01432 610152 Get a quote Call 01432 610152

Roofers in New Radnor

Roof repairs and re-roofs in New Radnor, from slate ridges to farm-building gutters.

New Radnor lies 25.7 miles by road north-west of central Hereford, about 40 minutes' drive. A survey here closes with a single written total.

Get a free quoteCall 01432 610152

What New Radnor's listings ask of a roof

  • Older cottages with weathered clay tile roofs and brick chimneys behind a flint wall
    Ridge stack on Church StreetNo. 12 Church Street (Grade II) has a ridge stack and an end stack.
  • Slate roofs and chimney stacks along a red brick Victorian terrace
    A conservation area at the centreThe centre of New Radnor is a conservation area under Powys County Council.
  • Newer homes with grey concrete tile roofs along a curving estate road
    Weatherboard and slate farm rangeA Grade II farm range at Brookside Farmhouse is recorded with a slate roof.

New Radnor on the area map

New Radnor on a street map, with a dashed circle around the town and the nearest towns we cover. Tiles © Esri; map data © Esri, HERE, Garmin, OpenStreetMap contributors.

New Radnor roofs, ridge to gutter

Ridge stacks, a conservation area and farm gutters: a New Radnor roof in three callouts

A survey here starts on the ridge, where Church Street's brick stacks stand. It then turns to what the conservation area and the Welsh rules mean for a roof window, and ends at the gutters of a weatherboarded farm range.

A drawn cut-away section through a Herefordshire border house: the front of the main roof is cut open to show the rafters, underlay, battens and slates, beside a black-and-white timber-framed gable. Numbered, from the ridge down: 1 Ridge, stacks; 2 Roof windows; 3 Farm range eaves.

Fig. 1 A New Radnor roof cut open, with ridge, window and gutter numbered.

Callout 1 of 3

Ridge stack and end stack on Church Street

Cadw's listing description of 12 Church Street (Grade II, Cadw record 9371) records: "Slate roof, brick ridge stack to right of centre, left end stack, rubble with three diagonally-set brick uppers with oversailing courses". That is two stacks, and one of them stands on the ridge itself. It shapes the survey, because a stack on the ridge line interrupts the capping tiles, and the caps either side must finish cleanly against the brick.

Capping tiles are the ones that straddle the top of the roof. Each cap sits on a mortar bed or on a dry-fix clip, and in both cases we rock it by hand and press along the joints for crumbling. Marley's tile guidance states that installing to BS 5534 "isn't required by law", and on mortar it says the material "could no longer be relied upon as the only means of securing the roof covering". Mortar is not banned. A mortar bed by itself is simply no longer trusted to hold a cap through winter gales, so a rebedded ridge here gets a mechanical fixing too.

The listing's oversailing courses are rows of brick that step out beyond the row beneath. They throw rain clear of the shaft, and a joint that opens up there can let a brick work loose. We look at them from a ladder or a scaffold, photograph what we see and tell you whether any brick should come down and be relaid. An end stack grows out of a gable wall, so the lead along its slope side needs the same scrutiny as the ridge caps beside the ridge stack.

Where one failing stack or a short length of ridge is the whole problem, the repair is a small job and the report will describe it as one. Our roof repairs page explains how smaller jobs are run, from the first photographs to the clearing of the site afterwards. Skipping straight to a new roof would cost you far more than the fault deserves. A photograph taken along the ridge shows each cap in turn, so you can judge the repair against the picture and not against our word alone.

Ridge and stack details we record

Capping tiles
Rocked by hand; loose caps marked in the photographs
Ridge mortar
Crumbled, cracked or missing joints noted
Fixings
Whether each cap is held mechanically as well
Stack courses
Oversailing brick tapped for movement
Lead at the stack
Seen on all faces, split or lifted runs marked

A stack on the ridge line changes how the capping has to be finished.

Fig. 2 The ridge, drawn close

Callout 2 of 3

The conservation area, roof windows and Welsh consents

The middle of New Radnor lies in a conservation area held by Powys County Council. In Wales these areas come from Part 4 of the Historic Environment (Wales) Act 2023, and the boundary decides which planning rules reach a roof. Look up your address with the council, and put the Article 4 question to it too, because such a direction removes some permitted development rights across the area it names.

The distinction that matters most is between repair and a fresh opening. Mending a slate roof so that it looks as it did is one thing. Cutting a roof window into the slope is another. Welsh permitted development rules do not allow a new roof light on land such as a conservation area, a National Park or a National Landscape, so a window there needs planning permission. Our planning guide for roof windows carries the Welsh conditions, so read it before you draw anything. A written answer from the council is worth keeping with the house papers.

Planning is only half of the picture. The Welsh Government says that "Approval under the Building Regulations will generally be needed for the installation of a new rooflight", so building control is a second step. In the Welsh Approved Document L, the worst acceptable figure for a roof window put into an existing house is WER Band B or 1.4, and rooflights are held to 2.2. The council's building control service or a registered building control approver can give that approval, and we ask which you prefer before a window is ordered.

