Callout 1 of 3
Reading a Kings Pyon stack from pots to lead
A chimney stack is the part of the roof that stands in the weather on every side, so a survey of a Kings Pyon house reaches it early. The Royal Commission's 1934 inventory of Herefordshire says of its monuments in the parish (numbers 4 to 13), unless otherwise stated, that they "are of the 17th century and of two storeys, timber-framed, and with tile, stone or slate-covered roofs". The county's stone atlas says the large external stacks of its timber-framed houses are "commonly of local sandstone", so the pointing between those stones matters as much as the lead.
We look at a stack in layers. First come the pots and the flaunching, which is the mortar collar sloped round their bases. We press the flaunching for soft, crumbling mortar and look for pots that have worked loose. Below that is the pointing between the stones, then the flashings, which are strips of lead let into the joints and dressed over the roof covering. Soakers, small lead pieces, are slipped beneath the covering at the sides of the stack, one for each course. Royston Lead's table gives Code 3 as "Recommended for lead soakers only" and lists Codes 4, 5 and 6 for flashings. A back gutter, the lead channel above the stack, turns rain round it. Photographs of each face go into the report with the lead and the flaunching. Where a stack leans or its stones have shifted, we tell you before any price is written.
A split or lifted sheet of lead is renewed; a smear of sealant is never the repair. MyJobQuote writes that lead flashing correctly installed "can last for over 80 years", so a sound sheet stays. Taking a stack down is a different job. The Planning Portal says "Building regulations approval will always apply when removing chimney breasts as they are part of the building's structure." If the breast sits against a wall you share, section 2(2)(g) of the Party Wall etc. Act 1996 lets the owner remove a projecting chimney breast, and the notice must reach the neighbour at least two months before any work begins on the wall. Our chimney repairs page goes further into rebuilding and repointing a stack.
At the stack
Why is the lead round a chimney checked before the brickwork?
Water can get past a stack at the lead, so a split or lifted sheet explains a stain on the ceiling long before crumbling mortar does. We test the lead first, then work down through the pointing and the flaunching.
The top of a stack is hidden from the lane, so the report pictures all four faces.















