuilding slopes and sheets that may be asbestos

A farm in Onibury parish can have a house, a barn, a garage and a run of lean-to sheds, each with a roof of its own. The long plain slopes of the outbuildings may be covered in tile, slate, metal or corrugated sheet, and a corrugated sheet may be asbestos cement. You cannot tell by eye. HSE's advice, for any building of pre-2000 build or refurbishment, is to assume asbestos is present, and its guidance says "AC roofs are always fragile", meaning a person can fall through them. So the first job on any sheeted roof is access: a tower or platform beside it, never a walk across the sheets.

What happens next depends on the condition of the sheets. HSE lists asbestos cement as non-licensed work when it is handled with care and lifted out unbroken, and that includes weathered sheeting that is not otherwise badly damaged. Sheets that are badly damaged or broken, or a roof that would have to be dropped in pieces, fall under notifiable non-licensed work, which brings extra duties. A sample goes for identification before a drill or saw is used, so nobody cuts a sheet that turns out to be asbestos.

The house roof itself gets the survey we give any pitched roof: ridge first, then the verges, valleys and slopes, with the loft checked from inside. Each fault is photographed for the report, which closes with a single written price.

Asbestos waste is not household waste. GOV.UK exempts a householder from consignment notes for moving domestic hazardous waste "other than asbestos waste", which puts asbestos from a roof job outside that exemption. HSE says to use a lockable skip, and a sheet thrown over a standard skip is not good enough. The lockable skip is arranged by us and sits inside the one written total.

The barn about 20 metres north-north-west of Onibury Farmhouse is listed Grade II (list entry 1269846, first listed 21 June 1996), and Onibury Farmhouse is Grade II (list entry 1269845), first listed on that same June day. Under section 7 of the 1990 Act, a covering swap on a listed barn cannot go ahead on a builder's say-so. A different covering changes the look of a long slope, so it is agreed with Shropshire Council before it is priced. Our commercial roofing page covers buildings larger than a house.

Sheeting on an Onibury outbuilding

Can I tell by looking whether a barn sheet is asbestos cement?

No. Corrugated sheets of different materials look alike from the ground. HSE advises assuming asbestos in a building erected or refurbished before 2000, and a sheet we cannot identify is treated as asbestos until it has been tested.

On a roof of unknown sheet, the first question is how to get up, not how to fix it.

Fig. 2 The slopes, drawn close

Callout 2 of 3

Flat roofs, falls and how long a covering lasts

Extensions, porches and garage tops can be flat-roofed, and a flat roof is never perfectly flat. Instead it has a fall built in, a gentle slope towards the outlet that sends water away. NFRC reads BS 6229:2025 as setting "a minimum 1:80 finished fall", and IKO advises designing for 1:40. The standard concerns flexible membranes. A roof that holds a pond after rain has lost some of its slope, and the pond is the first thing we photograph, together with the outlet it should be draining to.

The covering decides the life. For felt, HomeBuilding gives "10-15" years and Less gives 10 to 20. EPDM, a synthetic rubber sheet, is "25-30" years with HomeBuilding and 30 to 50 with Less. GRP, glass-reinforced plastic laid as a one-piece shell, is "25-30" with HomeBuilding and 25 to 40 with Less. The sources disagree because installation and upkeep matter as much as the material, so read each as a range, never a promise.

The weak points are the upstands, where the covering is carried up a wall or kerb, together with edge trims, outlets and anything that pierces the surface, such as a flue or a rooflight. We check each one, look for blistering or a lifted seam and press the deck for soft boards underneath. AD L 2021 names "Replacing the waterproof membrane on a flat roof" as renovation, so Table 4.3 applies, with a threshold of 0.35 and an improved figure of 0.16. Paragraph 4.13 accepts the lowest feasible figure if 0.16 cannot be reached, or if the payback would exceed 15 years.

A flat roof over a heated room also needs a plan for condensation. Whether the insulation sits above or below the deck decides where moisture can collect, and that build-up is settled at the survey, not guessed. Where a flat roof has already leaked into the room below, the ceiling and the joists are looked at as well as the covering, since a stain can sit some way from the hole. Our flat roofing page sets out membranes, falls and edge details.

What sets the price of an Onibury flat roof

Covering
Felt, EPDM or GRP each carries different labour
Roof area
Size of the deck and the length of its edges
Deck condition
Whether boards below need renewing first
Insulation
The build-up chosen above or below the deck
Access
Height of the roof and whether scaffold is needed

One written total price, never itemised.

Fig. 3 Flat roofs, drawn close

Callout 3 of 3

The station rooms, the barn and the church

The wall head is where a roof ends on masonry and the lists begin. Three of the listed buildings round Onibury show how different the routes can be.