Listing adds a third layer. 12 Church Street is Grade II, and section 88(2)(a) of the 2023 Act, in force since 4 November 2024, covers "works for the alteration or extension of a listed building in any way that would affect its character as a building of special architectural or historic interest". Section 89 supplies the consent. Cadw's record shows the roof as slate. Like-for-like repair keeps that look, whereas a new opening in the slope is the sort of change a council will want drawn first. For protected houses we follow the approach described under listed and heritage roofing.

Before a New Radnor roof window

Does a conservation area stop us repairing a slate roof?

A repair that keeps the existing look is a different matter from cutting a new opening. Check your address with Powys County Council first, along with any Article 4 direction, and we shape the plan around what the council tells you.

Fig. 3 Roof windows, drawn close

Callout 3 of 3

Gutters and weatherboard on a Brookside farm range

Part of the L-plan farm range north-east of Brookside Farmhouse is Grade II (Cadw record 9234, designated 29 April 1993). Cadw's listing description of that part records: "Weatherboarded skin, slate roof". A second part of the same range (record 9233) carries the same grade and date. Timber boards on the walls and slate above them make the eaves the spot to examine, since roof and cladding meet there.

A gutter at the eaves has a simple job and fails in simple ways. A sagging run holds water where it should pass it on, a joint weeps and stains the boards under it, or a blocked outlet lets the overflow slide down the wall. Brett Martin's guidance on falls is "1mm for every 600mm", and a run that has slipped below that line will stand with water in it. On a weatherboarded wall the harm shows up as dark, soft boards just beneath the eaves, so we press the lowest boards with a screwdriver tip and photograph any that give way.

An L-shaped building has an inside corner. If the two wings meet there with a valley between them, that valley gathers run-off from two roofs into one channel, and it is the first place we search for debris, slipped slates and failing lead. A long range may need a long scaffold, and where it has to stand on public road or verge, section 169 of the Highways Act 1980 calls for a licence. We arrange the licence with our scaffolder, and the single total on your quote takes the scaffold in.

A farm building may be a working structure as well as a listed one, so the survey also asks what the range is used for today. Gutter replacement has its own page under guttering, soffits and fascias. Should the range be listed and its covering need replacing, the previous callout's consent steps come first, with the council's answer kept on file beside the survey photographs.

On a clad wall, a leaking gutter joint shows in the boards first.

Gutter run at a clad eaves

SoundFall carries water out, joints dry, brackets firm
Needs workSagging run, weeping joint, soft boards beneath

New Radnor roofs: stacks, windows and farm ranges

How is a brick ridge stack on a New Radnor slate roof repaired?

We start from the capping tiles either side and work into the brick. Loose or hollow-sounding units are taken down and relaid, open joints are repointed, and split lead at the junction with the slate is renewed. Every face of the stack gets a photograph, so you see the fault before agreeing anything. If the brickwork passes and the lead alone has gone, the report will recommend a lead repair and nothing larger.

Is a roof window possible in the New Radnor conservation area?

Only with planning permission, since a new roof light is not permitted development on conservation area land in Wales. Begin by checking your address against Powys County Council's own conservation area list, and put the Article 4 question to the council at the same time. If the house is listed, listed building consent is needed as well. Building Regulations approval follows, because the Welsh Government says a new rooflight will generally need it.

What do the Welsh rules say about re-slating a New Radnor house?

The Welsh Government says: "In most situations, this work will need Building Regulations approval." Its roof page places the line at more than 25 per cent of the roof area, beyond which better insulation would normally be needed. Under the Welsh Approved Document L, Table 11.1 asks a renovated roof to reach 0.16 W/m²K, with 0.35 as the worst acceptable figure where 0.16 is not feasible.

Who checks Building Regulations on a New Radnor re-roof?

The council's building control service or a registered building control approver. In Wales the Welsh Ministers regulate local authorities, and the Building Safety Regulator oversees approvers and inspectors on their behalf. We ask which route you prefer before the work is priced, so the application and the programme line up. A reformed Welsh building control regime began on 1 July 2026, and we work to it.

Does re-covering a Grade II farm outbuilding in New Radnor need consent?

If the building is listed, yes. The Historic Environment (Wales) Act 2023 requires authorisation, through listed building consent, for works that touch its character (sections 88 and 89). A grade does not forbid repair; it means the slate, the fixings and the lead are agreed in advance. Bring any earlier consent or survey to the first visit. A building that is not listed still meets the ordinary planning and Building Regulations tests.

What sets the price of re-roofing a long New Radnor outbuilding?

Roof area, pitch, access, the covering chosen, the state of the timber beneath it, and whether a scaffold is needed. Each is recorded at the survey, and the answer comes as one written total. When you compare quotes, check that each is a single total for the same scope of work. Long gutter runs and a valley between two wings add work that a plain single-pitch roof does not carry, and a listed range adds consent time.

Book a ridge-first survey in New Radnor

A few lines on the roof are enough to start; add a picture if one exists. The survey runs ridge-first; one written total follows.

10-year workmanship guarantee, in writing