  • Onibury Station and Platform Rooms, Grade II (list entry 1269850, first listed 21 June 1996): listed building consent from Shropshire Council for works that change its character.
  • The barn near Onibury Farmhouse, Grade II (list entry 1269846): the same consent, since a listing leaves permitted development rights in place and adds it.
  • St Michael's church, Grade II* (list entry 1269840, first listed 12 November 1954), an Anglican building: a faculty, so long as services continue.

Ecclesiastical exemption is the name for the church's position. A church still used for worship stays outside listed building consent when its owner is the Methodist Church, a Roman Catholic diocese, the United Reformed Church, or a Schedule 1 trust corporation holding it for a Baptist Union church, or when it falls under the Church of England faculty jurisdiction. Listed building consent applies to the rest, from Quaker and Unitarian meeting houses to closed churches and those in Churches Conservation Trust care. Onibury's church sits in the first group, under Anglican faculty rules, and its churchwardens are the people to speak to before a ladder goes up.

A barn roof void is also a possible home for roosting bats and nesting birds. GOV.UK says "All bat species, their breeding sites and resting places are fully protected by law", and Natural England is where a licence comes from in England. Before a sheet or a slate is lifted we look in the void and along the eaves, and whatever turns up, we talk it through with you before work resumes.

Shropshire Council records a conservation area named Onibury, and the council can say whether a given address sits within its boundary. Check whether an Article 4 direction applies with Shropshire Council as well. The Shropshire Hills designation extends over some of the ground round Onibury. It does not decide planning, because the council does, and under English rules it weighs on an Onibury dormer, which goes to Shropshire Council first. The limits on a window set in the slope are in our planning guide for roof windows.

For building control, Shropshire Council Building Control answers on 01743 258710, and a registered building control approver may act in its place. Our listed and heritage roofing page shows how we plan around a protected building, from survey to finished roof.

A wall head under an Onibury roof

SoundJoint tight, lead or mortar seated, masonry dry below
Needs workOpen joint, lifted flashing, damp patch on the wall face

Onibury sheets, flat roofs and listings answered

Are the corrugated sheets on an Onibury farm outbuilding made of asbestos cement?

From the ground you cannot tell. HSE says to assume asbestos where building or refurbishment came before 2000, and that AC roofs are always fragile. Weathered sheets lifted out carefully and whole are non-licensed work, whereas badly damaged or broken sheeting is notifiable non-licensed work. A suspect sheet goes for identification first, access is by tower or platform, and any waste goes in a lockable skip.

What slope does a flat roof over an Onibury extension need?

NFRC reads BS 6229:2025 as setting a minimum 1:80 finished fall, and IKO advises designing for 1:40. The standard concerns flexible membranes and not lead. A pond lying on the roof after rain shows that some of the slope has gone, and at the survey we photograph it along with the outlet, so the repair can restore the fall and not only patch the covering.

How long should a flat roof on an Onibury house last?

The sources differ. HomeBuilding gives felt 10-15 years, EPDM 25-30 and GRP 25-30. Less gives felt 10 to 20 years, EPDM 30 to 50 and GRP 25 to 40. Treat every figure as a spread for the material, not an undertaking, because workmanship and upkeep move the figure. At the survey we say what the roof in front of us needs, and a repair is offered when it is the better buy.

Does the barn near Onibury Farmhouse need listed building consent for a new roof?

The barn is Grade II (list entry 1269846, first listed 21 June 1996). Section 7 of the 1990 Act applies to any work that would change a listed building's character, and a new covering on a long barn slope changes how it looks. That means listed building consent from Shropshire Council before work is priced. A repair in the existing material is worth raising with the council too.

Can I cancel a roof contract signed at home in Onibury?

Regulation 30 of the Consumer Contracts Regulations 2013 gives a contract signed at home after our visit a 14-day cancellation period. Work can start inside that window only on your request, made in writing on a durable medium. A visit you specifically requested for an urgent repair carries no cancellation right (regulation 28(1)(e)). Citizens Advice runs a consumer helpline on 0808 223 1133 if you want advice before signing.

What does the Grade II* listing of St Michael's church mean for its roof?

St Michael's is listed Grade II* (list entry 1269840, first listed 12 November 1954). Being Anglican, it falls under the faculty system for roof work during any period of worship, and Shropshire Council's listed building consent stays out of it. If it ever closed, the council's consent would be needed instead. A word with the churchwardens comes before anyone prices the work.

What roof is giving trouble in Onibury?

Tell us whether it is a house, an extension or an outbuilding, and the survey ends in a written total.

10-year workmanship guarantee, in writing